Changes between Version 5 and Version 6 of GEC12WiMaxDeploymentAndExperimentation


Ignore:
Timestamp:
11/01/11 16:51:40 (13 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC12WiMaxDeploymentAndExperimentation

    v5 v6  
    11[[PageOutline]]
    22
    3 = WiMAX Campus Deployments and Experimentats =
     3= WiMAX Campus Deployments and Experiments =
    44Friday,  November 4, 2011, 1pm - 3pm [[BR]]
    55Room:     [[BR]]
     
    1616This is a tentative agenda, which may change. [[BR]]
    1717
    18 NOTE:  We have many topics to cover in a short time.  PLEASE bring only the designated number of slides, and provide a link to additional information.  THANKS!
     18NOTE:  We have many topics to cover in a short time.  PLEASE bring only the designated number of slides, and provide a link to additional information.  THANKS!  [[BR]]
    1919
    2020== 1)  Introductions ==
     
    3232Ivan Seskar (WINLAB) and Harry Mussman (GPO) [[BR]]
    3333
     34or utilize existing campus Educational Broadband Services (EBS) license.   [Note:  Rutgers needs to know the frequency band you will be using by 11/30/11 so that they can pace the order for Airspan base station hardware;  you should receive Airspan base station hardware from Rutgers by 1/31/12.  (2510 Lo:  2496MHz to 2570MHz)  OR  (2510 Mid:  2560MHz to 2630MHz)  OR  (2510 Hi:  2620MHz to 2690MHz) OR (3650: 3650MHz to 3700MHz)]
     35
     36
    3437=== 3.2)  Rutgers University and UCLA Site Extension Plans ===
    35381:25pm  [[BR]]
    3639Ivan Seskar (WINLAB) and Giovanni Pau (UCLA)  [[BR]]
     40
     41
    3742
    3843=== 3.3)  Clemson University Site Deployment Plan ===
     
    4045K-C Wang (Clemson)
    4146
     47NOTE:  Only 2 slides  [[BR]]
     48  Outline basic deployment plan for Year 1, including access facilities and switches,  plus associated servers.  [[BR]]
     49  Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license.   Choice of frequency:  (2510 Lo:  2496MHz to 2570MHz)  OR  (2510 Mid:  2560MHz to 2630MHz)  OR  (2510 Hi:  2620MHz to 2690MHz) OR (3650: 3650MHz to 3700MHz)]  [[BR]]
     50  Link to your plan.  [[BR]]
     51 
    4252=== 3.4)  University of Wisconsin Site Extension Plan ===
    43531:35pm  [[BR]]
     
    93103
    94104
    95 == 5)  GENI WiMAX Issues ==
     105== 5)  GENI WiMAX Strategy Issues ==
    961062:50pm  [[BR]]
    97107Moderator:  Harry Mussman (GPO)  [[BR]]