Changes between Version 20 and Version 21 of GEC10WiMaxCampusDeployment
- Timestamp:
- 04/04/11 14:29:55 (13 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GEC10WiMaxCampusDeployment
v20 v21 23 23 NEC Laboratories America Sampath Rangarajan, Rajesh Mahindra [[BR]] 24 24 WINLAB Ivan Seskar [[BR]] 25 Columbia Univ !SungHoon Seo, Jan Janak [[BR]]25 Columbia Univ Sung-Hoon Seo, Jan Janak [[BR]] 26 26 Polytechnic Institute of NYU Thanasis Korakis [[BR]] 27 27 UCLA Giovanni Pau, two students[[BR]] … … 37 37 == Deployment Status (one slide from each campus) == 38 38 39 Columbia University (1770) PI: Henning Schulzrinne, !SungHoon Seo and Jan Janak: [[BR]] 40 39 Columbia University (1770) PI: Henning Schulzrinne, Sung-Hoon Seo and Jan Janak: [[BR]] 41 40 Status: [attachment:columbia_031711.ppt slides] [[BR]] 42 Summary: W aiting for contract approval and installation; hoping for early March. [[BR]]41 Summary: Working indoors; ready to use WiMAX RF AggMgr. Waiting for contract approval and installation outdoors; hoping for early March. [[BR]] 43 42 44 Polytechnic Institute of NYU (1751) PI: Thanasis Korakis Thanasis: [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/Poly_WiMAX_Feb_2011.ppt slides] Installed and using WiMAX RF AggMgr. [[BR]] 43 Polytechnic Institute of NYU (1751) PI: Thanasis Korakis Thanasis [[BR]] 44 Status: [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/Poly_WiMAX_Feb_2011.ppt slides] [[BR]] 45 Summary: Installed; using WiMAX RF AggMgr. Completed basic range and throughput measurements; see below. Begun work on two additional experiments. [[BR]] 45 46 46 47 UCLA (1797) PI: Mario Gerla, Giovanni Pau Giovanni: Antenna on 10th floor, -5deg tilt; Windows laptop with USB-connected 6250; seeing 14Mb/s DL, 1 Mb/s UL;; connect to vehicle up to 230 m; done handoff WiMAX to WiFi; heavy rain doubled delay (why?) ; $40k to install link to I2; isntalled WiMAX RF AggMgr, but not yet in use; will do range measurements by GEC10. [[BR]]