Changes between Version 38 and Version 39 of GEC10WiMaxCampusDeployment


Ignore:
Timestamp:
04/05/11 12:12:51 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC10WiMaxCampusDeployment

    v38 v39  
    169169
    170170
    171 || Campus                          || Who || Range and throughput measurements || Site planning || Local experiments || Experimenter support || Comments ||
    172 || Columbia University             || Jan Janak || - || Had to relocate planned site || - || - || -  ||
    173 || Polytechnic Institute of NYU    || Thanasis Korakis  || - || Yes || Yes || Yes || Yes || ? || Outdoor measurements and experiments underway
    174 || University of California, Los Angeles || Giovanni Pau || - || Yes || Intel 5130 modem || Installed, not yet using || x || Campus via CENIC to I2 for Internet;  $40k charge || Outdoor measurements underway
    175 || University of Colorado, Boulder || Dirk Grunwald || - || Ready to turnup || ? || x || x || Pricing campus tunnel to I2 || Working with campus IT on testing their network.
    176 || University of Massachusetts || Brian Lynn || Yes || Waiting for contract || Yes, with USB, under Xen || x || NA || Requesting 2nd VLAN || Facility plan revised;  prelim shading analysis completed
    177 || University of Wisconsin, Madison ||Derek Meyer || - || Yes || Windows dongle || x || x || I2 is in next lab || Outdoor measurements underway
    178 || BBN Technologies || Manu Gosain || - || Yes ||Yes || Yes || started || I2, NLR || Outdoor measurements and experiments underway
    179 || Rutgers University || Ivan Seskar || - || Yes || Yes || Yes || Yes || I2 || Plan Bush Campus install when?
     171|| Campus                          || Who || Site planning || Range and throughput measurements || Local experiments || Experimenter support || Comments ||
     172|| Columbia University             || Jan Janak || Tall building, urban setting;  have had to move site || - || - || - || -  ||
     173|| Polytechnic Institute of NYU    || Thanasis Korakis  || Tall building, urban setting || Completed, up to 12Mbps DL, much less UL; many variations || ParkNet completed for GEC9;  two more being planned || - || - ||
     174|| University of California, Los Angeles || Giovanni Pau || Tall building, urban setting || Completed, up to 14Mbps DL and 2 - 3 Mb/s UL; connections to 300M (0.xmi) || Handover WiAMX to WiFi || - || - ||
     175|| University of Colorado, Boulder || Dirk Grunwald || x story building, campus setting || - || - || - || Studying U Colorado private network, built by Airspan;  starting data modeling using Anritsu MS2721B with WiMAX demodulator;  acquiring propagation based model from Airspan deployment ||
     176|| University of Massachusetts || Brian Lynn || Both omni and sector antennas planned for top of 17-story building; prelim shading analysis completed; expect shading near building, but CS building not in shadow, approx 0.5 mi away  || - || - || Would like coverage to busses in downtown Amherst, 1 mi away;  can this be done? ||
     177|| University of Wisconsin, Madison ||Derek Meyer || 150 ft high, campus setting || Seen connectivity up to 300 yd || - || - || Existing Cisco system:  Connectivity to buses, equipped with large client antenna, up to 500M, for coverage over 1.25 sq mi. ||
     178|| BBN Technologies || Manu Gosain || 90 ft high, urban setting || Good throughput (up to 14Mb/s DL and 1 - 2 Mb/s UL) to 0.25 mi, but not yet further || Range and throughput, with scripts || For MIT and possibly Clemson || - ||
     179|| Rutgers University || Ivan Seskar || 1 story building, suburban setting || RSSI measurements completed || ParkNet || Possibly Clemson || When will install be completed on Busch campus? ||
    180180
    181181