49 | | Earlier summary: Antenna on 10th floor, -5deg tilt; Windows laptop with USB-connected 6250; seeing 14Mb/s DL, 1 Mb/s UL;; connect to vehicle up to 230 m; done handoff WiMAX to WiFi; heavy rain doubled delay (why?) ; $40k to install link to I2; installed WiMAX RF AggMgr, but not yet in use. [[BR]] |
50 | | Summary: Connected to vehicle up to 300M; client always receives, but cannot always connect; helped by setting client IP address; windows client works better than Linux client; seen throughput to 14Mb/s DL and 2 - 3 Mbs/ UL; done load tests with 4 of 11 Intel 5150 clients; done seamless integration with WiFi. [[BR]] |
| 51 | Summary: Antenna on 10th floor, -5deg tilt. [[BR]] |
| 52 | Windows laptop with USB-connected 6250. [[BR]] |
| 53 | Seeing 14Mb/s DL, 2 - 3 Mb/s UL; connect to vehicle up to 300 m; client always receives, but cannot always connect; helped by setting client IP address; windows client works better than Linux client. [[BR]] |
| 54 | Done handoff WiMAX to WiFi; heavy rain doubled delay (why?) [[BR]] |
| 55 | $40k to install link to I2.[[BR]] |
| 56 | Installed WiMAX RF AggMgr, but not yet in use.[[BR]] |
| 57 | Planning load tests with large number of clients. [[BR]] |
55 | | Summary: NEC BTS installed, and ready for turnup. Operating in A4/B4 block; also Clearwire; also U Colorado private network, built by Airspan. Starting data modeling using Anritsu MS2721B with WiMAX demodulator; acquiring propagation based model from Airspan deployment. [[BR]] |
56 | | References: Airspan plan for U Colorado [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/UoC%20-%20MacroMAXe%20RF%20Plan%20V1.1.pptx slides]. MS thesis on "Field Study of WiMMX Performance" [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/Gronsund_Pal_master.pdf text]. [[BR]] |
| 62 | Summary: NEC BTS installed, and ready for turnup. [[BR]] |
| 63 | Operating in A4/B4 block; also Clearwire; also U Colorado private network, built by Airspan. [[BR]] |
| 64 | Starting data modeling using Anritsu MS2721B with WiMAX demodulator; acquiring propagation based model from Airspan deployment. [[BR]] |
| 65 | Reference: Airspan plan for U Colorado [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/UoC%20-%20MacroMAXe%20RF%20Plan%20V1.1.pptx slides]. [[BR]] |
| 66 | Reference: MS thesis on "Field Study of WiMAX Performance" [[BR]][http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/Gronsund_Pal_master.pdf text]. [[BR]] |
58 | | UMass Amherst (1731) PI: Mark Corner, Brian Lynn Mark: [[BR]] |
59 | | Status: [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/UMassWimax-GEC10.pdf slides] [BR]] |
60 | | Summary: Working inside, client to base station, to ASN GW data path. Ready to sign contract for installation on top of 17-story building; both omni and sector antennas, manual switch; expect shading near building, but CS building not in shadow, approx 0.5 mi away. Will deploy on x3 DOME busses later this year; currently antenna will be inside of the bus. [[BR]] |
| 68 | UMass Amherst (1731) PI: Mark Corner, Brian Lynn [[BR]] |
| 69 | Status: [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/UMassWimax-GEC10.pdf slides] [[BR]] |
| 70 | Summary: Working inside, data path from client, to base station, to ASN GW. [[BR]] |
| 71 | Ready to sign contract for installation on top of 17-story building.[[BR]] |
| 72 | Both omni and sector antennas, manual switch; expect shading near building, but CS building not in shadow, approx 0.5 mi away. [[BR]] |
| 73 | Will deploy on x3 DOME busses later this year; currently antenna will be inside of the bus. [[BR]] |
65 | | Wisconsin (1724) PI: Suman Banerjee Derek Meyer: [[BR]] |
66 | | Status: [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/UW%20Madison%20%20Korakis_GENI_WiMAX_GEC10.ppt slides] |
67 | | Summary: Have base station installed and working, with sector antenna 150 ft high, 10 deg tilt. Using dongle with Windows 7 PC; seen RSSI from -40 dbm down to -60 dbm. Have seen connectivity up to 300 yds. [[BR]] |
68 | | Existing Cisco system: Connectivity to buses, equipped with large client antenna, up to 500M, for coverage over 1.25 sq mi. |
| 78 | Wisconsin (1724) PI: Suman Banerjee and Derek Meyer: [[BR]] |
| 79 | Status: [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/UW%20Madison%20%20Korakis_GENI_WiMAX_GEC10.ppt slides] [[BR]] |
| 80 | Summary: Have base station installed and working, with sector antenna 150 ft high, 10 deg tilt. [[BR]] |
| 81 | Using dongle with Windows 7 PC; seen RSSI from -40 dbm down to -60 dbm; have seen connectivity up to 300 yds. [[BR]] |
| 82 | Existing Cisco system: Connectivity to buses, equipped with large client antenna, up to 500M, for coverage over 1.25 sq mi.[[BR]] |
84 | | || Columbia University || Jan Janak || Yes || Hope for early March || Yes || x || x || ? || Indoor testing started; received info request from Clearwire |
85 | | || Polytechnic Institute of NYU || Thanasis Korakis || - || Yes || Yes || Yes || ? || ? || Working on mobile stations and measurements |
86 | | || University of California, Los Angeles || Giovanni Pau || - || Yes || Intel 5130 modem || Installed, not yet using || x || Campus via CENIC to I2 for Internet; $40k charge || Outdoor testing starting |
87 | | || University of Colorado, Boulder || Dirk Grunwald || Yes || Installation starting Monday ||x || x || x || Pricing campus tunnel to I2 || Working with campus IT; outdoor testing started |
| 100 | || Columbia University || Jan Janak || Yes || Waiting for contract || Yes || Yes || x || ? || Indoor testing started; received info request from Clearwire |
| 101 | || Polytechnic Institute of NYU || Thanasis Korakis || - || Yes || Yes || Yes || Yes || ? || Outdoor measurements and experiments underway |
| 102 | || University of California, Los Angeles || Giovanni Pau || - || Yes || Intel 5130 modem || Installed, not yet using || x || Campus via CENIC to I2 for Internet; $40k charge || Outdoor measurements underway |
| 103 | || University of Colorado, Boulder || Dirk Grunwald || Yes || Ready to turnup ||x || x || x || Pricing campus tunnel to I2 || Working with campus IT; outdoor testing started |