Changes between Version 2 and Version 3 of Dec2012WiMAXstatus


Ignore:
Timestamp:
12/10/12 15:57:59 (11 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Dec2012WiMAXstatus

    v2 v3  
    66
    77
    8 == Description ==
     8== Agenda ==
    99
    1010First, these calls will review Spiral 5 goals for GENI WiMAX campus deployments and experiments.  [[BR]]
     
    1414Finally, review several WiMAX deployment tasks and issues.  [[BR]]
    1515
    16 
    17 
    18 == Agenda ==
    19 This is a tentative agenda, which may change. [[BR]]
    2016
    2117
     
    305301
    306302
    307 === 3.1)  BBN Site Extension Plan ===
    308 3:15pm  [[BR]]
     303=== 4.1)  WINLAB/Rutgers University Site Extension Plan ===
     304
     305Ivan Seskar (WINLAB) [[BR]]
     306
     307GEC14 status: [[BR]]
     308 * Status  [[BR]]
     309  * Bringing Airspan on Busch campus  [[BR]]
     310  * Continuing remote access to BSs [[BR]]
     311  * Connected to I2 backbone network [[BR]]
     312
     313 * Local and remote experiments [[BR]]
     314
     315GEC15 status:  [[BR]]
     316 * WINLAB site:  [[BR]]
     317  1)  NEC base station, with fixed mobile station [[BR]]
     318  2)  Sandbox:  NEC base station, connected via programmable RF attenuator to fixed mobile station [[BR]]
     319
     320 * Busch campus site:  [[BR]]
     321  3)  Airspan base station, for use by students on campus [[BR]]
     322
     323a)  Status of deployments planned for Spiral 4:  [[BR]]
     324 Install Airspan base station(s), with local NetSpan management system  (yes) [[BR]]
     325 Optional when multiple cells:  backhaul control and data traffic to central equipment site (yes) [[BR]]
     326 Add OMF/OML structures, including LoginService  (yes) [[BR]]
     327 Connect via switch to I2 backbone, via OF switches if there  (yes) [[BR]]
     328 WiFi access point for dual-homing operating on custom PC node   (yes)  [[BR]]
     329 Vehicular mobile station operating on custom PC node  (yes)  [[BR]]
     330 Fixed “mobile station” for remote experimenters operating on custom PC node  (yes)  [[BR]]
     331
     332b)  Plan for local research experiments in Spiral 5:   [[BR]]
     333 What is new?  [[BR]]
     334
     335c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
     336 Additional base station  (Rutgers WINLAB)  [[BR]]
     337 GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
     338 Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     339 Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     340 Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
     341 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
     342
     343d)  Support for unified GENI operations:  [[BR]]
     344 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
     345 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
     346 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
     347
     348e)  Support for experiments:  [[BR]]
     349 Local research experiments [[BR]]
     350 Experiments by remote experimenters, including those at tutorials  [[BR]]
     351 Classroom instruction experiments by students   (NYU Poly)  [[BR]]
     352 Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
     353
     354
     355=== 4.2)  BBN Site Extension Plan ===
     356
    309357Manu Gosain (GPO)  [[BR]]
    310358
     
    345393
    346394
    347 
    348 === 3.2)  WINLAB/Rutgers University Site Extension Plan ===
    349 3:20pm  [[BR]]
    350 Ivan Seskar (WINLAB) [[BR]]
    351 
    352 GEC14 status: [[BR]]
    353  * Status  [[BR]]
    354   * Bringing Airspan on Busch campus  [[BR]]
    355   * Continuing remote access to BSs [[BR]]
    356   * Connected to I2 backbone network [[BR]]
    357 
    358  * Local and remote experiments [[BR]]
     395=== 4.4) NYU Poly Site Update ===
     396
     397Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]]
     398
     399GEC14 status:  [[BR]]
     400 * [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC14-WiMAX-NYUPoly.pdf  slides] [[BR]]
     401
     402 * Operational OMF/OML installation[[BR]]
     403 * Connected to I2 backbone network[[BR]]
     404 * Testbed open to experimenters since GEC12[[BR]]
    359405
    360406GEC15 status:  [[BR]]
    361  * WINLAB site:  [[BR]]
    362   1)  NEC base station, with fixed mobile station [[BR]]
    363   2)  Sandbox:  NEC base station, connected via programmable RF attenuator to fixed mobile station [[BR]]
    364 
    365  * Busch campus site:  [[BR]]
    366   3)  Airspan base station, for use by students on campus [[BR]]
     407
     408 * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]]
     409
     410 * Airspan base station isntallation still pending.
     411 * Working closely with UMass Amherst on use of GIMI tools with WiMAX
     412 * Supporting experimenters, including students and tutorials
    367413
    368414a)  Status of deployments planned for Spiral 4:  [[BR]]
    369  Install Airspan base station(s), with local NetSpan management system  (yes) [[BR]]
    370  Optional when multiple cells:  backhaul control and data traffic to central equipment site (yes) [[BR]]
    371  Add OMF/OML structures, including LoginService  (yes) [[BR]]
     415 Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes)  [[BR]]
     416 Install Airspan base station(s), with local NetSpan management system  (pending) [[BR]]
     417 Optional when multiple cells:  backhaul control and data traffic to central equipment site  (?) [[BR]]
     418 Add OMF/OML structures, including LoginService  (yes)  [[BR]]
    372419 Connect via switch to I2 backbone, via OF switches if there  (yes) [[BR]]
    373  WiFi access point for dual-homing operating on custom PC node   (yes) [[BR]]
    374  Vehicular mobile station operating on custom PC node  (yes)  [[BR]]
    375  Fixed “mobile station” for remote experimenters operating on custom PC node  (yes)  [[BR]]
     420 WiFi access point for dual-homing operating on custom PC node  (yes) [[BR]]
     421 Vehicular mobile station operating on custom PC node  (?)  [[BR]]
     422 Fixed “mobile station” for remote experimenters operating on custom PC node (yes)  [[BR]]
    376423
    377424b)  Plan for local research experiments in Spiral 5:   [[BR]]
    378  What is new?  [[BR]]
     425 Many experiments formulated for students, and tutorials, including: [[BR]]
     426  StreamLoad [[BR]]
     427  NetCheck [[BR]]
     428  AFFIX [[BR]]
     429 Working on set of lab experiments to teach wireless principals  [[BR]]
    379430
    380431c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    381  Additional base station  (Rutgers WINLAB)  [[BR]]
    382432 GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
    383433 Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    384434 Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    385435 Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
     436 Vehicular mobile station operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    386437 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    387438
     
    397448 Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
    398449
    399 
    400 
    401 === 3.3)  UCLA Site Extension Plans ===
    402 3:25pm  [[BR]]
     450What are next steps?   [[BR]]
     451 * Complete installation of Airspan base station, use early release of WiMAX RF AggMgr with local OMF/OML to configure, check over-the-air throughput  (due 12/15/12) [[BR]]
     452
     453
     454
     455=== 4.5) UMass Amherst Site Update ===
     456
     457Mike Zink, Cong Wang (UMass Amherst)  [[BR]]
     458
     459GEC14 status:
     460 * Add OMF/OML:  have installed  [[BR]]
     461 * Connect to I2 backbone network:  plan to do soon  [[BR]]
     462
     463 * Planned experiments:  use to integrate GIMI tools [[BR]]
     464
     465GEC15 status:  BR]]
     466 No report  [[BR]]
     467
     468
     469=== 4.6) Columbia University Site Update ===
     470Henning Schulzrinne, Jan Janak (Columbia)  [[BR]]
     471
     472
     473GEC15 status:  BR]]
     474 * No report  [[BR]]
     475
     476
     477=== 4.7) Univ of Colorado at Boulder Site Update ===
     478Dirk Grunwald (Colorado)  [[BR]]
     479
     480
     481GEC15 status:  BR]]
     482 * No report  [[BR]]
     483
     484
     485
     486
     487=== 4.8)  University of Wisconsin Site Extension Plan ===
     488
     489Suman Banerjee, Derek Meyer (Wisconsin)  [[BR]]
     490
     491GEC14 status:  [[BR]]
     492 * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/2012_07_09_Geni_Conference.ppt  slides]  [[BR]]
     493
     494 * Extension plan  [[BR]]
     495  * Add Airspan to building/tower near Capitol.  [[BR]]
     496  * Connect via Madison unified fiber project  [[BR]]
     497  * Outside contributions for power and poles.  [[BR]]
     498  * x1 (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
     499
     500
     501GEC15 status:  [[BR]]
     502 * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/mse-banerjee.pdf  slides]  [[BR]]
     503
     504
     505 * Airspan status [[BR]]
     506  * Planned installation blocked by site issues [[BR]]
     507  * Instead, will move quickly to install on CS building (where Cisco base station was installed) [[BR]]
     508
     509a)  Status of deployments planned for Spiral 4:  [[BR]]
     510 Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes)  [[BR]]
     511 Install Airspan base station(s), with local NetSpan management system  (no;  restarting) [[BR]]
     512 Optional when multiple cells:  backhaul control and data traffic to central equipment site  (?) [[BR]]
     513 Add OMF/OML structures, including LoginService  (partial) [[BR]]
     514 Connect via switch to I2 backbone, via OF switches if there (?) [[BR]]
     515 WiFi access point for dual-homing operating on custom PC node  (no)  [[BR]]
     516 Vehicular mobile station operating on custom PC node  (no)  [[BR]]
     517 Fixed “mobile station” for remote experimenters operating on custom PC node  (no) [[BR]]
     518
     519b)  Plan for local research experiments in Spiral 5:   [[BR]]
     520 Focus on mobility experiments from bus  [[BR]]
     521 Planning multi-site video experiment with NYU Poly  [[BR]]
     522 Begin classroom use in Spring 2013  [[BR]]
     523
     524c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
     525 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     526 Login Service plus OMF/OML services operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     527 Connection to I2  (coordinated by BBN) [[BR]]
     528 GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
     529 Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     530 Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     531 Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
     532 WiFi access point for dual-homing operating on custom PC node  (Rutgers WINLAB) (or use local service?) [[BR]]
     533 Vehicular mobile station operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     534 Fixed “mobile station” for remote experimenters operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     535 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
     536
     537d)  Support for unified GENI operations:  [[BR]]
     538 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
     539 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
     540 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
     541
     542e)  Support for experiments:  [[BR]]
     543 Local research experiments [[BR]]
     544 Experiments by remote experimenters, including those at tutorials  [[BR]]
     545 Classroom instruction experiments by students   (NYU Poly)  [[BR]]
     546 Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
     547
     548What are next steps?   [[BR]]
     549 * Establish a plan for all of your Spiral 5 tasks, and document  (due 12/1/12)  [[BR]]
     550 * Complete installation of Airspan base station, use early release of WiMAX RF AggMgr with local OMF/OML to configure, check over-the-air throughput  (due 12/15/12) [[BR]]
     551 * Complete connection to I2 backbone, and demonstrate a service with another site(s)  (due 1/15/12)  [[BR]]
     552
     553
     554=== 4.9)  UCLA Site Extension Plans ===
     555
    403556Giovanni Pau, Mario Gerla (UCLA) [[BR]]
    404557
     
    470623
    471624
    472 === 3.4)  Clemson University Site Deployment Plan ===
    473 3:30pm  [[BR]]
     625=== 4.10)  Clemson University Site Deployment Plan ===
     626
    474627K-C Wang, Reece Johnson (Clemson)
    475628
     
    540693 * Complete connection to I2 backbone, and demonstrate a service with another site(s)  (due 1/15/12)  [[BR]]
    541694 
    542 === 3.5)  University of Wisconsin Site Extension Plan ===
    543 3:35pm  [[BR]]
    544 Suman Banerjee, Derek Meyer (Wisconsin)  [[BR]]
    545 
    546 GEC14 status:  [[BR]]
    547  * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/2012_07_09_Geni_Conference.ppt  slides]  [[BR]]
    548 
    549  * Extension plan  [[BR]]
    550   * Add Airspan to building/tower near Capitol.  [[BR]]
    551   * Connect via Madison unified fiber project  [[BR]]
    552   * Outside contributions for power and poles.  [[BR]]
    553   * x1 (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    554 
    555 
    556 GEC15 status:  [[BR]]
    557  * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/mse-banerjee.pdf  slides]  [[BR]]
    558 
    559 
    560  * Airspan status [[BR]]
    561   * Planned installation blocked by site issues [[BR]]
    562   * Instead, will move quickly to install on CS building (where Cisco base station was installed) [[BR]]
    563 
    564 a)  Status of deployments planned for Spiral 4:  [[BR]]
    565  Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes)  [[BR]]
    566  Install Airspan base station(s), with local NetSpan management system  (no;  restarting) [[BR]]
    567  Optional when multiple cells:  backhaul control and data traffic to central equipment site  (?) [[BR]]
    568  Add OMF/OML structures, including LoginService  (partial) [[BR]]
    569  Connect via switch to I2 backbone, via OF switches if there (?) [[BR]]
    570  WiFi access point for dual-homing operating on custom PC node  (no)  [[BR]]
    571  Vehicular mobile station operating on custom PC node  (no)  [[BR]]
    572  Fixed “mobile station” for remote experimenters operating on custom PC node  (no) [[BR]]
    573 
    574 b)  Plan for local research experiments in Spiral 5:   [[BR]]
    575  Focus on mobility experiments from bus  [[BR]]
    576  Planning multi-site video experiment with NYU Poly  [[BR]]
    577  Begin classroom use in Spring 2013  [[BR]]
    578 
    579 c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    580  Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
    581  Login Service plus OMF/OML services operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    582  Connection to I2  (coordinated by BBN) [[BR]]
    583  GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
    584  Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    585  Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    586  Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
    587  WiFi access point for dual-homing operating on custom PC node  (Rutgers WINLAB) (or use local service?) [[BR]]
    588  Vehicular mobile station operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    589  Fixed “mobile station” for remote experimenters operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    590  Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    591 
    592 d)  Support for unified GENI operations:  [[BR]]
    593  Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    594  Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    595  When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    596 
    597 e)  Support for experiments:  [[BR]]
    598  Local research experiments [[BR]]
    599  Experiments by remote experimenters, including those at tutorials  [[BR]]
    600  Classroom instruction experiments by students   (NYU Poly)  [[BR]]
    601  Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
    602 
    603 What are next steps?   [[BR]]
    604  * Establish a plan for all of your Spiral 5 tasks, and document  (due 12/1/12)  [[BR]]
    605  * Complete installation of Airspan base station, use early release of WiMAX RF AggMgr with local OMF/OML to configure, check over-the-air throughput  (due 12/15/12) [[BR]]
    606  * Complete connection to I2 backbone, and demonstrate a service with another site(s)  (due 1/15/12)  [[BR]]
    607 
    608 === 3.6)  University of Michigan Site Deployment Plan ===
    609 3:40pm [[BR]]
    610 Morley Mao  (Michigan)  [[BR]]
    611 
    612 GEC13 plans:
    613  * [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/WIMAXexperimentMichigan.pdf  slides]  [[BR]]
    614 
    615 GEC14 status:  [[BR]]
    616  * Extension plan  [[BR]]
    617   * Add one Airspan on top of building  [[BR]]
    618   * Will signals penetrate into buildings?  [[BR]]
    619   * One frequency from Clearwire  [[BR]]
    620   * x1 (2510 Lo:  2496 to 2570 MHz)  [[BR]]
    621   * Location and backhaul [[BR]]
    622   * Mobility and handover [[BR]]
    623 
    624 GEC15 status:[[BR]]
    625  * Base station installed, local Netspan ready, but waiting for power  [[BR]]
    626  * I2 connection pending  [[BR]]
    627 
    628 a)  Status of deployments planned for Spiral 4:  [[BR]]
    629  Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes) [[BR]]
    630  Install Airspan base station(s), with local NetSpan management system  (pending) [[BR]]
    631  Add OMF/OML structures, including LoginService  (no) [[BR]]
    632  Connect via switch to I2 backbone, via OF switches if there   (pending) [[BR]]
    633  WiFi access point for dual-homing operating on custom PC node (no) [[BR]]
    634  Fixed “mobile station” for remote experimenters operating on custom PC node (no)  [[BR]]
    635 
    636 b)  Plan for local research experiments in Spiral 5:   [[BR]]
    637  Content delivery service [[BR]]
    638 
    639 c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    640  Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
    641  Login Service plus OMF/OML services operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    642  Connection to I2  (coordinated by BBN) [[BR]]
    643  GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
    644  Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    645  Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    646  Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
    647  WiFi access point for dual-homing operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    648  Fixed “mobile station” for remote experimenters operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    649  Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    650 
    651 d)  Support for unified GENI operations:  [[BR]]
    652  Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    653  Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    654  When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    655 
    656 e)  Support for experiments:  [[BR]]
    657  Local research experiments [[BR]]
    658  Experiments by remote experimenters, including those at tutorials  [[BR]]
    659  Classroom instruction experiments by students   (NYU Poly)  [[BR]]
    660  Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
    661 
    662 What are next steps?   [[BR]]
    663  * Establish a plan for all of your Spiral 5 tasks, and document  (due 12/1/12)  [[BR]]
    664  * Complete installation of Airspan base station, use early release of WiMAX RF AggMgr with local OMF/OML to configure, check over-the-air throughput  (due 12/15/12) [[BR]]
    665  * Complete connection to I2 backbone, and demonstrate a service with another site(s)  (due 1/15/12)  [[BR]]
    666 
    667 
    668 === 3.7)  Wayne State University Site Deployment Plan ===
    669 3:45m   [[BR]]
     695
     696=== 4.11)  Wayne State University Site Deployment Plan ===
     697
    670698Hongwei Zhang, Yu Chu (Wayne State)  [[BR]]
    671699
     
    738766
    739767
    740 === 3.8) NYU Poly Site Update ===
    741 3:50pm   [[BR]]
    742 Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]]
     768=== 4.12)  University of Michigan Site Deployment Plan ===
     769
     770Morley Mao  (Michigan)  [[BR]]
     771
     772GEC13 plans:
     773 * [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/WIMAXexperimentMichigan.pdf  slides]  [[BR]]
    743774
    744775GEC14 status:  [[BR]]
    745  * [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC14-WiMAX-NYUPoly.pdf  slides] [[BR]]
    746 
    747  * Operational OMF/OML installation[[BR]]
    748  * Connected to I2 backbone network[[BR]]
    749  * Testbed open to experimenters since GEC12[[BR]]
    750 
    751 GEC15 status:  [[BR]]
    752 
    753  * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]]
    754 
    755  * Airspan base station isntallation still pending.
    756  * Working closely with UMass Amherst on use of GIMI tools with WiMAX
    757  * Supporting experimenters, including students and tutorials
     776 * Extension plan  [[BR]]
     777  * Add one Airspan on top of building  [[BR]]
     778  * Will signals penetrate into buildings?  [[BR]]
     779  * One frequency from Clearwire  [[BR]]
     780  * x1 (2510 Lo:  2496 to 2570 MHz)  [[BR]]
     781  * Location and backhaul [[BR]]
     782  * Mobility and handover [[BR]]
     783
     784GEC15 status:[[BR]]
     785 * Base station installed, local Netspan ready, but waiting for power  [[BR]]
     786 * I2 connection pending  [[BR]]
    758787
    759788a)  Status of deployments planned for Spiral 4:  [[BR]]
    760  Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes)  [[BR]]
     789 Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes) [[BR]]
    761790 Install Airspan base station(s), with local NetSpan management system  (pending) [[BR]]
    762  Optional when multiple cells:  backhaul control and data traffic to central equipment site  (?) [[BR]]
    763  Add OMF/OML structures, including LoginService  (yes)  [[BR]]
    764  Connect via switch to I2 backbone, via OF switches if there  (yes) [[BR]]
    765  WiFi access point for dual-homing operating on custom PC node  (yes) [[BR]]
    766  Vehicular mobile station operating on custom PC node  (?)  [[BR]]
    767  Fixed “mobile station” for remote experimenters operating on custom PC node (yes)  [[BR]]
     791 Add OMF/OML structures, including LoginService  (no) [[BR]]
     792 Connect via switch to I2 backbone, via OF switches if there   (pending) [[BR]]
     793 WiFi access point for dual-homing operating on custom PC node (no) [[BR]]
     794 Fixed “mobile station” for remote experimenters operating on custom PC node (no)  [[BR]]
    768795
    769796b)  Plan for local research experiments in Spiral 5:   [[BR]]
    770  Many experiments formulated for students, and tutorials, including: [[BR]]
    771   StreamLoad [[BR]]
    772   NetCheck [[BR]]
    773   AFFIX [[BR]]
    774  Working on set of lab experiments to teach wireless principals  [[BR]]
     797 Content delivery service [[BR]]
    775798
    776799c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
     800 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     801 Login Service plus OMF/OML services operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     802 Connection to I2  (coordinated by BBN) [[BR]]
    777803 GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
    778804 Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    779805 Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    780806 Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
    781  Vehicular mobile station operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     807 WiFi access point for dual-homing operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     808 Fixed “mobile station” for remote experimenters operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    782809 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    783810
     
    794821
    795822What are next steps?   [[BR]]
     823 * Establish a plan for all of your Spiral 5 tasks, and document  (due 12/1/12)  [[BR]]
    796824 * Complete installation of Airspan base station, use early release of WiMAX RF AggMgr with local OMF/OML to configure, check over-the-air throughput  (due 12/15/12) [[BR]]
    797 
    798 
    799 === 3.9) UMass Amherst Site Update ===
    800 3:55pm   [[BR]]
    801 Mike Zink, Cong Wang (UMass Amherst)  [[BR]]
    802 
    803 GEC14 status:
    804  * Add OMF/OML:  have installed  [[BR]]
    805  * Connect to I2 backbone network:  plan to do soon  [[BR]]
    806 
    807  * Planned experiments:  use to integrate GIMI tools [[BR]]
    808 
    809 GEC15 status:  BR]]
    810  No report  [[BR]]
    811 
    812 === 3.xx)  Temple University Site Deployment Plan ===
     825 * Complete connection to I2 backbone, and demonstrate a service with another site(s)  (due 1/15/12)  [[BR]]
     826
     827
     828
     829
     830
     831
     832
     833
     834=== 4.13)  Temple University Site Deployment Plan ===
    813835Shan Lin, Jie Wu (Temple)  [[BR]]
    814836
     
    842864 * No report  [[BR]]
    843865 
    844 === 3.xx)  Drexel University Site Deployment Plan ===
     866=== 4.14)  Drexel University Site Deployment Plan ===
    845867Kevin Wanuga, Jeff Wildman, Kapil Dandekar (Drexel)  [[BR]]
    846868
     
    867889 * No report  [[BR]]
    868890
    869 
    870 
    871 === 3.xx) Univ of Colorado at Boulder Site Update ===
    872 Dirk Grunwald (Colorado)  [[BR]]
    873 
    874 
    875 GEC15 status:  BR]]
    876  * No report  [[BR]]
    877 
    878 === 3.xx) Columbia University Site Update ===
    879 Henning Schulzrinne, Jan Janak (Columbia)  [[BR]]
    880 
    881 
    882 GEC15 status:  BR]]
    883  * No report  [[BR]]
    884891
    885892