Changes between Version 27 and Version 28 of GEC10WiMaxCampusDeployment


Ignore:
Timestamp:
04/04/11 15:00:31 (13 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC10WiMaxCampusDeployment

    v27 v28  
    5151  Poster from demo session:  [  poster]  [[BR]]
    5252
    53   Colorado: (1768) PI: Dirk Grunwald Univ. of Colorado, Boulder  [[BR]]
     53  Colorado: (1768) PI: Dirk Grunwald Univ. of Colorado, Boulder  Dirk:  [[BR]]
    5454  Status:  [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/Colorado%20-%20Status%20-%20March%20-%202011.pptx  slides] [[BR]]
    5555  Summary:   NEC BTS installed, and ready for turnup.  Operating in A4/B4 block;  also Clearwire;  also U Colorado private network, built by Airspan.  Starting data modeling using Anritsu MS2721B with WiMAX demodulator;  acquiring propagation based model from Airspan deployment.  [[BR]]
    56   References:  Airspan plan for U Colorado [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/UoC%20-%20MacroMAXe%20RF%20Plan%20V1.1.pptx  slides].  MS thesis on "Field Study of WiMMX Performance"  [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/Gronsund_Pal_master.pdf  text].
     56  References:  Airspan plan for U Colorado [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/UoC%20-%20MacroMAXe%20RF%20Plan%20V1.1.pptx  slides].  MS thesis on "Field Study of WiMMX Performance"  [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/Gronsund_Pal_master.pdf  text]. [[BR]]
    5757
    58 
    59 email from Dirk: We've changed the mounting location because we think the wind profile of the antenna makes the mounting system on top of the other building questionable. We regularly get 40-60mph winds this time of year.[[BR]]
    60 
    61   We've already selected the new location. It's one of the two locations where our campus is installing their own WiMAX equipment. There is a spare pole & mount already in place, so that simplifies installation. We have to install the "IDU" in a weatherized metal enclosure. Installation starts next Monday. The parts have been ordered this week & installation is being done by our campus IT group and professional building maintenance people.[[BR]]
    62 
    63   We also have a professional RF propagation survey done from this location. I've attached that as a PPT. This is for the (now) existing WiMAX system our campus has put up. Our antenna will be pointing due north. The existing propagation model doesn't include our system yet, and we're getting that done -- this will provide a model that we will calibrate using the signal analyzer and RF cards.  [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/UoC%20-%20MacroMAXe%20RF%20Plan%20V1.1.pptx  slides] [[BR]]
    64 
    65   UMass Amherst (1731)  PI:  Mark Corner, Brian Lynn    Brian: [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/UMassWimax-2011-02-23.pdf  slides] Have 6250 modem working with brick.  Have data path working;  have requested a second VLAN from IT.  [[BR]]
     58  UMass Amherst (1731)  PI:  Mark Corner, Brian Lynn    Mark: [[BR]]
     59  Status:  [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/UMassWimax-2011-02-23.pdf  slides] [BR]]
     60  Summary:  Have 6250 modem working with brick.  Have data path working;  have requested a second VLAN from IT.  [[BR]]
    6661       
    6762  Wisconsin (1724)      PI: Suman Banerjee   Derek Meyer: [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/2011_2_23_Geni_Conference.pdf  slides] Have 6250 modem working.  Installation in progress. [[BR]]