Changes between Version 7 and Version 8 of DeliverablePage
- Timestamp:
- 01/05/09 13:45:48 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
DeliverablePage
v7 v8 27 27 The deliverables discussed at GEC3 include:[[BR]] 28 28 1. Substrate WG Documents and Dates specific to solicitation 1 29 a. Spiral 1 Substrate Catalog (final version 5/1/09)30 b. Substrate Capabilities based use-case(s) derived from Spiral 1 Substrate Catalog (final version 6/1/09)[[BR]]29 a. Spiral 1 Substrate Catalog (final version due 5/1/09) 30 b. Substrate Capabilities based use-case(s) derived from Spiral 1 Substrate Catalog (final version due 6/1/09)[[BR]] 31 31 32 32 2. Substrate WG Documents and Dates (GENI Design) 33 a. Aggregate Subsystem Technical Description (final version 7/1/09)34 b. Aggregate ICD derived from Aggregate Subsystem Technical Description and Substrate Catalog (final version 8/1/09)33 a. Aggregate Subsystem Technical Description (final version due 7/1/09) 34 b. Aggregate ICD derived from Aggregate Subsystem Technical Description and Substrate Catalog (final version due 8/1/09) 35 35 36 === Developing Drafts === 36 37 37 38 Link to draft of Spiral 1 Substrate Catalog