Changes between Version 9 and Version 10 of CmuLab


Ignore:
Timestamp:
04/20/09 15:39:00 (15 years ago)
Author:
Aaron Falk
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • CmuLab

    v9 v10  
    3838'''Milestones'''
    3939
    40 milestone:"CMU Lab: Get CMU ProtoGENI node on I2 VLAN"
     40milestone:"CMU Lab: Get CMU ProtoGENI node on I2 VLAN" ''(due 12/1/08)''
    4141[[BR]]
    4242milestone:"CMU Lab: bare bones node configuration" ''(completed 12/1/08)''
     
    4848milestone:"CMU Lab: deploy and operate 2 HomeNet nodes in CMU lab" ''(completed 1/31/09)''
    4949[[BR]]
    50 milestone:"CMU Lab: Tunneling packets from Utah to CMU"
     50milestone:"CMU Lab: Tunneling packets from Utah to CMU" ''(due 2/1/09)''
    5151[[BR]]
    5252milestone:"CMU Lab: desired node config & boot mgmt functionality" ''(completed 1/21/09)''
    5353[[BR]]
    54 milestone:"CMU Lab: Deploy and commence operations of 5 residential HomeNet nodes"
     54milestone:"CMU Lab: Deploy and commence operations of 5 residential HomeNet nodes" ''(due 3/1/09)''
    5555[[BR]]
    56 milestone:"CMU Lab: Emulator user interface integration"
     56milestone:"CMU Lab: Emulator user interface integration" ''(due 4/1/09)''
    5757[[BR]]
    58 milestone:"CMU Lab: IP-in-IP encap from CMU-Control to Homenet nodes"
     58milestone:"CMU Lab: IP-in-IP encap from CMU-Control to Homenet nodes" ''(due 4/1/09)''
    5959[[BR]]
    60 milestone:"CMU Lab: integrate with ProtoGENI control plane"
     60milestone:"CMU Lab: integrate with ProtoGENI control plane" ''(due 5/1/09)''
    6161[[BR]]
    62 milestone:"CMU Lab: integration of node-CMU and CMU-Utah tunnels"
     62milestone:"CMU Lab: integration of node-CMU and CMU-Utah tunnels"  ''(due 5/1/09)''
    6363[[BR]]
    64 milestone:"CMU Lab: Merge patches into ProtoGENI distribution"
     64milestone:"CMU Lab: Merge patches into ProtoGENI distribution" ''(due 7/1/09)''
    6565[[BR]]
    66 milestone:"CMU Lab: student testbed use"
     66milestone:"CMU Lab: student testbed use" ''(due 7/1/09)''
    6767[[BR]]
    68 milestone:"CMU Lab: GEC Demo"
     68milestone:"CMU Lab: GEC Demo" ''(due 10/1/09)''
    6969[[BR]]
    70 milestone:"CMU Lab: Integrated experimentation between CMU testbeds"
     70milestone:"CMU Lab: Integrated experimentation between CMU testbeds" ''(due 10/1/09)''
    7171
    7272'''Project Technical Documents'''