     1= CMU Lab Quarterly Status Report 1Q 2010, ending March 2010 =
     2
     3== Major accomplishments ==
     4=== A. Milestones Achieved ===
     5                * Design complete for Cisco VLAN-based data plane integration over disparate testbeds (#215)
     6                        The broad design for using single interfaces and 802.1Q to seperate control
     7                        and data plane traffic was completed.
     8                * Software to automate OpenVPN configuration, server management, and configuration
     9                        bookkeeping (#301)
     10                        MetaVPN, which replaces the manual work done in our past configuration and
     11                        use of OpenVPN, was completed. This makes management of nodes in a VPN as well
     12                        as creation or destruction of VPNs simple, quick, and scriptable.
     13                * Event system work done allowing for more automation/integration of Wireless emulation
     14                        by using the Emulab event system to control automated emulator tasks. This work
     15                        is more general and benefits the entire Emulab community.
     16=== B. Deliverables made ===
     17                * MetaVPN
     18                        MetaVPN is usable either in the context of a network testbed or in a standalone
     19                        mode, allowing for easy and scriptable management of OpenVPN instances. The
     20                        software is documented and was presented at a GEC.
     21                * Event system work
     22                        Patches were submitted and accepted at Utah that allow for a new category of
     23                        events that happen as an experiment is swapped out.
     24
     25== II. Description of work performed during the last quarter ==
     26=== A. Activities and findings ===
     27=== C. Publications (individual and organizational) ===
     28                None this quarter
     29=== D. Outreach activities ===
     30=== E. Collaborations ===
     31                As documented in the Utah quarterly report, we have been
     32                participating in weekly/biweekly conference calls
     33                with other members of our cluster. Our lead staff developer,
     34                Pat Gunn, has had other communications with smaller parts of
     35                the Emulab team as part of code design and development.
     36
     37=== F. Other contributions ===
     38