[[PageOutline]] = WiMAX Campus Deployments and Experiments = Friday, November 4, 2011, 1pm - 3pm [[BR]] Room: [[BR]] Session Leader: Harry Mussman, (GPO, Raytheon BBN Technologies) [[BR]] == Description == This session will first review the GENI WiMAX strategy, and then concentrate on plans for the new WiMAX site deployments and extensions that will be supported by Solicitation 3 projects. Next, goals for GENI WiMAX experiments will be presented, and finally current and planned experiments will be discussed. [[BR]] == Summary == == Agenda == This is a tentative agenda, which may change. [[BR]] NOTE: We have many topics to cover in a short time. PLEASE bring only the designated number of slides, and provide a link to additional information. THANKS! [[BR]] == 1) Introductions == 1pm [[BR]] == 2) GENI WiMAX Strategy == 1:05pm [[BR]] Harry Mussman (GPO) [[BR]] == 3) New (Sol 3) GENI WiMAX Site Deployments and Extensions == 1:20pm [[BR]] === 3.1) Airspan Profile-C Base Station, with Associated Hardware and Software === 1:20pm [[BR]] Ivan Seskar (WINLAB) and Harry Mussman (GPO) [[BR]] Airspan/Rutgers will provide a kit including: Airspan MacroMAXe profile-C WiMAX base station unit, for outside mounting[[BR]] Choice of frequency: (2510 Lo: 2496MHz to 2570MHz) [[BR]] (2510 Mid: 2560MHz to 2630MHz) [[BR]] (2510 Hi: 2620MHz to 2690MHz) [[BR]] (3650: 3650MHz to 3700MHz)] [[BR]] Sector antenna, with x4 RF jumper cables 2x4 MIMO, supported by base station and antenna GPS antenna, with surge suppressor and cable DC power cable, from base station unit (outside) to testbed (inside) Network management software license, 1 per base station Campus will need to provide: Pole for mounting DC power supply (-48v, approx 300W) Ethernet cable, from base station unit (outside) to testbed (inside) Windows server to host network management software Linux server to host OMF software Ethernet switches, and other network equipment, for access (configuration to be provided) Additional kits can be purchased from Airspan Price is approximately $15,000. It is expected that additional base stations kits can be purchased by GENI in Spiral 5. Thus, campus site might be able to add additional sectors, at no cost. Planning for next year will be done later this year. Or, you may === 3.2) WINLAB/Rutgers University Site Extension Plan === 1:25pm [[BR]] Ivan Seskar (WINLAB) [[BR]] NOTE: Only 2 slides! [[BR]] Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers. [[BR]] Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license. [[BR]] Choice of frequency: [[BR]] (2510 Lo: 2496MHz to 2570MHz) [[BR]] (2510 Mid: 2560MHz to 2630MHz) [[BR]] (2510 Hi: 2620MHz to 2690MHz) [[BR]] (3650: 3650MHz to 3700MHz)] [[BR]] Issues you face. [[BR]] Link to your plan. [[BR]] === 3.2) UCLA Site Extension Plans === 1:30pm [[BR]] Giovanni Pau (UCLA) and Mario Gerla (UCLA) [[BR]] NOTE: Only 2 slides! [[BR]] Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers. [[BR]] Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license. [[BR]] Choice of frequency: [[BR]] (2510 Lo: 2496MHz to 2570MHz) [[BR]] (2510 Mid: 2560MHz to 2630MHz) [[BR]] (2510 Hi: 2620MHz to 2690MHz) [[BR]] (3650: 3650MHz to 3700MHz)] [[BR]] Issues you face. [[BR]] Link to your plan. [[BR]] === 3.3) Clemson University Site Deployment Plan === 1:35pm [[BR]] K-C Wang (Clemson) NOTE: Only 2 slides! [[BR]] Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers. [[BR]] Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license. [[BR]] Choice of frequency: [[BR]] (2510 Lo: 2496MHz to 2570MHz) [[BR]] (2510 Mid: 2560MHz to 2630MHz) [[BR]] (2510 Hi: 2620MHz to 2690MHz) [[BR]] (3650: 3650MHz to 3700MHz)] [[BR]] Issues you face. [[BR]] Link to your plan. [[BR]] === 3.4) University of Wisconsin Site Extension Plan === 1:40pm [[BR]] Suman Banerjee (Wisconsin) [[BR]] NOTE: Only 2 slides! [[BR]] Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers. [[BR]] Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license. [[BR]] Choice of frequency: [[BR]] (2510 Lo: 2496MHz to 2570MHz) [[BR]] (2510 Mid: 2560MHz to 2630MHz) [[BR]] (2510 Hi: 2620MHz to 2690MHz) [[BR]] (3650: 3650MHz to 3700MHz)] [[BR]] Issues you face. [[BR]] Link to your plan. [[BR]] === 3.5) University of Michigan Site Deployment Plan === 1:45pm [[BR]] Morley Mao (Michigan) [[BR]] NOTE: Only 2 slides! [[BR]] Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers. [[BR]] Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license. [[BR]] Choice of frequency: [[BR]] (2510 Lo: 2496MHz to 2570MHz) [[BR]] (2510 Mid: 2560MHz to 2630MHz) [[BR]] (2510 Hi: 2620MHz to 2690MHz) [[BR]] (3650: 3650MHz to 3700MHz)] [[BR]] Issues you face. [[BR]] Link to your plan. [[BR]] === 3.6) Wayne State University Site Deployment Plan === 1:50pm [[BR]] Hongwei Zhang (Wayne State) [[BR]] NOTE: Only 2 slides! [[BR]] Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers. [[BR]] Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license. [[BR]] Choice of frequency: [[BR]] (2510 Lo: 2496MHz to 2570MHz) [[BR]] (2510 Mid: 2560MHz to 2630MHz) [[BR]] (2510 Hi: 2620MHz to 2690MHz) [[BR]] (3650: 3650MHz to 3700MHz)] [[BR]] Issues you face. [[BR]] Link to your plan. [[BR]] === 3.7) Discussion of Deployment Issues and Suggestions from Current Sites === 1:55pm [[BR]] Moderator: Harry Mussman (GPO) [[BR]] == 4) GENI WiMAX Experiments == 2:10pm [[BR]] === 4.1) Goals === 2:10pm [[BR]] Harry Mussman (GPO) [[BR]] === 4.2) Throughput Experiment Using iperf === 2:15pm [[BR]] Manu Gosain (GPO) [[BR]] === 4.3) Throughput Experiment Using Bit Torrent === 2:20pm [[BR]] Fraida Fund (NYU Poly) [[BR]] === 4.4) Raw IP and UDP Traffic Generators === 2:25pm [[BR]] Surat (Au) Teerapittayanon (MIT) [[BR]] === 4.5) Using OMF and OML in Your Experiment === 2:30pm [[BR]] Christoph Dwertmann (NICTA) [[BR]] === 4.6) Multiple Site Experiment: Mobility First === 2:35pm [[BR]] Kiran Nagaraja (WINLAB) [[BR]] === 4.7) Experiment Plans and Issues === 2:40pm [[BR]] Moderator: Harry Mussman (GPO) [[BR]] == 5) GENI WiMAX Strategy Issues == 2:55pm [[BR]] Moderator: Harry Mussman (GPO) [[BR]] == 6) Adjourn == 3pm [[BR]]