Changes between Version 2 and Version 3 of ClusterECall030110


Ignore:
Timestamp:
03/01/10 15:56:10 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ClusterECall030110

    v2 v3  
    2727
    2828               
    29 11:15am:        Status and plans of all seven GENI WiMAX meso-scale campus deployment projects:[[BR]]
     2911:15am         Status and plans of all seven GENI WiMAX meso-scale campus deployment projects:[[BR]]
    3030                Columbia University (1770)      PI: Henning Schulzrinne [[BR]]
    3131                Henning on 2/8:  Starting application process with IT.  Likely site to be on engineering building, near amateur radio station.  [[BR]]
     
    3535                Thanasis on 2/8:  Starting applciation process.  Likely site on EE building. [[BR]]
    3636                Thanasis on 3/1:  Application completed 2/22, for two sites:  EE and Admin buildings. Equipment expected in EE building. [[BR]]
     37                Ivan on 3/1:  Cables from roof to equipment room include:  dual fiber;  power;  GPS receiver coax;  within 1" dimaeter.
    3738               
    3839                UCLA (1797)     PI: Mario Gerla, Giovanni Pau [[BR]]
     
    5657                Tony on 3/1:  Have received first license, 10MHz overlapping Sprint/Clearwire. Applied 1/12, received 2/24.   Need to change emission designator.
    5758
     5911:35am   Planning for meeting, demos at GEC7
    5860
     61        Note:  Everyone is invited to a WiMAX BOF dinner or beer event on Tuesday evening;  please respond at http://www.doodle.com/hmmbrzdb4sgdtrbp
     62
     63                Note:  Each project is invited to attend the OMIS meeting at GEC7 on Wednesday, 3/17, 3:30pm � 5:30pm
     64
     65        Demo at GEC7 [[BR]]
     66                Ivan on 3/1:  [[BR]]
     67
     68        1.) Demo of mobile OMF with location based control and WiMAX support
     69
     70        2.) Poster and table space for GENI BaseStation Kit hardware
     71               
     72               
     73                Meeting(s)at GEC7:
     74               
     75               
     76               
     77               
     78                [[BR]]Ray:  Please think about the research you want to do, and provide email or input on the wiki;  can help drive design of kit and software.
     79               
     80               
    598111:50   Wrapup:[[BR]]
    60                 Harry and Ivan:  Please look at, and provide input to, wiki pages.[[BR]]
    61                 Ray:  Please think about the research you want to do, and provide email or input on the wiki;  can help drive design of kit and software.
    62 
    63                 Next call?[[BR]]
    64                 Yes, do between now and GEC7. [[BR]]
    65                 Harry:  Pick: Monday, March 1, at 11am.  [[BR]]
    66                
    67                 Meeting, demos at GEC7[[BR]]
    68                
     82                               
    6983                Workshop at Rutgers to train campuses?[[BR]]
    7084                All:  Yes, between GEC7 and GEC8, perhaps in June. [[BR]]