[[PageOutline]] = GEMINI Spiral 5 Planning Meeting = == Schedule == Friday, October 5, 9:00am - 3:30pm [[BR]] == Location == Hilton Garden Louisville-Airport [[BR]] Address: 2735 Crittenden Drive Louisville, KY 40209 United States [[BR]] Tel: +1 (502) 637-2424 [[BR]] == Attendees == GENI Project Office: Harry Mussman, Jeanne Ohren [[BR]] Indiana Univ: Martin Swany, ... [[BR]] Univ of Kentucky: Jim Griffioen, [[BR]] == Description == == Summary == == Agenda == == 1) GEMINI Goals == 9:00am [[BR]] Spiral 5: [[BR]] Introduce and deploy new architecture; [[BR]] provide useful tools at each GEC [[BR]] v1.1/GEC15: [[BR]] Introduce new architecture with passive measurements; [[BR]] follow basic test/tutorial/experiment workflow [[BR]] v2beta/GEC16: [[BR]] Extend new architecture to include basic active measurements; [[BR]] extend analysis, presentation, storage and archiving of measurements [[BR]] v2.0/GEC17: [[BR]] Add full set of active measurements; [[BR]] follow infrastructure measurement workflow, including sharing data with others; [[BR]] include ability to retrieve data from storage for further analysis and presentation [[BR]] Spiral 6: [[BR]] Add functions, features and refinements, based on user feedback; [[BR]] integrate with other GENI tools (e.g., GENI CH Portal) [[BR]] Comments or changes? [[BR]] == 2) Basic Test/Tutorial/Experiment Workflow == 9:15am [[BR]] See [http://groups.geni.net/geni/wiki/TestTutorialExperimentWorkflow link] [[BR]] Sets requirements for use of tools by experimenter to instrument and measure their slice. [[BR]] Should be used as basis for GEC15 tutorial. [[BR]] Comments or changes? [[BR]] == 3) GEMINI Definition for v1.1/GEC15 == 9:30am See [http://groups.geni.net/geni/wiki/GEMINIv1.1Definition link] [[BR]] Comments or changes? [[BR]] == 4) Target Aggregates for v1.1/GEC15 and Spiral 5 == 10:00am v1.1/GEC15: [[BR]] Target either ProtoGENI clusters and InstaGENI racks [[BR]] However, since InstaGENI racks are still unstable, GEC15 tutorial will target only ProtoGENI clusters, preferably Univ Kentucky. [[BR]] v2beta/GEC16: [[BR]] Target either ProtoGENI clusters and InstaGENI racks [[BR]] GEC16 tutorial should target InstaGENI racks, preferably slices spanning multiple racks [[BR]] v2.0/GEC17: [[BR]] Add target of ExoGENI racks, for slices spanning multiple racks However, a slice does NOT need to span both == 5) Reference Experiments for v1.1/GEC15 and Spiral 5 == 10:15am == 6) Introducing New GEMINI Architecture for v1.1/GEC15 == 10:45am == 7) GEMINI Portal for v1.1/GEC15 == 11:15am == 8) GEMINI Integration Plan for v1.1/GEC15 == 11:30am == Lunch == 12noon == 9) Extending New GEMINI Architecture for Spiral 5 == 1:00pm == 10) Extending GEMINI Measurement Analysis, Presentation, Storage and Archive Functions in Spiral 5 == 1:30pm == 11) Extending GEMINI Portal Service in Spiral 5 == 2:00pm == 12) Review of GEMINI Plans and Open Issues for Spiral 5 == 2:30pm == Adjourn == 3:30pm === 2.1) Co-exist with Clearwire === 1:35pm [[BR]] Harry Mussman (GPO) and Ray Raychaudhuri (WINLAB) * Review of current licensing and leasing arrangements [[BR]] * Current GENI WiMAX sites, licenses and base stations * [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/030912_GENIWiMAXSites_Frequencies.xls spreadsheet] [[BR]] * Proposed leases by Clearwire, some limited to 1 year, up to $4k to renew, with "indemnification" [[BR]] * Kevin Wanuga of Drexel reports: When Drexel general counsel was negotiating with Clearwire, Clearwire was willing to drop indemnification clause, and some other difficult language, before agreement was finalized and signed; Drexel also has an experimental license. [[BR]] * Status of discussions with Clearwire [[BR]] * Harry reports: waiting to organize another call with Paul McCarthy at Clearwire. [[BR]] * Status of discussions with the FCC [[BR]] * Harry reports: GENI operates using experimental license as FCC intended; waiting for contact to review GENI documents. * Possible approach, as an alternative to an agreement that leases Clearwire spectrum to GENI sites: [[BR]] * Operate under an experimental license from the FCC [[BR]] * Agreement between Rutgers WINLAB and Clearwire, on enhanced cooperation [[BR]] * Responsive local contact, at each site [[BR]] * Centralized management DB at Rutgers WINLAB [[BR]] * Ability to quickly turn off site transmitter, if interference suspected [[BR]]