Changes between Version 2 and Version 3 of DeliverablePage


Ignore:
Timestamp:
12/04/07 16:27:49 (16 years ago)
Author:
krausche@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • DeliverablePage

    v2 v3  
    22
    33Substrate Working Group deliverables will appear here as they are developed.
     4
     5== Deliverables ==
     6
     7The deliverables called out by the working group charter include:
     8
     9 1. One brief (20pp) overview document:
     10        a.  List of component types
     11        b.  List of common attributes to be "managed":  hardware, resources, etc.
     12        c.  List of risks:  high-risk items called out here--details relegated to specific substrate areas
     13        d.  Research drivers for component/capability (table derived from science plan)
     14        e.  Substrate enabling capabilities table (super set of (4) for TBD research)
     15        f.  Working group dependencies
     16        g.  Description of what can/should be implemented by Oct 2008
     17
     18 2. One brief (20pp) document for each substrate/and/or/component type (e.g. Network; DWDM Terminal; Optical Switch; Digital Switch; Storage Cluster; Processor Cluster; Wireless Sensor Node; A Sensor Network Site (aggregate); Wireless net)
     19        a. high level functional architecture
     20        b.  initial capabilities definitions
     21        c.  projected development schedules with dependencies and identified risks
     22        d. Technology Readiness Levels, and best effort cost estimates.         
     23