Changes between Version 6 and Version 7 of DeliverablePage


Ignore:
Timestamp:
01/05/09 13:35:51 (16 years ago)
Author:
jjacob@geni.net
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • DeliverablePage

    v6 v7  
    2424        d. Technology Readiness Levels, and best effort cost estimates.         
    2525
     26
     27The deliverables discussed at GEC3 include:[[BR]]
     28 1. Substrate WG Documents and Dates specific to solicitation 1
     29        a. Spiral 1 Substrate Catalog (final version 5/1/09)
     30        b. Substrate Capabilities based use-case(s) derived from Spiral 1 Substrate Catalog (final version 6/1/09)[[BR]]
     31
     32 2. Substrate WG Documents and Dates (GENI Design)
     33        a. Aggregate Subsystem Technical Description (final version 7/1/09)
     34        b. Aggregate ICD derived from Aggregate Subsystem Technical Description and Substrate Catalog (final version 8/1/09)
     35
     36
     37