Version 8 (modified by 16 years ago) (diff) | ,
---|
Project Number
1663
Project Title
GENI Registry Services
a.k.a Digital Object Registry, DIGOBREG
Technical Contacts
PI Larry Lannom (mailto:llannom@cnri.reston.va.us / 703 620 8990)
Giridhar Manepalli (mailto:gmanepalli@cnri.reston.va.us / 703 620 8990)
Christophe Blanchi (mailto:cblanchi@cnri.reston.va.us / 703 620 8990)
Participating Organizations
Corporation for National Research Initiatives (CNRI)
1895 Preston White Drive, Suite 100
Reston, VA 20191 - 5434
Scope
The scope of work on this project is to adapt the Handle System and/or a Digital Object Registry to realize a clearinghouse registry for principals, slices, and/or components in a selected GENI Spiral 1 control framework (possibly using XML RPC), and capable of supporting limited operations in Year 1. Also, to analyze how the Handle System and/or a Digital Object Registry could be used to identify and register GENI software, including experimenter’s tools, test images and configurations, and test results. And finally, to define the operational, scaling, security, and management requirements, plus recommended design approaches, for implementing GENI clearinghouse and software registry services.
Milestones
milestone:"DigitalObjectRegistry: Plan to meet registry needs of at least one control framework."
milestone:"DigitalObjectRegistry: Security requirements for implementing Clearinghouse and Registry Services."
milestone:"DigitalObjectRegistry: Plan to use Digital Object Architecture for experimenter tools and services."
milestone:"DigitalObjectRegistry: Adapt digital object architecture to meet clearinghouse registry needs."
Quarterly Reports
Project Technical Documents
http://www.handle.net/faq.html
http://doregistry.org
Project Presentations
Digital Object Architecture and GENI
GENI Registry Services
Digital Object Architecture "Lightening Talk"
Spiral 1 Connectivity
Not yet associated with a control framework. Expect to use IP addresses for registry, but addressing plan depends on control framework integration plan.
No special GENI layer 2 connectivity needs for virtual Ethernet connections.
GPO Liason System Engineer
Related Projects
Attachments (28)
-
QSR-Q408.pdf (75.7 KB) - added by 16 years ago.
Quarterly Status Report --- Dec 2008
-
QSR-Q109.pdf (45.1 KB) - added by 16 years ago.
Quarterly Status Report --- April 2009
-
ClearinghouseSecurityReqmnts.pdf (91.5 KB) - added by 15 years ago.
Clearinghouse Security Requirements
-
FederatedClearinghouse.pdf (235.7 KB) - added by 15 years ago.
Plan for using the Digital Object Repository architecture to implement ProtoGENI registries and clearinghouse.
-
ControlFramework.pdf (250.9 KB) - added by 15 years ago.
Experiment Control Tool
-
QSR-Q209.pdf (52.7 KB) - added by 15 years ago.
Quarterly Status Report --- June 2009
-
DOA-for-ExperimenterTools.pdf (200.0 KB) - added by 15 years ago.
Milestone deliverable: Use of DOA by Experimenter Tools & Svcs
-
QSR-Q309+finalReport.pdf (60.8 KB) - added by 15 years ago.
Quarterly and Final Report --- Sept 2009
-
GENI-ExptMngmntSvc.pdf (146.4 KB) - added by 15 years ago.
DOR based GENI Experiment Management Service
-
QSR-Q409.pdf (185.1 KB) - added by 15 years ago.
December 2009 Quarterly Status Report.
-
CNRI-QSR-Q1-2010.pdf (87.2 KB) - added by 15 years ago.
Quarterly Status Report --- Mar 2010
- GENI Federated Clearing House Performance report.pdf (55.0 KB) - added by 14 years ago.
- Spiral 2 Project Review DOR-Final.pptx (212.2 KB) - added by 14 years ago.
-
Handle-based-GENI-Security-Design.pdf (27.4 KB) - added by 14 years ago.
Handle system for identity management in GENI.
-
GFC Technical Reference.pdf (1.5 MB) - added by 14 years ago.
The GENI Federated Clearinghouse Technical Reference
- GENI-CNRI-Q410.doc (46.0 KB) - added by 14 years ago.
-
GENI-CNRI-SR-033111.pdf (83.0 KB) - added by 14 years ago.
Status Report for the Period Jan 1, 2011 through Mar 31, 2011
-
Measurement Data Archive Prototype.pdf (233.5 KB) - added by 13 years ago.
MDA Design, Implementation and API.
- GENI-CNRI-0811.doc (44.0 KB) - added by 13 years ago.
- Measurement Data Archive Prototype-3.docx (306.6 KB) - added by 13 years ago.
-
GENI-CNRI-Year4Report1.pdf (84.9 KB) - added by 13 years ago.
Solicitation 1 Year 4 First Status Report
-
GENI-CNRI-Year4FinalReport-2012.pdf (74.5 KB) - added by 12 years ago.
Project Status and Final Report for Year 4
-
GENI-CNRI-Year5Report1-2012.pdf (83.0 KB) - added by 12 years ago.
Project Status Report - GEC 15 - Year 5
-
GENISchemaAndExamples.zip (11.5 KB) - added by 12 years ago.
GENI Metadata Schema and Examples. Controlled Vocabulary to be added.
-
GENI-CNRI-Year5Report2-2013.pdf (83.8 KB) - added by 12 years ago.
GENI-CNRI-1663-Year5-Report2-GEC16
-
GENIObject-v2.0.xsd (13.9 KB) - added by 11 years ago.
GSAS Metadata Schema 2.0
-
GENI-RRS-Policy.docx (61.5 KB) - added by 11 years ago.
GENI Research Results Sharing Policy Draft
-
GENI-CNRI-Year5-FinalReport-2013.pdf (83.5 KB) - added by 11 years ago.
GENI Year 5 Final Report