89 | | With ORCA, is there a method for leases to be canceled, or for outstanding requests to be revoked? This is required, or at least very highly desired, for DOME. Some scenarios: [[BR]] |
90 | | * An experiment is started on the buses and the researcher |
91 | | begins getting erroneous results, or the experiment |
92 | | starts generating too much data (this happens). We'd like |
93 | | to be able to prematurely terminate a lease to stop the |
94 | | experiment, even if the allocated resources are not |
95 | | returned to the pool. [[BR]] |
96 | | * An experiment is scheduled for the future, but then the |
97 | | researcher discovers he or she wants to change the |
98 | | experiment or alter the time. [[BR]] |
99 | | Obviously, there are many other scenarios that make the functionality desirable. [[BR]] |
| 89 | With ORCA, is there a method for leases to be canceled, or for outstanding requests to be revoked? This is required, or at least very highly desired, for DOME. Some scenarios: [[BR]] |
| 90 | * An experiment is started on the buses and the researcher |
| 91 | begins getting erroneous results, or the experiment |
| 92 | starts generating too much data (this happens). We'd like |
| 93 | to be able to prematurely terminate a lease to stop the |
| 94 | experiment, even if the allocated resources are not |
| 95 | returned to the pool. [[BR]] |
| 96 | * An experiment is scheduled for the future, but then the |
| 97 | researcher discovers he or she wants to change the |
| 98 | experiment or alter the time. [[BR]] |
| 99 | Obviously, there are many other scenarios that make the functionality desirable. [[BR]] |