Changes between Version 6 and Version 7 of GEC12WiMaxDeploymentAndExperimentation


Ignore:
Timestamp:
11/01/11 16:52:43 (12 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC12WiMaxDeploymentAndExperimentation

    v6 v7  
    4646
    4747NOTE:  Only 2 slides  [[BR]]
    48   Outline basic deployment plan for Year 1, including access facilities and switches,  plus associated servers.  [[BR]]
    49   Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license.   Choice of frequency:  (2510 Lo:  2496MHz to 2570MHz)  OR  (2510 Mid:  2560MHz to 2630MHz)  OR  (2510 Hi:  2620MHz to 2690MHz) OR (3650: 3650MHz to 3700MHz)]  [[BR]]
    50   Link to your plan.  [[BR]]
     48
     49Outline basic deployment plan for Year 1, including access facilities and switches,  plus associated servers.  [[BR]]
     50Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license.   Choice of frequency:  (2510 Lo:  2496MHz to 2570MHz)  OR  (2510 Mid:  2560MHz to 2630MHz)  OR  (2510 Hi:  2620MHz to 2690MHz) OR (3650: 3650MHz to 3700MHz)]  [[BR]]
     51Link to your plan.  [[BR]]
    5152 
    5253=== 3.4)  University of Wisconsin Site Extension Plan ===