| 26 | |
| 27 | The deliverables discussed at GEC3 include:[[BR]] |
| 28 | 1. Substrate WG Documents and Dates specific to solicitation 1 |
| 29 | a. Spiral 1 Substrate Catalog (final version 5/1/09) |
| 30 | b. Substrate Capabilities based use-case(s) derived from Spiral 1 Substrate Catalog (final version 6/1/09)[[BR]] |
| 31 | |
| 32 | 2. Substrate WG Documents and Dates (GENI Design) |
| 33 | a. Aggregate Subsystem Technical Description (final version 7/1/09) |
| 34 | b. Aggregate ICD derived from Aggregate Subsystem Technical Description and Substrate Catalog (final version 8/1/09) |
| 35 | |
| 36 | |
| 37 | |