Timeline
01/05/11:
- 23:44 GeniInstMeas edited by
- (diff)
- 23:42 OnTimeMeasure edited by
- (diff)
- 23:35 OTM-CRONInstall edited by
- (diff)
- 23:35 OTM-PlanetLabInstall edited by
- (diff)
- 23:34 OnTime-Install edited by
- (diff)
- 23:30 OTM-CRONInstall edited by
- (diff)
- 23:29 OTM-PlanetLabInstall edited by
- (diff)
- 23:28 OTM-PlanetLabInstall edited by
- (diff)
- 23:27 OnTime-Install edited by
- (diff)
- 16:46 Ticket #683 (Create mailing list: genicloud-users@geni.net) closed by
- invalid: Syseng wiki ticket 1880 replaces this.
- 16:37 Ticket #683 (Create mailing list: genicloud-users@geni.net) created by
- Please create a mailing list genicloud-users@geni.net and seed it with …
- 12:27 ConnectivityHome edited by
- Added I2's OpenFlow switch IP addresses to the 10.37.15.0 and … (diff)
12/31/10:
- 18:19 Milestone ExptsSec: S3.a Report on results of experiments designed in Yr. 1 completed
- - Run and report initial experiments designed in Milestone #4 of Year1 …
- 17:41 Milestone ORCABEN: S3.b.2 "With other CFs, a plan for consistent names and interfaces and for resource descriptions at interoperability interfaces " completed
- 17:02 Milestone ORCAAUG: S3.b.2 SSH Proxy for Eucalyptus VMs completed
- 16:56 Milestone ORCAAUG: S3.b.1 ORCA intermediate code release and documentation completed
- 16:55 Milestone ORCABEN: S3.b.1 ORCA intermediate code release and documentation completed
- 16:28 ExptsSecurityAnalysis edited by
- (diff)
- 16:25 ExptsSecurityAnalysis edited by
- (diff)
- 16:19 ExptsSecurityAnalysis edited by
- (diff)
- 15:39 Milestone SPP: S3.b Deployment and integration of last two SPP nodes completed
- - We plan to install nodes in Atlanta and Houston. The GPO and …
12/29/10:
12/22/10:
- 15:15 Milestone CompSec: S3.b "Legal, Law Enforcement and Regulatory Plan v. 0.1. " completed
- - An approach and plan for how to handle requests from legal, law …
- 14:48 ConnectivityHome edited by
- Rutgers VLAN 3734 host changes to 10.37.34.101 (diff)
- 11:03 ClusterD edited by
- (diff)
- 11:00 ClusterD edited by
- (diff)
12/20/10:
- 15:25 QinqResults edited by
- replaced 8a88 with 88a8 (diff)
12/17/10:
12/16/10:
- 23:59 WIMXCOLUM/CUWIMAX edited by
- (diff)
- 23:59 WIMXCOLUM/CUWIMAX/OldSites created by
- 23:06 WIMXCOLUM/CUWIMAX edited by
- site changed (diff)
- 22:36 WIMXCOLUM edited by
- (diff)
- 22:33 WIMXCOLUM edited by
- (diff)
- 22:15 WIMXCOLUM edited by
- (diff)
- 10:16 LEARN edited by
- (diff)
12/15/10:
- 10:44 Milestone PGINTEGRN: S3.a API for AM<->AM coordination during stitching completed
- - This API will be used by ProtoGENI AMs to negotiate VLAN #s, tunnel …
- 10:41 Milestone PGTools: S3.b Prepare tools for export to other Emulab sites completed
- - Right now, they run fine with the Utah Emulab acting as the …
- 09:04 WiMAXInteg edited by
- (diff)
- 09:03 WiMAXInteg edited by
- (diff)
- 09:02 WiMAXInteg edited by
- (diff)
- 09:01 WiMAXInteg/ClientPlatforms edited by
- (diff)
- 09:01 WiMAXInteg/ClientPlatforms edited by
- (diff)
- 08:59 WiMAXInteg edited by
- (diff)
- 00:00 Milestone OppWireless: S2.d completed
- Complete implementation of an experiment based on a Pigeon network …
12/13/10:
- 14:21 SpiralTwo edited by
- (diff)
- 13:10 Ticket #682 (Stanford conenctivity outage 12/12/2010) closed by
- fixed: Johan van Reijendam. > It was completed yesterday. Stanford is …
12/10/10:
- 15:04 Gec9COMISAgenda edited by
- add presenter (diff)
- 10:15 WikiStart edited by
- updated GENI Backbone services to Spiral 3 (diff)
- 10:03 Ticket #682 (Stanford conenctivity outage 12/12/2010) created by
- Some maintenance will be done on the Quest 10Gb link to Sunnyvale …
12/09/10:
- 11:41 Gec9ServicesAgenda edited by
- (diff)
- 11:38 Gec9ServicesAgenda edited by
- (diff)
- 11:36 Gec9ServicesAgenda edited by
- (diff)
- 11:33 Gec9ServicesAgenda edited by
- (diff)
- 11:31 Gec9ServicesAgenda edited by
- (diff)
- 11:30 Gec9ServicesAgenda edited by
- (diff)
- 11:28 Gec9ServicesAgenda edited by
- (diff)
- 11:28 Gec9ServicesAgenda edited by
- (diff)
12/08/10:
- 12:55 ORCA-BEN QSR 2010-12-8 edited by
- (diff)
- 12:49 ORCA-BEN QSR 2010-12-8 edited by
- (diff)
- 11:57 ORCABEN edited by
- (diff)
- 11:56 ORCA-BEN QSR 2010-12-8 created by
- 11:56 ORCAAUG edited by
- (diff)
- 09:52 Mid-Atlantic Crossroads edited by
- (diff)
- 09:51 Mid-Atlantic Crossroads edited by
- (diff)
- 00:16 Mid-Atlantic Crossroads edited by
- (diff)
- 00:05 Mid-Atlantic Crossroads edited by
- (diff)
12/07/10:
Note: See TracTimeline
for information about the timeline view.