Changes between Version 24 and Version 25 of GEC10WiMaxCampusDeployment


Ignore:
Timestamp:
04/04/11 14:54:41 (13 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC10WiMaxCampusDeployment

    v24 v25  
    5252
    5353  Colorado: (1768) PI: Dirk Grunwald Univ. of Colorado, Boulder  [[BR]]
     54  Status:  [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/Colorado%20-%20Status%20-%20March%20-%202011.pptx  slides] [[BR]]
     55  Summary:   NEC BTS installed, and ready for turnup.  Operating in A4/B4 block;  also Clearwire;  also U Colorado private network, built by Airspan.  Starting data modeling using Anritsu MS2721B with WiMAX demodulator;  acquiring propagation based model from Airspan deployment.  [[BR]]
     56  References:  Airspan plan for U Colorado [  slides].  MS thesis on "Field Study of WiMMX Performance"  [  text].
    5457
    55   email from Dirk: We've changed the mounting location because we think the wind profile of the antenna makes the mounting system on top of the other building questionable. We regularly get 40-60mph winds this time of year.[[BR]]
     58
     59email from Dirk: We've changed the mounting location because we think the wind profile of the antenna makes the mounting system on top of the other building questionable. We regularly get 40-60mph winds this time of year.[[BR]]
    5660
    5761  We've already selected the new location. It's one of the two locations where our campus is installing their own WiMAX equipment. There is a spare pole & mount already in place, so that simplifies installation. We have to install the "IDU" in a weatherized metal enclosure. Installation starts next Monday. The parts have been ordered this week & installation is being done by our campus IT group and professional building maintenance people.[[BR]]