Changes between Initial Version and Version 1 of DOME-yr1final-status


Ignore:
Timestamp:
06/10/10 09:57:37 (14 years ago)
Author:
jtaylor@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • DOME-yr1final-status

    v1 v1  
     1[[PageOutline]]
     2
     3= DOME Project Status Report =
     4
     5Period: Year 1 Final Report
     6
     7== I. Summary ==
     8The purpose of this document is to summarize the status of DOME's fiscal year-end
     9milestones and mark the completion of Year 1.
     10
     11== A. Milestones ==
     12
     13'''Milestome 1e:''' Implement, integrate and document a first release (v1.0) of the software
     14for your mobile nodes (bricks), your centralized server, and web-based experiment
     15control software, to provide basic virtualization and experiment control functions,
     16including ORCA GENI-compliant control framework. (12mo)[[BR]]
     17'''Milestone 1f:''' Demo basic virtualization and experiment control functions in your
     18testbed, and at a GEC. (12mo)[[BR]]
     19'''Milestone 1g:''' Contingent upon available budget, provide a VLAN connection from your
     20testbed’s server to the Internet2 backbone network. (12mo)
     21Milestone 1h: Collaborate with O&M team on methods to share your O&M data with
     22other GENI groups for Spiral 1. (1-12mo)[[BR]]
     23'''Milestone 1i:''' Collaborate with Security team on security design for Spiral 1. (1-12mo)[[BR]]
     24'''Milestone 1j:''' Specific contribution to GENI outreach plan required for Spiral 1: Host an
     25“NSF Research Experience for Undergraduates Site”. (1-12mo)
     26
     27=== Milestone 1e: Implement, integrate and document a first release ===
     28This has been completed. The GENI DOME implementation has been installed on all
     29buses. The DOME Portal is up and available at:
     30
     31   http://geni.cs.umass.edu/dome
     32
     33The documentation for DOME is available at:
     34
     35   http://geni.cs.umass.edu/dome/docs.php
     36
     37Specifically, the primary documentation is available at:
     38
     39   http://geni.cs.umass.edu/dome/docs/DOME-Manual.pdf
     40
     41Software, including examples. can be found at:
     42
     43   http://geni.cs.umass.edu/dome/software.php
     44
     45We have completed the Year 1 development and documentation of DOME. We will
     46announce the availability of DOME to the GENI community before the end of the month.
     47
     48=== Milestone 1f: Demo basic virtualization and experiment control ===
     49This has been completed. DOME demonstrated its virtualization and control functions,
     50including integration with ORCA, at GEC5. Another demo is likely at GEC6.
     51
     52=== Milestone 1g: Contingent ... provide a VLAN connection ===
     53Completed. Though we did not have specific funding for a VLAN connection, we have
     54accomplished the following:
     55  * The UMass DOME and ViSE projects have collectively worked with the UMass Office of Information Technology (OIT). We have agreed to a high-level plan to get an Internet2 VLAN to our server in the Computer Science department.
     56  * We have an MOU with OIT for the installation of an Internet2/VLAN.
     57  * OIT is actively working on the details to connect our server to Internet2.
     58  * We have worked with the GPO to define specific Inernet2/VLAN deliverables for Year 2.
     59
     60=== Milestone 1h: Collaborate with O&M team on methods to share ... ===
     61Done. We have provided all information requested of us to the O&M team. We have
     62made the DOME ORCA controller and handler available to our cluster, and we provided
     63the O&M team early access to the DOME portal.
     64
     65=== Milestone 1i: Collaborate with Security team on security design ===
     66Completed, though not specifically as written. Year 1 evolved such that the focus was on
     67cluster-related discussions and designs. We fully participated in those discussions.
     68
     69=== Milestone 1j: Specific contribution to GENI outreach ===
     70Done. We hired an undergraduate student in the previous school year to work on the
     71buses and develop software to provide usage statistics on the bus's the 3G modem. This
     72software is deployed on the GENI version of DOME. We have rehired the undergraduate
     73to develop a DOME GENI-based experiment.
     74
     75[[BR]]
     76Converted submitted file by Julia Taylor (jtaylor@bbn.com). Original file can be found [http://groups.geni.net/geni/attachment/wiki/DOME/GENI-domefinal.pdf?format=raw here]