Version 15 (modified by 13 years ago) (diff) | ,
---|
Instrumentation and Measurement (I&M) Working Session at the GEC-13
Tuesday, March 13, 10:00am-12noon and 1:30pm-3:00pm
Room:
Session leader: Harry Mussman (GENI Project Office, Raytheon BBN Technologies)
Description
This is the I&M working session that will review progress towards a comprehensive set of I&M tools for GENI experimenters and for infrastructure measurement.
It will start with reports from several of the design topic teams formed at the GEC-12 working session; these will include the contributions of the I&M projects continuing from Solicitation 2.
Then the two large Solicitation 3 I&M D&P projects, GIMI and GEMINI, will review their progress.
Finally, we will discuss how to support experimenters and infrastructure measurement.
Summary
Agenda
This is a tentative agenda, which may change.
1) Introductions
10:00am
2) Reports by I&M design topic teams
10:05am
At GEC12, nine I&M priority design topics were identified, and nine teams were assigned to understand and resolve these topics by GEC13.
See the list of topics, including a brief summary of each topic.
3) Adjourn
12noon
4) Update on GIMI project
1:30pm
PI: Mike Zink (UMass Amherst)
Co-PI/Key: Max Ott (NICTA); Ilia Baldine (RENCI); David Irwin (UMass Amherst); Thanasis Korakis (NYU Poly)
Goals:
Starts with OML, and provides easy-to-use tools for GENI environment
*First focus: I&M use cases for experiments, with default OML Client in nodes that gathers passive measurements like INSTOOLS, and provides basic node-to-node connectivity tests using ping and iperf
*Second focus: I&M use cases for infrastructure measurement
*Later focuse: add sensor measurement data, carried in data network
*Spiral 4 supported aggregates: ORCA servers/VMs and ExoGENI (RENCI) racks
*Later, support: WiMAX sites
*Spiral 5 supported aggregates: protoGENI/Emulab servers/VMs and InstaGENI (HP) racks
*Introduces XML messaging service, with pub/sub, in public IP space
*Introduces iRODS service for digital object archive.
Members of the GIMI project will review:
*Current architecture and design
*Current status
*Preview of tonight's GEC-13 demo
*Plan for GEC-14 tutorial
5) Update on GEMINI project
2pm
PI: Martin Swany (Indiana U)
Co-PI/Key: Chris Small (Indiana U); Eric Boyd (Internet2); Jim Griffioen (U Kentucky); Zongming Fei (U Kentucky)
; Hussamuddin Nasir (U Kentucky)
Goals:
Starts with LAMP, which provides flexible tools based on perfSONAR for active infrastructure measurements
++Fold INSTOOLS features into LAMP to form GEMINI tools, and then discontinue INSTOOLS
*First focus: I&M use cases for infrastructure measurement
*Include sharing of data with other users (e.g., operators), at an interface with authorization using a GENI credential
*Show how to monitor clusters/racks
*Show how to measure Layer 2 and OpenFlow paths (with input from OnTimeMeasure project)
*Second focus: I&M use cases for experiments
*Consider how to gather basic host measurements with BLiPP service (as was done by INSTOOLS using SNMP)
*Consider how to gather customized data from applications (as provided by OML Client)
++Extending LAMP with INSTOOLS features:
*Consider how to load tools on top of basic image
*Consider how to extend Periscope to include druple content management service
*Consider how to add xserver to basic node image, to login from portal using vnc protocol
*Continue separate portal service, which is really a gateway service, within a user workspace service
*Consider how to add interface to archive service, e.g., iRODs
*Spiral 4 supported aggregates: protoGENI/Emulab servers/VMs and InstaGENI (HP) racks
*Spiral 5 supported aggregates: ORCA servers/VMs and ExoGENI (RENCI) racks
*Continue INSTOOLS portal service, in user workspace, to find GUIs
*Continue LAMP local and global UNIS service, to register available measurement data, and network topology
Members of the GEMINI project will review:
*Current architecture and design
*Current status
*Preview of tonight's GEC-13 demo
*Plan for GEC-14 tutorial
6) Support for experimenters
2:30pm
7) Support for infrastructure measurement
2:45pm
8) Adjourn
3pm
Attachments (15)
-
GEC13_IMF_overview.pptx (1.3 MB) - added by 13 years ago.
IMF Project overview and status at GEC13
- T8) GENIUserToolsAndServices.pdf (231.8 KB) - added by 13 years ago.
- OnTimeMeasure_GEC13-I&M-Talk.pdf (216.2 KB) - added by 13 years ago.
- gemini-gec13.pptx (1.2 MB) - added by 13 years ago.
- GIMI GEC 13.pptx (1.4 MB) - added by 13 years ago.
- T2a) IM Uses Cases.pdf (537.4 KB) - added by 13 years ago.
- T2b) GENIUserToolsAndServices.pdf (231.9 KB) - added by 13 years ago.
- T5) MDOD Status - CNRI.pptx (202.9 KB) - added by 13 years ago.
- T7) GEC13.pdf (98.7 KB) - added by 13 years ago.
- T8) GENIUserToolsAndServices.2.pdf (231.9 KB) - added by 13 years ago.
- T9a) MDA_ProjectHighlights_GEC13 - CNRI.pptx (310.4 KB) - added by 13 years ago.
- T9b) gec13_irods_im_anirban.pptx (59.7 KB) - added by 13 years ago.
- T6)_GEC13_IMF_overview (1).pptx (1.3 MB) - added by 13 years ago.
- GIMI_GEC13_poster.pdf (1010.7 KB) - added by 13 years ago.
- GEC13 GEMINI Demo Poster V2.pdf (457.0 KB) - added by 13 years ago.