Changes between Version 2 and Version 3 of ClusterECall030110
- Timestamp:
- 03/01/10 15:56:10 (15 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
ClusterECall030110
v2 v3 27 27 28 28 29 11:15am :Status and plans of all seven GENI WiMAX meso-scale campus deployment projects:[[BR]]29 11:15am Status and plans of all seven GENI WiMAX meso-scale campus deployment projects:[[BR]] 30 30 Columbia University (1770) PI: Henning Schulzrinne [[BR]] 31 31 Henning on 2/8: Starting application process with IT. Likely site to be on engineering building, near amateur radio station. [[BR]] … … 35 35 Thanasis on 2/8: Starting applciation process. Likely site on EE building. [[BR]] 36 36 Thanasis on 3/1: Application completed 2/22, for two sites: EE and Admin buildings. Equipment expected in EE building. [[BR]] 37 Ivan on 3/1: Cables from roof to equipment room include: dual fiber; power; GPS receiver coax; within 1" dimaeter. 37 38 38 39 UCLA (1797) PI: Mario Gerla, Giovanni Pau [[BR]] … … 56 57 Tony on 3/1: Have received first license, 10MHz overlapping Sprint/Clearwire. Applied 1/12, received 2/24. Need to change emission designator. 57 58 59 11:35am Planning for meeting, demos at GEC7 58 60 61 Note: Everyone is invited to a WiMAX BOF dinner or beer event on Tuesday evening; please respond at http://www.doodle.com/hmmbrzdb4sgdtrbp 62 63 Note: Each project is invited to attend the OMIS meeting at GEC7 on Wednesday, 3/17, 3:30pm � 5:30pm 64 65 Demo at GEC7 [[BR]] 66 Ivan on 3/1: [[BR]] 67 68 1.) Demo of mobile OMF with location based control and WiMAX support 69 70 2.) Poster and table space for GENI BaseStation Kit hardware 71 72 73 Meeting(s)at GEC7: 74 75 76 77 78 [[BR]]Ray: Please think about the research you want to do, and provide email or input on the wiki; can help drive design of kit and software. 79 80 59 81 11:50 Wrapup:[[BR]] 60 Harry and Ivan: Please look at, and provide input to, wiki pages.[[BR]] 61 Ray: Please think about the research you want to do, and provide email or input on the wiki; can help drive design of kit and software. 62 63 Next call?[[BR]] 64 Yes, do between now and GEC7. [[BR]] 65 Harry: Pick: Monday, March 1, at 11am. [[BR]] 66 67 Meeting, demos at GEC7[[BR]] 68 82 69 83 Workshop at Rutgers to train campuses?[[BR]] 70 84 All: Yes, between GEC7 and GEC8, perhaps in June. [[BR]]