Version 19 (modified by 15 years ago) (diff) | ,
---|
Project Number
1599
Project Title
Slivers and Slices in a Diverse, Outdoor, Mobile Network Testbed
Testbed name: Diverse Outdoor Mobile Environment (DOME)
a.k.a., Vehicular Mobile Network (obsolete title)
Technical Contacts
Principal Investigator:
Brian Levine,
UMass Amherst,
brian@cs.umass.edu http://prisms.cs.umass.edu/brian
Co-Principal Investigator:
Mark Corner,
UMass Amherst,
mcorner@cs.umass.edu
http://prisms.cs.umass.edu/mcorner/
Research Staff: Brian Lynn, UMass Amherst, blynn@cs.umass.edu
Participating Projects and Organizations
Diverse Outdoor Mobile Environment (DOME) project
UMass Amherst, Amherst, MA
Microsoft Research, Redmond,WA
HP Laboratories, Princeton, NJ
Intel Research, Hillsboro, OR
Cisco Systems, San Jose, CA
Scope
The scope of work on this project is to extend the DOME outdoor, mobile network testbed to support slivering and utilize a GENI candidate control framework (ORCA). This work includes the following items. 1) A virtualized operating system on the vehicular computers using Xen, which will allow for the isolation of experiments and customization of the operating environment, as well as permitting each experiment to begin from a known configuration. 2) Virtualized access to attached devices, including a 802.11 radio, GPS, and 900 MHz radio on each bus. 3) Standardized, general GENI mechanisms to authenticate users, install customized software and experiments, schedule DOME resources, and to log results. 4) Integration, deployment and access to GENI users.
Milestones
DOME: 1a Implement, integrate and document the required DieselNet hardware updates
due 12/1/08
completed 12/4/09
DOME: 1b Implement, integrate and document the Xen operating system and its virtualization features
due 2/1/09
completed 2/20/09
DOME: 1c Implement, integrate and document virtualized access to the WiFi radio
due 6/1/09
DOME: 1d Import and setup a GENI-compliant control framework based on ORCA
due 6/1/09
DOME: 1e Implement, integrate and document a first release (v1.0) of the software
due 10/1/09
DOME: 1f Demo basic virtualization and experiment control functions
due 10/1/09
DOME: 1g provide a VLAN connection from your testbed’s server to the Internet2 backbone network
due 10/1/09
Website maintained by UMass Amherst: GENI - DOME web site
Project Technical Documents
DOME Substrate Description, 2008
Quarterly Status Reports
DOME: 4Q08 Status Report
DOME: 1Q09 Status Report
Spiral 1 Connectivity
Location of equipment: For Spiral 1, all work will be done via a lab at UMassAmherst. However, the intention of this project is deploy equipment on mobile nodes in DieselNet. (See DOME Substrate Description for a description of all hardware, and see DOME Web Site for a description of DieselNet's current deployment.). Some engineering to prepare for mobile deployment will also be conducted during Spiral 1.
Layer 3 Connectivity: IP access will be through UMass Amherst's campus network, using their public IP addresses.
Layer 2 Connectivity: There is currently no usable layer2 connection to the UMass Amherst lab available for GENI. The project is investigating the possibility of installing local fiber that could enable a connection to NLR through an appropriate regional network. If installed this fiber would support both the DOME and ViSE projects in Spiral 1 and in later stages that include support for mobile nodes. Layer 2 ethernets will not extend to the DieselNet nodes, due to limitations in the existing deployed systems, but IP tunnels to the layer 2 VLAN termination points should be feasible for connecting mobile endpoints to the GENI virtual ethernets.
IT contact at UMass Amherst ?
GPO Liason System Engineer
Harry Mussman hmussman@geni.net
Attachments (17)
-
DOME_SubstrateCatalog.pdf (104.8 KB) - added by 16 years ago.
DOME substrate catelogue
- GENI-DOME-milestone1a.pdf (133.2 KB) - added by 16 years ago.
- DOMEGENI-Q1status.pdf (117.1 KB) - added by 16 years ago.
- DOMEGENI-Q2status.pdf (166.6 KB) - added by 15 years ago.
- GENI-DOME-milestone1b.pdf (178.7 KB) - added by 15 years ago.
- GENI-DOME-milestone1cd.pdf (395.9 KB) - added by 15 years ago.
- DOMEGENI-Q3status.pdf (165.8 KB) - added by 15 years ago.
- DOMEGENI-Q4status.pdf (163.7 KB) - added by 15 years ago.
- GENI-domefinal.pdf (74.1 KB) - added by 15 years ago.
- mou.pdf (88.8 KB) - added by 15 years ago.
- DOME-Federation.pdf (105.6 KB) - added by 15 years ago.
- DOMEGENI-Y2Q1-status.pdf (120.3 KB) - added by 15 years ago.
-
DOMEGENI-Y2Q2-status.pdf (28.2 KB) - added by 15 years ago.
Y2Q2 status report
-
DOME_2010Q3_Status.pdf (36.2 KB) - added by 14 years ago.
Q3 2010 Quarterly Status
-
DOME-Review-2010.pdf (3.0 MB) - added by 14 years ago.
DOME Project Review 2010
- DOME-WiMAX.pdf (2.7 MB) - added by 14 years ago.
- UMassWimax-GEC10.pdf (1.4 MB) - added by 14 years ago.