Changes between Version 5 and Version 6 of ClusterECall022311


Ignore:
Timestamp:
02/23/11 14:58:55 (13 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ClusterECall022311

    v5 v6  
    1111  Polytechnic Institute of NYU  Thanasis Korakis [[BR]]
    1212  UCLA  Giovanni Pau[[BR]]
    13   Colorado x  [[BR]]
     13  Colorado email from Dirk Grunwald  [[BR]]
    1414  UMass Amherst Brian Lynn [[BR]]
    1515  Wisconsin   Derek Meyer [[BR]]
     
    3434== Deployment Status  (one slide from each campus) ==
    3535
    36   Columbia University (1770)    PI: Henning Schulzrinne   Sung Hoon Seo and Jan Janak:  [attachment:columbia_022311.ppt slides] [[BR]]
     36  Columbia University (1770)    PI: Henning Schulzrinne   Sung Hoon Seo and Jan Janak:  [attachment:columbia_022311.ppt slides] Waiting for contract approval and installation;  hope for early March. [[BR]]
    3737               
    38   Polytechnic Institute of NYU (1751)   PI: Thanasis Korakis  Thanasis: [  slides]    [[BR]]
     38  Polytechnic Institute of NYU (1751)   PI: Thanasis Korakis  Thanasis: [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/Poly_WiMAX_Feb_2011.ppt  slides] Have installed and are using WiMAX RF AggMgr.   [[BR]]
    3939
    4040  UCLA (1797)   PI: Mario Gerla, Giovanni Pau   Giovanni:  Antenna on 10th floor, -5deg tilt;  Windows laptop with usb-connected 6250;  seen 14Mb/s DL, 1 Mb/s UL;;  connect to vehicle up to 230M;  handoff WiMAX to WiFi;  heavy rain doubled delay;  $40k to install link to I2;  isntalled WiMAX RF AggMgr, but not yet in use;  will do range measurements by GEC10.      [[BR]]
    4141
    42   Colorado: (1768) PI: Dirk Grunwald Univ. of Colorado, Boulder  x  [[BR]]
     42  Colorado: (1768) PI: Dirk Grunwald Univ. of Colorado, Boulder  [[BR]]
     43
     44  email from Dirk: We've changed the mounting location because we think the wind profile of the antenna makes the mounting system on top of the other building questionable. We regularly get 40-60mph winds this time of year.[[BR]]
     45
     46  We've already selected the new location. It's one of the two locations where our campus is installing their own WiMAX equipment. There is a spare pole & mount already in place, so that simplifies installation. We have to install the "IDU" in a weatherized metal enclosure. Installation starts next Monday. The parts have been ordered this week & installation is being done by our campus IT group and professional building maintenance people.[[BR]]
     47
     48 We also have a professional RF propagation survey done from this location. I've attached that as a PPT. This is for the (now) existing WiMAX system our campus has put up. Our antenna will be pointing due north. The existing propagation model doesn't include our system yet, and we're getting that done -- this will provide a model that we will calibrate using the signal analyzer and RF cards.  [  slides]
     49 [[BR]]
    4350               
    44   UMass Amherst (1731)  PI:  Mark Corner, Brian Lynn    Brian: [  slides]   [[BR]]
     51  UMass Amherst (1731)  PI:  Mark Corner, Brian Lynn    Brian: [  slides] Have 6250 modem working with brick.  Have data path working;  have requested a second VLAN from IT.  [[BR]]
    4552                       
    46   Wisconsin (1724)      PI: Suman Banerjee   Derek Meyer: [  slides] [[BR]]
     53  Wisconsin (1724)      PI: Suman Banerjee   Derek Meyer: [  slides] Have 6250 modem working.  Installation in progress. [[BR]]
    4754               
    48   BBN Technologies, Cambridge MA  Manu Gosain and Tony Michel  x [[BR]]
     55  BBN Technologies, Cambridge MA  Manu Gosain and Tony Michel  (see below) [[BR]]
    4956
    5057 
     
    5663
    5764
    58 || Campus                          || Who || Indoors || Outdoors || Using Intel 6250 modem? || Access to GENI backbone? || Comments ||
    59 || Columbia University             || Jan Janak || Yes || Plan Feb 2011 || Yes || ? || Indoor testing started;  received info request from Clearwire
    60 || Polytechnic Institute of NYU    || Thanasis Korakis  || - || Yes || Yes || ? || Working on mobile stations and measurements
    61 || University of California, Los Angeles || Giovanni Pau || - || Yes || Intel 5130 modem || Campus via CENIC to I2 for Internet || Outdoor testing starting
    62 || University of Colorado, Boulder || Dirk Grunwald || Yes || Plan Feb 2011 ||x || Pricing campus tunnel to I2 || Working with campus IT;  outdoor testing started
    63 || University of Massachusetts || Brian Lynn || Plan soon || Plan March 2011 || Yes, with USB, under Xen || I2 || Facility plan revised;  prelim shading analysis completed
    64 || University of Wisconsin, Madison ||Derek Meyer || Yes || Plan Feb 2011 ||x || I2 is in next lab || Plant mgmt to install on Waisman Ctr
    65 || BBN Technologies || Tony Michel || - || Yes ||Yes || I2, NLR || Outdoor iperf testing underway
    66 || Rutgers University || Ivan Seskar || - || Yes || Yes || I2 || Plan Bush Campus install by Feb 2011
     65|| Campus                          || Who || Indoors || Outdoors || Using Intel 6250 modem? || Using WiMAX RF AggMgr? ||Access to GENI backbone? || Comments ||
     66|| Columbia University             || Jan Janak || Yes || Hope for early March || Yes || x || ? || Indoor testing started;  received info request from Clearwire
     67|| Polytechnic Institute of NYU    || Thanasis Korakis  || - || Yes || Yes || Yes || ? || Working on mobile stations and measurements
     68|| University of California, Los Angeles || Giovanni Pau || - || Yes || Intel 5130 modem || Installed, but not using || Campus via CENIC to I2 for Internet;  $40k charge || Outdoor testing starting
     69|| University of Colorado, Boulder || Dirk Grunwald || Yes || Installation starting Monday ||x || x || Pricing campus tunnel to I2 || Working with campus IT;  outdoor testing started
     70|| University of Massachusetts || Brian Lynn || Yes || Plan March 2011 || Yes, with USB, under Xen || x || Requesting 2nd VLAN || Facility plan revised;  prelim shading analysis completed
     71|| University of Wisconsin, Madison ||Derek Meyer || Yes || Installation underway ||x || x || I2 is in next lab || Plant mgmt to install on Waisman Ctr
     72|| BBN Technologies || Manu Gosain || - || Yes ||Yes || Yes || I2, NLR || Outdoor iperf testing underway
     73|| Rutgers University || Ivan Seskar || - || Yes || Yes || Yes || I2 || Plan Bush Campus install by Feb 2011
    6774
    6875