Version 36 (modified by 15 years ago) (diff) | ,
---|
Cluster D Integration
Projects
ORCA/BEN and ORCA Augmentation
DOME
ViSE
KanseiSensorNet
Embedded Real-Time Measurements
Data Intensive Cloud Control
Cyber-Physical System
Integrated Measurement Framework
iGENI Distributed Network Research Infrastructure
Meetings and Demos
ORCA-fest May 28, 2009, web site
Cluster D Review Meeting July 2, 2009
"ORCA/BEN Integration Demo with Stitching of VLANs between BEN and NLR", July 7, 2009
"ORCA/BEN Integration Demo July 7, 2009, web site
Cluster D Meetings at GEC5 July 20 and 21, 2009
References
GENI - ORCA web site, including ORCA code and ticket system
Subscribe to Cluster D mailing list (cluster-d@renci.org), for PIs and senior personnel, to discuss administrative cluster-wide issues
Subscribe to CLuster D mailing list (geni-orca-users@renci.org), primarily for developers, to discuss technical issues about the implementation, etc.
Documents
This is a list of documents and other information related to Cluster D integration.
Additional documents may be found on the project and GPO pages.
Prototype DOME controller and handler modules for ORCA, 2009
Roadmap
Spiral 1 Plan Document, on 7/02/09
Spiral 2 Roadmap slides, with task ratings, on 7/21/09
Cluster D Roadmap Document, on 10/15/09
Cluster D Roadmap Drawings, on 10/15/09
Connectivity
BEN Connectivity
DOME Connectivity
ViSE
Kansei Connectivity
Instrumentation and Mesurements
Experiments
Cluster D Clearinghouse at RENCI ; get login from Ilia Baldine
DOME and Federated Scheduling, i.e., towards an experiment that utilizes resources from multiple testbeds
Interoperability
Attachments (23)
- 070209b ClusterD_Spiral1_Plan.doc (90.0 KB) - added by 15 years ago.
- 072109b ClusterD_Meeting_GEC5.ppt (311.5 KB) - added by 15 years ago.
- 092309 ORCA_APIs_Flows.doc (11.8 MB) - added by 15 years ago.
- DOME-Federation.pdf (105.6 KB) - added by 15 years ago.
- 101509 ClusterD_Spiral2_Roadmap.pdf (133.5 KB) - added by 15 years ago.
- Visio-101509_ClusterD_Spiral2_Drawings.pdf (103.5 KB) - added by 15 years ago.
-
Visio-101509_ClusterD_Spiral2_Drawings_Page_01.2.jpg (495.5 KB) - added by 15 years ago.
fig 1-1
-
Visio-101509_ClusterD_Spiral2_Drawings_Page_02.jpg (389.9 KB) - added by 15 years ago.
fig 1-2
-
Visio-101509_ClusterD_Spiral2_Drawings_Page_03.jpg (280.4 KB) - added by 15 years ago.
fig 1-3
-
Visio-101509_ClusterD_Spiral2_Drawings_Page_04.jpg (272.6 KB) - added by 15 years ago.
fig 1-4
-
Visio-101509_ClusterD_Spiral2_Drawings_Page_05.jpg (292.0 KB) - added by 15 years ago.
fig 1-5
-
Visio-101509_ClusterD_Spiral2_Drawings_Page_06.jpg (290.3 KB) - added by 15 years ago.
fig 1-6
-
Visio-101509_ClusterD_Spiral2_Drawings_Page_07.jpg (299.1 KB) - added by 15 years ago.
fig 1-7
-
Visio-101509_ClusterD_Spiral2_Drawings_Page_08.jpg (491.8 KB) - added by 15 years ago.
fig 1-8
-
Visio-101509_ClusterD_Spiral2_Drawings_Page_09.jpg (300.9 KB) - added by 15 years ago.
fig 2-1
-
Visio-101509_ClusterD_Spiral2_Drawings_Page_10.jpg (304.6 KB) - added by 15 years ago.
fig 2-2
- features1.jpg (346.8 KB) - added by 15 years ago.
- features 2.jpg (235.1 KB) - added by 15 years ago.
- ops1.jpg (171.0 KB) - added by 15 years ago.
- ops2.jpg (71.3 KB) - added by 15 years ago.
- experiment.jpg (167.3 KB) - added by 15 years ago.
- vlan.jpg (156.1 KB) - added by 15 years ago.
- Visio-111609_ClusterD_Connectivity_Page_3.jpg (251.9 KB) - added by 15 years ago.