Changes between Version 53 and Version 54 of 020513_GEMINI_Demo
- Timestamp:
- 02/05/13 12:01:27 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
020513_GEMINI_Demo
v53 v54 188 188 Hussam, Wesley, Jeanne, Shu [[BR]] 189 189 190 + configuration (figure) [[BR]] 191 192 + summary of demo [wiki:GEMINIGNtoiRODSDemo steps] [[BR]] 193 194 + current interfaces to other entities, and message flows (like “AA-workflow”) [[BR]] 190 ==== summary of demo [wiki:GEMINIGNtoiRODSDemo steps] ==== 191 192 ==== current interfaces ==== 195 193 Uses proxy certs generated during the instrumentize process and copied onto the GN Node. [[BR]] 196 197 + features available now (2/5) [[BR]] 194 Only interface available as of today is a command line to be run when logged into the GN Node to archive data.To view the data archived the user can use the icommands from the GN Node or can go to the irods Server's webinterface to view the data. [[BR]] 195 196 ==== features available now (2/5) ==== 198 197 * Current version on archives passive measurement data and metadata.[[BR]] 199 198 * There is no web-interface for the user to run this archive process[[BR]] … … 201 200 * Irods account creation is outside the scope of the GEMINI Instrumentize process. The user is expected to have this account before hand.[[BR]] 202 201 203 + features expected to be available by GEC16 (3/19) [[BR]]202 ==== features expected to be available by GEC16 (3/19) ==== 204 203 * Web-interface to initiate the archive process [[BR]] 205 204 206 + issues that need to be resolved before GEC16 (3/19) [[BR]]205 ==== issues that need to be resolved before GEC16 (3/19) ==== 207 206 * If there are plans for archiving Active measurement data, then that itself is a huge amount of work.[[BR]] 207 208 208 209 209 === Features needed by GEC16 (3/19) ===