Changes between Version 53 and Version 54 of 020513_GEMINI_Demo


Ignore:
Timestamp:
02/05/13 12:01:27 (11 years ago)
Author:
Hussamuddin Nasir
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • 020513_GEMINI_Demo

    v53 v54  
    188188Hussam, Wesley, Jeanne, Shu [[BR]]
    189189
    190  + configuration (figure) [[BR]]
    191 
    192  + summary of demo [wiki:GEMINIGNtoiRODSDemo steps]  [[BR]]
    193 
    194  + current interfaces to other entities, and message flows  (like “AA-workflow”) [[BR]]
     190 ==== summary of demo [wiki:GEMINIGNtoiRODSDemo steps] ====
     191
     192 ==== current interfaces ====
    195193Uses proxy certs generated during the instrumentize process and copied onto the GN Node. [[BR]]
    196 
    197  + features available now (2/5) [[BR]]
     194Only interface available as of today is a command line to be run when logged into the GN Node to archive data.To view the data archived the user can use the icommands from the GN Node or can go to the irods Server's webinterface to view the data. [[BR]]
     195
     196 ==== features available now (2/5) ====
    198197* Current version on archives passive measurement data and metadata.[[BR]]
    199198* There is no web-interface for the user to run this archive process[[BR]]
     
    201200* Irods account creation is outside the scope of the GEMINI Instrumentize  process. The user is expected to have this account before hand.[[BR]]
    202201
    203  + features expected to be available by GEC16 (3/19) [[BR]]
     202 ==== features expected to be available by GEC16 (3/19) ====
    204203* Web-interface to initiate the archive process [[BR]]
    205204
    206  + issues that need to be resolved before GEC16 (3/19) [[BR]]
     205 ==== issues that need to be resolved before GEC16 (3/19) ====
    207206* If there are plans for archiving Active measurement data, then that itself is a huge amount of work.[[BR]]
     207
    208208
    209209=== Features needed by GEC16 (3/19) ===