Changes between Version 8 and Version 9 of ClusterECall022311
- Timestamp:
- 02/23/11 15:01:33 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
ClusterECall022311
v8 v9 46 46 We've already selected the new location. It's one of the two locations where our campus is installing their own WiMAX equipment. There is a spare pole & mount already in place, so that simplifies installation. We have to install the "IDU" in a weatherized metal enclosure. Installation starts next Monday. The parts have been ordered this week & installation is being done by our campus IT group and professional building maintenance people.[[BR]] 47 47 48 We also have a professional RF propagation survey done from this location. I've attached that as a PPT. This is for the (now) existing WiMAX system our campus has put up. Our antenna will be pointing due north. The existing propagation model doesn't include our system yet, and we're getting that done -- this will provide a model that we will calibrate using the signal analyzer and RF cards. [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/UoC%20-%20MacroMAXe%20RF%20Plan%20V1.1.pptx slides]48 We also have a professional RF propagation survey done from this location. I've attached that as a PPT. This is for the (now) existing WiMAX system our campus has put up. Our antenna will be pointing due north. The existing propagation model doesn't include our system yet, and we're getting that done -- this will provide a model that we will calibrate using the signal analyzer and RF cards. [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/UoC%20-%20MacroMAXe%20RF%20Plan%20V1.1.pptx slides] 49 49 [[BR]] 50 50