Changes between Version 1 and Version 2 of GEC10WiMaxCampusDeployment


Ignore:
Timestamp:
02/04/11 18:20:29 (13 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC10WiMaxCampusDeployment

    v1 v2  
    88Session Leader:  Harry Mussman (GPO, Raytheon BBN Technologies)  [[BR]]
    99
     10== Description ==
     11
     12The projects involved in deploying WiMAX base stations will review their current status and progress towards their Spiral 3 roadmap goals.
     13
    1014== Agenda ==
     15
     16This is a tentative agenda, and is expected to change.
    1117
    1218=== Introductions  ===
     
    1420=== 1)  WiMAX Base Station Installation, Setup and Initial Operation ===
    1521
    16 === 2)  Adding OMF/OML Capabilites
     22=== 2)  Adding OMF/OML Capabilites ===
    1723
    1824=== 2)  WiMAX Range and Throughput Measurements, and Site Planning ===