[[PageOutline]] == Project Number == 1783 == Project Title == GENI Experiments for Traffic Capture Capabilities and Security Requirement Analysis [[BR]] a.k.a. !ExptsSecurity === Technical Contacts === Principal Investigator Xiaoyan Hong hxy@cs.ua.edu [[BR]] Co-PI: Fei Hu fei@eng.ua.edu [[BR]] Co-PI: Yang Xiao yangxiao@ieee.org === Participating Organizations === Department of Computer Science [[BR]] The University of Alabama, Box 870290 [[BR]] Tuscaloosa, AL 35487[[BR]] [[BR]] Department of Electrical and Computer Engineering [[BR]] The University of Alabama, Box 870286 [[BR]] Tuscaloosa, AL 35487 === GPO Liaison System Engineer === Vic Thomas vthomas@geni.net == Scope == This effort will help define GENI security requirements based on investigations through ProtoGENI experiments using at least two aggregates, one of which will be a wireless aggregate. The investigations will use network traffic capture and analysis under both normal and misbehaving situations. The well-articulated experiments will analyze the security and privacy characteristics, test GENI traffic recording and capture tools (following the results from Spiral I and II), and make suggestions for improvements to the ProtoGENI control framework with special emphasis on security improvements. === Current Capabilities === BRIEF descriptions of resources/functions/tools that are available to anyone in the GENI community === Milestones === [[MilestoneDate(ExptsSec: S2.a -)]] Experiment design document [[BR]] [[MilestoneDate(ExptsSec: S2.b)]] Report on initial experimentation on ProtoGENI and revised experiment design. [[BR]] [[MilestoneDate(ExptsSec: S2.c)]] Report on experiments that validate vulnerability hypotheses/exploit vulnerabilities. [[BR]] [[MilestoneDate(ExptsSec: S2.d)]] Experiment design document 2. [[BR]] == Project Technical Documents == [attachment:ExptsSec-designdoc-1.pdf Description of planned security experiments] [[BR]] [attachment:ExptsSec-designdoc-revised.pdf Revised description of planned security experiments] [[BR]] === Quarterly Status Reports === [attachment:QSR-Dec09.pdf December 2009 report] === Spiral 2 Connectivity === To be reviewed: Layer 3 connectivity to ProtoGENI clearinghouse. Layer 3 connectivity to provision resources used by experiments. Layer 2/3 connectivity between resources used in experiment. === Related Projects === Includes non-GENI projects.