Changes between Version 41 and Version 42 of GEC12InstMeasWorkingSession


Ignore:
Timestamp:
11/02/11 09:07:33 (12 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC12InstMeasWorkingSession

    v41 v42  
    2525
    2626Goals:[[BR]]
    27 **Provide broad data gathering, analysis and archival capability that is sufficient for scientific mission, operations, and success of the infrastructure.
    28 
    29 **Remove the burden on researcher to become a system and network measurement infrastructure expert so that researcher can better focus on the science in the experiments
    30 
    31 **Follow defined I&M architecture
     27**Provide broad data gathering, analysis and archival capability that is sufficient for scientific mission, operations, and success of the infrastructure. [[BR]]
     28
     29**Remove the burden on researcher to become a system and network measurement infrastructure expert so that researcher can better focus on the science in the experiments [[BR]]
     30
     31**Follow defined I&M architecture [[BR]]
    3232 
    33 Approach:
    34 ** Two large I&M projects (GIMI and GEMINI) approved from Sol 3, which include groups that have provided OML, INSTOOLS and LAMP/perfSONAR tools
    35 
    36 **SOWS for remaining Year 3 of Sol 2 I&M projects focused on key topics that need to be resolved
    37 
    38 Architecture:
     33Approach:  [[BR]]
     34** Two large I&M projects (GIMI and GEMINI) approved from Sol 3, which include groups that have provided OML, INSTOOLS and LAMP/perfSONAR tools  [[BR]]
     35
     36**SOWS for remaining Year 3 of Sol 2 I&M projects focused on key topics that need to be resolved [[BR]]
     37
     38Architecture: [[BR]]
    3939
    4040Figure 1    GENI I&M Services and Messages [[BR]]