wiki:GEC12WiMaxDeploymentAndExperimentation

Version 8 (modified by hmussman@bbn.com, 12 years ago) (diff)

--

WiMAX Campus Deployments and Experiments

Friday, November 4, 2011, 1pm - 3pm
Room:
Session Leader: Harry Mussman, (GPO, Raytheon BBN Technologies)

Description

This session will first review the GENI WiMAX strategy, and then concentrate on plans for the new WiMAX site deployments and extensions that will be supported by Solicitation 3 projects. Next, goals for GENI WiMAX experiments will be presented, and finally current and planned experiments will be discussed.

Summary

Agenda

This is a tentative agenda, which may change.

NOTE: We have many topics to cover in a short time. PLEASE bring only the designated number of slides, and provide a link to additional information. THANKS!

1) Introductions

1pm

2) GENI WiMAX Strategy

1:05pm
Harry Mussman (GPO)

3) New (Sol 3) GENI WiMAX Site Deployments and Extensions

1:20pm

3.1) Airspan Profile-C Base Station, with Associated Hardware and Software

1:20pm
Ivan Seskar (WINLAB) and Harry Mussman (GPO)

or utilize existing campus Educational Broadband Services (EBS) license. [Note: Rutgers needs to know the frequency band you will be using by 11/30/11 so that they can pace the order for Airspan base station hardware; you should receive Airspan base station hardware from Rutgers by 1/31/12. (2510 Lo: 2496MHz to 2570MHz) OR (2510 Mid: 2560MHz to 2630MHz) OR (2510 Hi: 2620MHz to 2690MHz) OR (3650: 3650MHz to 3700MHz)]

3.2) WINLAB/Rutgers University Site Extension Plan

1:25pm
Ivan Seskar (WINLAB)

NOTE: Only 2 slides!

Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers.
Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license.
Choice of frequency:

(2510 Lo: 2496MHz to 2570MHz)
(2510 Mid: 2560MHz to 2630MHz)
(2510 Hi: 2620MHz to 2690MHz)
(3650: 3650MHz to 3700MHz)]

Issues you face.
Link to your plan.

3.2) UCLA Site Extension Plans

1:30pm
Giovanni Pau (UCLA) and Mario Gerla (UCLA)

NOTE: Only 2 slides!

Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers.
Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license.
Choice of frequency:

(2510 Lo: 2496MHz to 2570MHz)
(2510 Mid: 2560MHz to 2630MHz)
(2510 Hi: 2620MHz to 2690MHz)
(3650: 3650MHz to 3700MHz)]

Issues you face.
Link to your plan.

3.3) Clemson University Site Deployment Plan

1:35pm
K-C Wang (Clemson)

NOTE: Only 2 slides!

Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers.
Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license.
Choice of frequency:

(2510 Lo: 2496MHz to 2570MHz)
(2510 Mid: 2560MHz to 2630MHz)
(2510 Hi: 2620MHz to 2690MHz)
(3650: 3650MHz to 3700MHz)]

Issues you face.
Link to your plan.

3.4) University of Wisconsin Site Extension Plan

1:40pm
Suman Banerjee (Wisconsin)

NOTE: Only 2 slides!

Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers.
Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license.
Choice of frequency:

(2510 Lo: 2496MHz to 2570MHz)
(2510 Mid: 2560MHz to 2630MHz)
(2510 Hi: 2620MHz to 2690MHz)
(3650: 3650MHz to 3700MHz)]

Issues you face.
Link to your plan.

3.5) University of Michigan Site Deployment Plan

1:45pm
Morley Mao (Michigan)

NOTE: Only 2 slides!

Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers.
Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license.
Choice of frequency:

(2510 Lo: 2496MHz to 2570MHz)
(2510 Mid: 2560MHz to 2630MHz)
(2510 Hi: 2620MHz to 2690MHz)
(3650: 3650MHz to 3700MHz)]

Issues you face.
Link to your plan.

3.6) Wayne State University Site Deployment Plan

1:50pm
Hongwei Zhang (Wayne State)

NOTE: Only 2 slides!

Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers.
Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license.
Choice of frequency:

(2510 Lo: 2496MHz to 2570MHz)
(2510 Mid: 2560MHz to 2630MHz)
(2510 Hi: 2620MHz to 2690MHz)
(3650: 3650MHz to 3700MHz)]

Issues you face.
Link to your plan.

3.7) Discussion of Deployment Issues and Suggestions from Current Sites

1:55pm
Moderator: Harry Mussman (GPO)

4) GENI WiMAX Experiments

2:10pm

4.1) Goals

2:10pm
Harry Mussman (GPO)

4.2) Throughput Experiment Using iperf

2:15pm
Manu Gosain (GPO)

4.3) Throughput Experiment Using Bit Torrent

2:20pm
Fraida Fund (NYU Poly)

4.4) Raw IP and UDP Traffic Generators

2:25pm
Surat (Au) Teerapittayanon (MIT)

4.5) Using OMF and OML in Your Experiment

2:30pm
Christoph Dwertmann (NICTA)

4.6) Multiple Site Experiment: Mobility First

2:35pm
Kiran Nagaraja (WINLAB)

4.7) Experiment Plans and Issues

2:40pm
Moderator: Harry Mussman (GPO)

5) GENI WiMAX Strategy Issues

2:55pm
Moderator: Harry Mussman (GPO)

6) Adjourn

3pm

Attachments (14)