Changes between Version 5 and Version 6 of GEC12WiMaxDeploymentAndExperimentation
- Timestamp:
- 11/01/11 16:51:40 (13 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GEC12WiMaxDeploymentAndExperimentation
v5 v6 1 1 [[PageOutline]] 2 2 3 = WiMAX Campus Deployments and Experiment ats =3 = WiMAX Campus Deployments and Experiments = 4 4 Friday, November 4, 2011, 1pm - 3pm [[BR]] 5 5 Room: [[BR]] … … 16 16 This is a tentative agenda, which may change. [[BR]] 17 17 18 NOTE: We have many topics to cover in a short time. PLEASE bring only the designated number of slides, and provide a link to additional information. THANKS! 18 NOTE: We have many topics to cover in a short time. PLEASE bring only the designated number of slides, and provide a link to additional information. THANKS! [[BR]] 19 19 20 20 == 1) Introductions == … … 32 32 Ivan Seskar (WINLAB) and Harry Mussman (GPO) [[BR]] 33 33 34 or utilize existing campus Educational Broadband Services (EBS) license. [Note: Rutgers needs to know the frequency band you will be using by 11/30/11 so that they can pace the order for Airspan base station hardware; you should receive Airspan base station hardware from Rutgers by 1/31/12. (2510 Lo: 2496MHz to 2570MHz) OR (2510 Mid: 2560MHz to 2630MHz) OR (2510 Hi: 2620MHz to 2690MHz) OR (3650: 3650MHz to 3700MHz)] 35 36 34 37 === 3.2) Rutgers University and UCLA Site Extension Plans === 35 38 1:25pm [[BR]] 36 39 Ivan Seskar (WINLAB) and Giovanni Pau (UCLA) [[BR]] 40 41 37 42 38 43 === 3.3) Clemson University Site Deployment Plan === … … 40 45 K-C Wang (Clemson) 41 46 47 NOTE: Only 2 slides [[BR]] 48 Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers. [[BR]] 49 Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license. Choice of frequency: (2510 Lo: 2496MHz to 2570MHz) OR (2510 Mid: 2560MHz to 2630MHz) OR (2510 Hi: 2620MHz to 2690MHz) OR (3650: 3650MHz to 3700MHz)] [[BR]] 50 Link to your plan. [[BR]] 51 42 52 === 3.4) University of Wisconsin Site Extension Plan === 43 53 1:35pm [[BR]] … … 93 103 94 104 95 == 5) GENI WiMAX Issues ==105 == 5) GENI WiMAX Strategy Issues == 96 106 2:50pm [[BR]] 97 107 Moderator: Harry Mussman (GPO) [[BR]]