wiki:020513_GEMINI_Demo

Version 27 (modified by Hussamuddin Nasir, 11 years ago) (diff)

--

Demo on Feb 5, 2013: Progress Towards GEMINI v2(beta) Release

February 5, 2013, 1pm - 4pm

Via webex

DRAFT (2/1) Agenda:

Introductions

1:00pm

1) Service to service authentication and authorization, using proxy certs

1:05pm
Ezra

GEMINI AA Demo

2) Instrumentize script

1:25pm
Ezra and Hussam

+ configuration (figure)

Hussam's slice will be pre-created and look like

+ summary of demo steps

There will be two version of the demo due to state of the code being worked on. Hussam's version of the instrumentize will have all code related to active measurement installation, configuration disabled, where as Ezra's version of the same instrumentation script will have the active measurements with the AA Stuff enabled.

+ current interfaces to other entities, and message flows (like “AA-workflow”)

+ features available now (2/5)

+ features expected to be available by GEC16 (3/19)

+ issues that need to be resolved before GEC16 (3/19)

3) Configuring GEMINI services, from GUI in GN, to UNIS, to services

1:40pm
Ahmed + others?

+ configuration (figure)

+ summary of demo steps

+ current interfaces to other entities, and message flows (like “AA-workflow”)

+ features available now (2/5)

+ features expected to be available by GEC16 (3/19)

+ issues that need to be resolved before GEC16 (3/19)

4) Measurements, BLiPP in nodes, to MS in GN, to GUI on GN

2:00pm
Matt

+ configuration (figure)

+ summary of demo steps

+ current interfaces to other entities, and message flows (like “AA-workflow”)

+ features available now (2/5)

+ features expected to be available by GEC16 (3/19)

+ issues that need to be resolved before GEC16 (3/19)

5) GENI Desktop, initing global node, displaying topology, instrumentize, displaying measurements

2:30pm
UKentucky Charles

+ configuration (figure)

+ summary of demo steps

+ current interfaces to other entities, and message flows (like “AA-workflow”)

+ features available now (2/5)

+ features expected to be available by GEC16 (3/19)

+ issues that need to be resolved before GEC16 (3/19)

6) Steps for accessing iRODS from GN via GSI

3:00pm
Hussam, Wesley, Jeanne, Shu

+ configuration (figure)

+ summary of demo steps

+ current interfaces to other entities, and message flows (like “AA-workflow”)

+ features available now (2/5)

+ features expected to be available by GEC16 (3/19)

+ issues that need to be resolved before GEC16 (3/19)

Features needed by GEC16 (3/19)

3:30pm
discussion

+ Image for GN

+ Image for other nodes

+ Basic host measurements, using BLiPP

+ Some active network measurements, using BLiPP

Issues that need to be resolved before GEC16 (3/19)

3:45pm
discussion

+ Usable on InstaGENI racks; also protoGENI?

+ Approach to first tutorial session: all demo (agree?)

+ Small-group topics for second tutorial session






Attachments (17)