Changes between Version 26 and Version 27 of 041409NYCOptInWGAgenda
- Timestamp:
- 07/16/09 13:51:41 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
041409NYCOptInWGAgenda
v26 v27 17 17 To be able to discuss solutions to opt-in issues requires a knowledge of the strucutre of a GENI suite i.e., the entities, actors and agreements. It was decided to discuss possible structures, and identify likely reference structures, and this has been summarized in a DRAFT document. See [http://groups.geni.net/geni/attachment/wiki/041409NYCOptInWGAgenda/061509b%20%20GENI-SE-SY-STRO-01.1.pdf ] for the current DRAFT of the "GENI Structure Overview" document.[[BR]] 18 18 19 If you are interested in reviewing the overview document, please contact the WG Chairs, the WG System Engineer, or send mail to the WG mailing list. 20 19 21 20 22 '''References''': [[BR]]