Changes between Version 43 and Version 44 of Embedded Real-Time Measurements


Ignore:
Timestamp:
10/27/09 12:42:38 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Embedded Real-Time Measurements

    v43 v44  
    1313
    1414
    15 == Technical Contacts ==
     15=== Technical Contacts ===
    1616
    17 Principal Investigator: Keren Bergman bergman@ee.columbia.edu [[BR]]
     17Principal Investigator: Keren Bergman bergman@ee.columbia.edu http://www.ee.columbia.edu/fac-bios/bergman/faculty.html[[BR]]
    1818Student Developer: Caroline Lai caroline@ee.columbia.edu [[BR]]
    1919Student Developer: Michael Wang msw2138@columbia.edu [[BR]]
     
    2626*Main researchers on project
    2727
    28 == Participating Organizations ==
     28=== Participating Organizations ===
    2929
    3030Columbia University - New York City[[BR]]
    31 Bell Labs Alcatel-Lucent
     31Bell Labs Alcatel-Lucent [[BR]]
     32
     33
     34=== GPO Liaison System Engineer ===
     35
     36Vic Thomas
     37
    3238
    3339== Scope ==
     
    4147information and user access to real-time measurements.
    4248
    43 == Current Capabilities ==
    4449
    45 Currently: at the end of year 1, during which we assessed and proposed the required measurement framework. [[BR]]
    46 For year 2: we plan to develop the hardware and software prototype using a NetFPGA and integrate the subsystem within Cluster D.
     50=== Current Capabilities ===
    4751
    48 == Milestones ==
     52By the end of year 1, we assessed and proposed the required measurement framework. [[BR]]
     53
     54For year 2: we plan to develop the hardware and software prototype using a NetFPGA and integrate the subsystem within Cluster D.  [[BR]]
     55
     56=== Milestones ===
    4957
    5058
     
    5664[[MilestoneDate(ERM: identify a candidate control framework)]] [[BR]]
    5765
     66
     67
     68[[MilestoneDate(KANSEI: S2.a Remote access)]]  [[BR]]
     69[[MilestoneDate(KANSEI: S2.b Cluster plan for VLANs between testbeds)]]   [[BR]]
     70[[MilestoneDate(KANSEI: S2.c Extend researcher portal to support workflow management)]]  [[BR]]
     71[[MilestoneDate(KANSEI: S2.d Extend researcher portal for use with Kansei and Neteye)]] [[BR]]
     72[[MilestoneDate(KANSEI: S2.e Bring up NetEye testbed at WSU)]]   [[BR]]
     73[[MilestoneDate(KANSEI: S2.f Connections from Kansei and NetEye to Internet2)]]   [[BR]]
     74[[MilestoneDate(KANSEI: S2.g Import extended ORCA v2.1)]]   [[BR]]
     75[[MilestoneDate(KANSEI: S2.h Demo experiment using Kansei and NetEye)]]   [[BR]]
     76[[MilestoneDate(KANSEI: S2.i Collaborate with GMOC)]]   [[BR]]
     77[[MilestoneDate(KANSEI: S2.j POC to GENI response team)]]   [[BR]]
     78[[MilestoneDate(KANSEI: S2.k POC to GENI security team)]]   [[BR]]
     79[[MilestoneDate(KANSEI: S2.l Contribution to GENI outreach)]]    [[BR]]
     80
     81
     82
     83
     84== Project Technical Documents ==
     85
    5886=== Milestone 1 ===
    59 
    6087The capabilities of GENI's (future) infrastructure with respect to real-time measurements are evaluated and we assess the GENI requirements for real-time user access to measurement data across a diverse set of technologies.
    6188
     
    104131''[http://groups.geni.net/geni/attachment/wiki/Embedded%20Real-Time%20Measurements/GENI_MS6_ERM_Sept09_v1-0.pdf Technical Note MS6]''
    105132
    106 == Project Technical Documents ==
     133=== Quarterly Status Reports ===
    107134
    108135''[http://groups.geni.net/geni/attachment/wiki/Embedded%20Real-Time%20Measurements/GENI_QR_ERM_Dec08.pdf Quarterly Status Report 4Q08]'' [[BR]]
     
    121148
    122149There is no connectivity requirment for year-1 in this project
    123 
    124 == GPO Liaison System Engineer ==
    125 
    126 Vic Thomas