Changes between Version 26 and Version 27 of GEC10WiMaxCampusDeployment


Ignore:
Timestamp:
04/04/11 14:57:41 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC10WiMaxCampusDeployment

    v26 v27  
    5454  Status:  [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/Colorado%20-%20Status%20-%20March%20-%202011.pptx  slides] [[BR]]
    5555  Summary:   NEC BTS installed, and ready for turnup.  Operating in A4/B4 block;  also Clearwire;  also U Colorado private network, built by Airspan.  Starting data modeling using Anritsu MS2721B with WiMAX demodulator;  acquiring propagation based model from Airspan deployment.  [[BR]]
    56   References:  Airspan plan for U Colorado [  slides].  MS thesis on "Field Study of WiMMX Performance"  [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/Gronsund_Pal_master.pdf  text].
     56  References:  Airspan plan for U Colorado [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/UoC%20-%20MacroMAXe%20RF%20Plan%20V1.1.pptx  slides].  MS thesis on "Field Study of WiMMX Performance"  [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/Gronsund_Pal_master.pdf  text].
    5757
    5858