Timeline
09/17/10:
- 21:35 Ticket #567 (VMI Functionality demo on cluster nodes) created by
- 1. Brief demo description (A few sentences suitable for a GEC9 …
- 19:29 Ticket #566 (GEINIVIOLIN: In-Network Suspend and Resume for GENI Experiments) created by
- 1. Brief demo description GENI-VIOLIN's goal is to build an …
- 17:01 Milestone Hive: S2.b completed
- : Develop design specification for devices using security framework …
- 14:44 Ticket #565 (Install Internet2 OpenFlow switch in Los Angeles) created by
- Deploy NEC switch in Los Angeles Target date: 25-Oct-2010
- 14:40 Ticket #564 (Install Internet2 OpenFlow switch in Washington, DC) created by
- Deploy NEC switch in Washington, DC Target date: 18-Oct-2010
- 14:38 Ticket #563 (Install Internet2 OpenFlow switch in Houston) created by
- Deploy NEC switch in Houston. Target date: 11-Oct-2010
- 14:36 Ticket #562 (Install NEC OpenFlow switch in Internet2 Atlanta) created by
- This would remove the HP 3500 currently installed in Atlanta, and …
- 14:28 Ticket #551 (Intstall first I2 OpenFlow switch in Atlanta) closed by
- fixed: Completed 15-Sep-2010, and the link to NLR's Atlanta OpenFlow switch is up.
- 14:26 Ticket #561 (Install Internet2 OpenFlow switch in New York) created by
- Looking to deploy first NEC switch, in New York, around 10/4/2010 …
- 13:20 OnTime-Installv1 edited by
- (diff)
- 00:30 PersistentTestHostRequirments edited by
- notes for iperf deamon (diff)
09/16/10:
- 18:56 Ticket #559 (Please create GEC9 report link for Ticket Reports section on public ...) closed by
- invalid: Replaced with GST 1320.
- 18:52 Ticket #560 (Plan for GEC9 demos) created by
- Determine/coordinate demo needs and plan for supporting demos.
- 18:48 GEC8DemoSummary edited by
- add note about GpENI. Poster file not available. (diff)
- 18:42 Ticket #559 (Please create GEC9 report link for Ticket Reports section on public ...) created by
- Need to get ready for GEC9 demo request processing. (Chaos, feel free …
- 18:35 Ticket #471 (Pathlet routing demo resource request for GEC8) closed by
- fixed
- 18:35 Ticket #470 (NetServ demo resource request for GEC8) closed by
- fixed
- 18:34 Ticket #469 (Stanford OF demo of packet and circuit convergence (OFSTAN-PCC)) closed by
- fixed
- 18:34 Ticket #465 (GENI-VIOLIN: Distributed Suspend and Resume for GENI Experiments) closed by
- fixed
- 18:34 Ticket #464 (University of Washington OpenFlow Demo) closed by
- fixed
- 18:33 Ticket #468 (Raven GEC8 demo) closed by
- wontfix: Project did not demo at GEC8 due to lack of room in the demo area.
09/15/10:
- 22:52 GeniApiInstallationMyPlc created by
- 22:51 GeniApiInstallingFedora8 created by
- 17:48 Ticket #558 (Milestone S2.l completion) closed by
- fixed: Let me know if I should email anyone else about this.
- 17:48 Ticket #558 (Milestone S2.l completion) created by
- The DiCloud POC for the GENI security team is cecchet@cs.umass.edu
- 17:47 Ticket #557 (Milestone S2.k completion) closed by
- fixed: Let me know if I should email anyone else about this.
- 17:46 Ticket #557 (Milestone S2.k completion) created by
- The DiCloud POC for the GENI response team is cecchet@cs.umass.edu
- 17:45 Ticket #556 (Milestone S2.i completion) closed by
- fixed: Initial web portal available online (restricted access until deadline …
- 17:44 Ticket #556 (Milestone S2.i completion) created by
- Web portal for DiCloud is available at …
- 16:24 Milestone DICLOUD: S2.i Extend ViSE web portal to include cloud completed
- Extend ViSE’s web portal to include functions for users to lease EC2, …
- 12:40 SiteInternet2 edited by
- added K-State's ION to BBN with known MAC addresses. also noted VLAN … (diff)
- 11:18 SiteNlr edited by
- updated I.U.'s MAC addrress for 10.37.5.49 (diff)
- 09:42 SiteNlr edited by
- (diff)
- 08:59 Omni edited by
- (diff)
09/14/10:
09/13/10:
- 16:07 Embedded Real-Time Measurements edited by
- (diff)
- 16:04 Embedded Real-Time Measurements edited by
- (diff)
- 16:00 Embedded Real-Time Measurements edited by
- (diff)
- 13:04 Ticket #555 (IU Openflow Intergration testing) created by
- I'm trying to clean up Milestones for the OpenFlow project. We should …
- 12:58 SiteNlr edited by
- (diff)
- 12:38 Omni edited by
- (diff)
- 12:30 SiteNlr edited by
- added notes of VLANs 3702 and 3705 being UP (Indiana) (diff)
- 10:58 SiteNlr edited by
- noted that gatech is up (diff)
- 10:55 SiteNlr edited by
- noted that Stanford-Clemsons pt2pt VLAN is up, added host info. (diff)
09/12/10:
09/10/10:
- 14:13 GeniApi edited by
- (diff)
- 13:36 Omni edited by
- (diff)
- 13:34 Omni edited by
- (diff)
- 13:33 Omni edited by
- (diff)
- 13:31 Omni edited by
- (diff)
- 13:16 Omni edited by
- (diff)
- 13:12 Omni edited by
- (diff)
- 13:10 Omni edited by
- (diff)
- 13:09 Omni edited by
- (diff)
- 13:07 Omni edited by
- (diff)
- 12:54 Omni created by
- 12:52 GeniApi edited by
- (diff)
- 09:08 OpticalAccessNets edited by
- (diff)
09/09/10:
- 15:57 Ticket #554 (milestone S2.f) created by
- Milestone S2.f updated version
- 15:57 Ticket #553 (Milestone S2.e) created by
- Milestone S2.d updated version
- 15:56 Ticket #552 (milestone S2.d) created by
- Milestone S2.d updated version
09/08/10:
- 17:20 ConnectivityOptions edited by
- Indiana is now available over NLR (diff)
- 17:18 SiteNlr edited by
- added BBN - indiana's VLAN 3710 (point to point) (diff)
- 17:14 SiteIndiana edited by
- added VLANs for NLR (diff)
- 13:21 PathletRouting edited by
- (diff)
09/07/10:
- 16:18 GeniNewcomers edited by
- fixed hpyerlinking (diff)
- 14:04 Gec9Agenda created by
- Initial draft
- 12:30 SiteRutgers edited by
- added new VLAN range for Internet 2 and new endpoint (diff)
- 09:57 PathletRouting edited by
- (diff)
- 09:41 PathletRouting created by
09/06/10:
09/04/10:
09/03/10:
- 17:05 GpENI edited by
- (diff)
- 16:25 GpENI edited by
- (diff)
- 15:41 SiteNlr edited by
- Updated IP address typos form migrating from site pages (thanks Chaos) (diff)
- 14:46 Ticket #551 (Intstall first I2 OpenFlow switch in Atlanta) created by
- Matt reports that I2 intends to install the first I2 OpenFlow switch …
- 12:18 VMI-FED edited by
- (diff)
- 10:50 Ticket #550 (Security review of GpENI project.) created by
- Steve: Pl. let James and me know if you have all the information you …
- 00:30 OFI2 edited by
- (diff)
- 00:22 OFI2 edited by
- (diff)
- 00:00 Milestone OFI2: S2.a Complete initial deployment plan completed
- Complete initial Internet2 deployment plan for year 1 (5 cities). …
- 00:00 Milestone OFI2: S2.d Complete draft plan for integrating initial deployment with ProtoGENI completed
- Complete a draft Internet2 engineering plan for integrating the …
09/02/10:
- 19:11 Milestone Attrib: S2.b completed
- Report updated with several example scenarios, including possibly one …
- 16:26 SiteNlr edited by
- minor typo (diff)
- 15:09 Ticket #485 (U Wisc Caching Demo (UWI-PRE)) closed by
- fixed: Please check the GEC8 demo page …
- 15:08 GEC8DemoSummary edited by
- Add link to UWI OpenFlow PRE demo (diff)
- 14:51 SiteRutgers edited by
- (diff)
- 14:33 OFNLR-2010Q2-status edited by
- un-wikify PoPs (diff)
- 14:32 OFNLR-2010Q1-status edited by
- un-wikify PoPs (diff)
- 13:40 OFNLR-2010Q2-status edited by
- (diff)
- 13:30 WaveNet created by
- 13:28 OFNLR-2010Q2-status created by
- 10:40 GeniAggregateManagerApiDoc edited by
- (diff)
09/01/10:
- 21:44 OFNLR edited by
- (diff)
- 20:23 FrameNet edited by
- (diff)
- 20:22 FrameNet edited by
- (diff)
- 20:20 FrameNet created by
- 17:54 Ticket #472 (OKGEMS demo at GEC8) closed by
- fixed
- 17:53 Ticket #498 (Milestone S2.d Completion) closed by
- fixed
- 17:50 WIMXUCLA edited by
- (diff)
- 17:49 Ticket #549 (Milestone S2.a completion) created by
- 9/1: Task is late due to late arrival of equipments and late …
- 17:43 Ticket #540 (Milestone S2.a completion) closed by
- fixed
- 17:41 Milestone WIMXUWI: S2.a Initial integration of static and mobile nodes in MadBed testbed with ORBIT completed
- Initial integration of static and mobile nodes in MadBed testbed …
- 17:41 Ticket #548 (Milestone S2.a completion) closed by
- fixed
- 17:41 Ticket #548 (Milestone S2.a completion) created by
- Initial deployment of Cisco Aironet 1522 mesh access points to provide …
- 17:30 Ticket #547 (Milestone S2.b completion) closed by
- fixed
- 17:30 Ticket #547 (Milestone S2.b completion) created by
- Ivan on 9/1: Winlab, BBN and NYU Poly have full WiMAX deployments …
- 17:24 Milestone SCAFFOLD: S2.j http stateless server completed
- Demonstrate “stateless servers” technique on SCAFFOLD network for …
- 17:22 Milestone SCAFFOLD: S2.i demo flow migration completed
- Demonstrate SCAFFOLD network within L2 domain with unmodified clients …
- 17:18 Milestone WiMAX: S2.m POC to GENI security team completed
- Provide POC to Security team and provide input for security review in …
- 17:17 Milestone WiMAX: S2.l POC to GENI response team completed
- Provide POC to GENI Prototype Response and Escalation team. …
- 17:15 Ticket #473 (WiMAX (including ORBIT) demo at GEC8) closed by
- fixed
- 17:04 Ticket #546 (Milestone S2.l completion) closed by
- fixed
- 17:04 Milestone ORBIT: S2.l Contribution to GENI outreach completed
- Specific contribution to GENI outreach plan: (9/1/09-8/31/10)
- 17:04 Ticket #546 (Milestone S2.l completion) created by
- Marco on 9/1; Underrepresented students, educational platform, …
- 17:01 Milestone ORBIT: S2.k POC to GENI security team completed
- Provide POC to Security team and provide input for security review in …
- 17:00 Milestone ORBIT: S2.j POC to GENI response team completed
- Provide POC to GENI Prototype Response and Escalation team. …
- 16:58 Ticket #418 (Milestone S2.i completion) closed by
- fixed
- 16:57 Milestone ORBIT: S2.h Federated testbeds available to GENI users completed
- Provide OMF support for experimentation on federated testbeds by GENI …
- 16:56 Ticket #417 (Milestone S2.f completion) closed by
- fixed
- 16:54 Milestone ORBIT: S2.g Demo experiments with multiple testbeds completed
- Develop experiments that demonstrate federation and mobility …
- 16:54 Ticket #545 (Milestone S2.g completion) closed by
- fixed
- 16:54 Ticket #545 (Milestone S2.g completion) created by
- Max on 9/1: Have done OMF experiments using: multiple OMF sites; …
- 16:50 Ticket #414 (Milestone S2.d completion) closed by
- fixed
- 16:40 Ticket #415 (Milestone S2.a completion) closed by
- fixed
- 16:33 OFNLR edited by
- (diff)
- 16:17 WIMXCOLUM edited by
- (diff)
- 16:16 WIMXUCO edited by
- (diff)
- 16:14 WIMXRG edited by
- (diff)
- 16:12 WiMAX edited by
- (diff)
- 15:54 Milestone ORCAAUG: S2.b Rel 2.2_2 ORCA code to projects completed
- Implement and provide release 2.2 of ORCA code to other Cluster D …
- 15:53 Milestone ORCABEN: S2.b Rel 2.2_1 ORCA code to projects completed
- Implement and provide release 2.2 of ORCA code to other Cluster D …
- 14:47 Ticket #475 (Measurement System Demo for UWisc Madison) closed by
- wontfix: Insufficient space in demo area to grant this request
- 14:46 Ticket #467 (GEC8 Demo Request: IMF) closed by
- wontfix: Insufficient space in demo area to grant this request
- 14:45 Ticket #463 (Kentucky GEC8 Demo Requirements) closed by
- wontfix: Insufficient space in demo area to grant this request
- 14:39 Ticket #460 (GEC8 Demo Request: GENI Cloud Project) closed by
- fixed
- 14:30 SiteNlr edited by
- more clarifications of NLR membership requirments (diff)
- 13:47 SiteNlr edited by
- updated language aboult membership information. (diff)
- 13:18 Milestone VMI-FED: S2.e GENI VMI demo completed
- 09/01/10 - Demonstration of initial VMI functionality on GENI cluster …
- 12:50 SiteBbn edited by
- reserved our VLAN 3731 for use with K-state (diff)
- 12:46 ConnectivityHome edited by
- added range for Kansas State (diff)
- 11:59 PersistentTestHostRequirments edited by
- added notes about two iperf servers one for UDP one for TCP. (diff)
- 11:50 SiteNlr edited by
- typo on type (diff)
- 11:49 SiteNlr edited by
- typo (diff)
- 11:45 Ticket #544 (Milestone ERM S2.f) created by
- 11:41 PersistentTestHostRequirments edited by
- minor capitilization (diff)
- 10:54 SiteNlr edited by
- aded note about broadcast traffic. (diff)
- 09:31 WIMXUWI edited by
- (diff)
- 09:17 WIMXUCLA edited by
- (diff)
- 09:15 WIMXUMASS edited by
- (diff)
- 09:13 WIMXNYUPT edited by
- (diff)
- 09:04 ORBIT edited by
- (diff)
- 06:20 WIMXUCLA edited by
- (diff)
- 06:19 WIMXUCLA edited by
- (diff)
- 05:55 WIMXUCLA edited by
- (diff)
- 05:45 Ticket #543 (Started installation on Nodes and Base Station) created by
- Started WiMax Installation on Nodes and Base Station Installation.
- 05:39 WIMXUCLA edited by
- (diff)
- 02:04 Ticket #542 (ERM S2.e milestone report) created by
- ERM S2.e milestone report
- 02:03 Ticket #541 (ERM S2.d milestone report) created by
- ERM S2.d milestone report
08/31/10:
- 21:40 Milestone DIGOBREG: S2.h Contribute to GENI outreach completed
- CNRI personnel will prepare at least one journal article describing …
- 21:15 Milestone DIGOBREG: S2.f Evaluation report on GENI Federated Clearinghouse completed
- Evaluate the GENI Federated Clearinghouse (GFC) in terms of …
- 20:08 WIMXUCLA edited by
- (diff)
- 20:03 WIMXUCLA edited by
- (diff)
- 19:47 WIMXUCLA edited by
- (diff)
- 19:45 WIMXUCLA edited by
- (diff)
- 19:38 Ticket #540 (Milestone S2.a completion) created by
- The installation has finished, the testbed is functional and we are in …
- 19:04 WIMXNYUPT edited by
- (diff)
- 18:56 WIMXUCLA edited by
- (diff)
- 15:26 Milestone MILNGENI: S2.h Sprial 2 identify management mechanisms completed
- Integrate Sprial 2 identify management mechanisms into SeattleGENI. …
- 15:11 Milestone MILNGENI: S2.g v0.1 of end-host clearinghouse completed
- Reference implementation v0.1 of end-host clearinghouse (SeattleGENI) …
- 13:52 Milestone KANSEI: S2.l Contribution to GENI outreach completed
- Specific contribution to GENI outreach plan required for Spiral 2. …
- 13:29 Milestone RAVEN: S2.g spiral 2 id mgmt completed
- g) Modify Raven to use Spiral 2 identity management mechanisms. (Aug. …
- 12:09 Milestone MeasurementSys: S2.f Update GIMS document based on deployment tests and user feedback completed
- Update GIMS document based on deployment tests and user feedback. …
- 12:02 Ticket #539 (Milestone S2.g completion) closed by
- fixed
- 12:02 Ticket #539 (Milestone S2.g completion) created by
- Per Ilia on 8/30: Demonstrated at GEC8
- 11:55 Milestone ORCABEN: S2.o Contribution to GENI outreach completed
- Specific contribution to GENI outreach plan required for Spiral 2: …
- 11:55 Ticket #538 (Milestone S2.o completion) closed by
- fixed
- 11:55 Ticket #538 (Milestone S2.o completion) created by
- Ilia on 8/30: Chase helped organize Tridentcom; Held discussions with …
- 11:47 Ticket #537 (Milestone S2.h completion) closed by
- fixed
- 11:47 Ticket #537 (Milestone S2.h completion) created by
- Ilia on 8/30: Several pre-GENI-experimenter workshop experiments run …
- 11:43 Milestone ORCABEN: S2.f GMOC access to clearinghouse completed
- Collaborate with GMOC operations group on providing access to Cluster …
- 11:43 Ticket #536 (Milestone S2.f completion) closed by
- fixed
- 11:43 Ticket #536 (Milestone S2.f completion) created by
- Ilia on 8/30: CH with broker and actor registry operational at …
- 11:39 Ticket #407 (Milestone S2.e completion) closed by
- fixed
- 11:39 Ticket #407 (Milestone S2.e completion) reopened by
- 11:32 ORCABEN edited by
- (diff)
- 11:32 ORCABEN edited by
- (diff)
- 11:25 Mid-Atlantic Crossroads edited by
- (diff)
- 11:24 Milestone UMLPEN: S2.f Specific contribution to GENI outreach plan completed
- Specific contribution to GENI outreach plan (9/1/09-8/31/10) Status: …
- 11:23 Milestone DOME: S2.m Contribution to GENI outreach completed
- Specific contribution to GENI outreach plan required for Spiral 2: …
- 11:22 Ticket #297 (Milestone S2.m completion) closed by
- fixed
- 11:22 Mid-Atlantic Crossroads edited by
- (diff)
- 11:17 Mid-Atlantic Crossroads edited by
- (diff)
- 11:13 ORBIT edited by
- (diff)
- 11:12 ORBIT edited by
- (diff)
- 10:46 Milestone GpENI: S2.n outreach completed
- Contribute to GENI outreach plan, as detailed in year-1 milestone, …
- 10:12 Ticket #535 (Milestone S2.g completion) created by
- Seskar on 8/25: wo undergraduate students were involved in framework …
- 10:09 Ticket #534 (Milestone S2.f completion) created by
- Per Seskar on 8/25: Framework as well as all of the technical …
- 10:05 Ticket #533 (Milestone S2.e completion) created by
- Per Seskar on 8/25: Two nodes are available for remote access as …
- 09:59 Ticket #532 (Milestone S2.c completion) closed by
- fixed
- 09:58 Ticket #532 (Milestone S2.c completion) created by
- Per Seskar on 8/25/10: Initial integration was demo'd at GEC7, and …
- 09:53 Ticket #474 (COGRADIO demo at GEC8) closed by
- fixed
- 09:39 GENISecurity edited by
- (diff)
- 09:28 Ticket #531 (Milestone S2.m completion) closed by
- fixed
- 09:27 Ticket #531 (Milestone S2.m completion) created by
- The DOME project's contribution to community outreach has included the …
- 09:04 Ticket #530 (Get feedback and Revise Concept of Operations Document) created by
- No significant feedback from mailing list on Concept of Operations …
08/30/10:
- 17:32 Quilt edited by
- (diff)
- 17:28 Ticket #529 (open registration and accept travel requests) closed by
- fixed
- 17:28 Ticket #529 (open registration and accept travel requests) created by
- All forms were prepared in advance and workshop was announced June 3, …
- 17:10 Ticket #527 (Close travel request submission.) closed by
- fixed
- 17:06 Ticket #528 (Close Quilt workshop registration) closed by
- fixed
- 17:06 Ticket #528 (Close Quilt workshop registration) created by
- The workshop was announced and registration opened via the URL below: …
- 17:03 Ticket #527 (Close travel request submission.) created by
- Travel requests closed June 25, 2010 as documented at this URL: …
- 16:58 Ticket #526 (Publish and review agenda) closed by
- fixed
- 16:57 Ticket #526 (Publish and review agenda) created by
- Draft Agenda version 1.4 was reviewed at 4/15 program committee …
- 16:46 Ticket #525 (OFGT: S2.f Upgrade small deployments to use OF 1.0) created by
- Upgrade small deployments to use OpenFlow 1.0 implementations and GENI …
- 16:42 Ticket #524 (Campus small deployment completed on-time) created by
- The campus small deployment was completed during Q1 2010 with six …
- 16:38 Ticket #523 (Equipment selection completed on-time) created by
- The original equipment evaluation took place during Q4 2009 and Q1 …
- 16:37 GeniApi edited by
- (diff)
- 16:31 Ticket #522 (Create workshop committee and meet regularly to plan workshop.) closed by
- fixed
- 16:30 Ticket #522 (Create workshop committee and meet regularly to plan workshop.) created by
- Workshop Committe was formed in January 2010. First meeting was …
- 16:18 Quilt edited by
- (diff)
- 16:08 GEC8DemoSummary edited by
- Added link to UWisc OpenFlow demo poster (diff)
- 15:54 GeniAggregateManagerApiDoc edited by
- (diff)
- 15:47 GpoDoc edited by
- (diff)
- 15:32 OFGT edited by
- (diff)
- 15:11 Ticket #462 (Demo request for UMLPEN) closed by
- fixed
- 14:59 Ticket #461 (Expedient Demo (OFSTAN-EXP)) closed by
- fixed
- 14:54 Ticket #458 (U Wisc OpenFlow demo) closed by
- fixed
- 14:43 GEC8DemoSummary edited by
- Add demo summary from Gember (diff)
- 14:41 GpoDoc edited by
- (diff)
- 14:25 GEC8DemoSummary edited by
- Delete directions for making additions--pages should be done now. (diff)
- 14:22 Gec8Agenda edited by
- Add link to posters and descriptions (diff)
- 13:16 GeniAggregateManagerApiDoc edited by
- (diff)
- 13:12 GeniAggregateManagerApiDoc created by
- 12:54 TIED edited by
- Added S2 review slides (diff)
- 10:58 TIEDQ22010 created by
- 10:57 TIED edited by
- add link for Q2 2010 QSR (diff)
- 10:34 Ticket #521 (Design GENI Aggregate Manager software components for Shadownet.) created by
- The team has also discussed GENI's use of the Juniper SDK for …
- 10:16 Ticket #520 (Specify and purchase 4 Juniper routers.) created by
- The ShadowNet team has specified the Juniper hardware and software …
- 08:29 ConnectivityHome edited by
- added /24 to host IP's to help clarify that they are not /28 subnets (diff)
- 08:28 ConnectivityHome edited by
- aded links to site pages in IP range table (diff)
- 08:25 ConnectivityHome edited by
- adapting ranges to account for Wisconsins IP address with Stanford's … (diff)
08/29/10:
- 23:49 PrimoGENI edited by
- (diff)
- 23:48 PrimoGENI edited by
- (diff)
- 18:48 PrimoGENI edited by
- (diff)
- 18:47 PrimoGENI edited by
- (diff)
- 18:34 PrimoGENI edited by
- (diff)
- 13:30 PrimoGENIStatusReport2010Q2 edited by
- (diff)
- 13:21 PrimoGENIStatusReport2010Q2 created by
- 12:33 PrimoGENI edited by
- (diff)
08/28/10:
- 23:00 LEFA edited by
- (diff)
- 15:45 GENISecurity-4Q09-status edited by
- (diff)
- 15:45 GENISecurity-4Q09-status created by
- 15:01 GENISecurity-1Q10-status edited by
- (diff)
- 15:00 GENISecurity-1Q10-status edited by
- (diff)
- 14:59 GENISecurity-1Q10-status created by
- 14:55 GENISecurity-2Q10-status created by
- 14:49 GENISecurity edited by
- (diff)
- 14:27 ABAC-QSR-4Q2009 created by
- 14:24 ABAC edited by
- (diff)
08/27/10:
- 20:56 TIEDFedd30GIR12 edited by
- Add note about 3.01 (diff)
- 19:30 SiteNlr edited by
- removed duplicate VLAN 3712 (diff)
- 17:40 Milestone PGINTEGRN: S2.e Service implementer's guide completed
- Release a guide for projects implementing services in ProtoGENI …
- 16:56 Milestone ORBIT: S2.f Support integration of latest OMF code into cluster testbeds completed
- Support integration of latest OMF code into WiMAX and cognitive radio …
- 16:50 Milestone ORBIT: S2.d Federate cluster testbeds completed
- Work with WiMAX and cognitive radio projects, to integrate their …
- 16:04 TIED edited by
- (diff)
- 15:58 TIEDFedd30GIR12 created by
- 15:49 Ticket #512 (Software release completed (30 Jun 20910)) closed by
- fixed: Thanks for the additional information. Luisa will follow up if she …
- 15:19 SiteWashington edited by
- remoed OptionsIndex and conenctivity links (links are in footer) (diff)
- 15:14 SiteStanford edited by
- (diff)
- 15:13 SiteWisconsin edited by
- (diff)
- 15:11 SiteInternet2 edited by
- added site ION info from site pages (diff)
- 15:10 SiteRutgers edited by
- migrated ION connectivity information to SiteInternet2 (diff)
- 15:07 OFIU edited by
- (diff)
- 14:49 GENIMetaOps edited by
- (diff)
- 14:46 GENIMetaOps edited by
- Added link to q3 (diff)
- 14:42 SiteGeorgiaTech edited by
- removed extra IOn info and extranious Connectivity links (diff)
- 14:39 SiteClemson edited by
- removed extra ION info (diff)
- 14:37 SiteInternet2 edited by
- added ION vlans from BBN (diff)
- 14:35 SiteBbn edited by
- migrated ION info to[" SiteInternet2'] (diff)
- 14:12 IMF edited by
- (diff)
- 13:56 SiteIndiana edited by
- removed IOn VLANtables, cleaned up ION ordering, removed conenctivity … (diff)
- 13:48 SiteNlr edited by
- added wisconsin's PTH on VLAN 3713 (diff)
- 12:41 Shadow edited by
- Add Q2 2010 status report (diff)
- 12:25 SpiralTwo edited by
- (diff)
- 10:44 DavisSocialLinks(DSL) edited by
- (diff)
- 09:22 Milestone ORBIT: S2.b Extend OMF for experiments with multiple testbeds completed
- Extend OMF interfaces and software to support experiments which …
- 09:17 ExptsSecurityAnalysis edited by
- (diff)
- 09:14 ExptsSecurityAnalysis edited by
- (diff)
- 01:35 OpportunisticWirelessNets edited by
- (diff)
- 01:00 SiteNlr edited by
- removed extraneous X.5.46.0/24 subnet specifier (diff)
- 00:59 SiteNlr edited by
- added Clemson and Georgia tech VLANs (diff)
- 00:58 SiteWashington edited by
- minor tweaks to bring inline with SIteIntern2 and SiteNlr being main … (diff)
- 00:54 SiteGeorgiaTech edited by
- migrated NLR VLAN info to SiteNlr. Added VLAN to Clemson. (diff)
- 00:45 SiteNlr edited by
- udated info from Indiana's and Clemson's NLR pages (diff)
- 00:45 SiteClemson edited by
- migrated NLR VLAN info to SiteNlr (diff)
- 00:38 SiteIndiana edited by
- migrated NLR VLAN info to SiteNlr (diff)
- 00:36 SiteWisconsin edited by
- condensed VLAN table and migrated NLR info to SiteNlr (diff)
- 00:00 Milestone OppWireless: S2.b completed
- Report on experiences including ease of access of testbed, usability …
08/26/10:
- 23:52 SiteBbn edited by
- fixed broken link (diff)
- 23:51 SiteBbn edited by
- added local VLAN range table (diff)
- 23:41 SiteStanford edited by
- fixed broken link (diff)
- 23:38 SiteStanford edited by
- Mved NLR Vlans' details to SiteNlr page (diff)
- 21:48 SiteBbn edited by
- migrated host trachin for NLR to SiteNlr (diff)
- 21:47 SiteNlr edited by
- migrated SiteBbn NLR host info to SiteNlr (diff)
- 21:01 SiteNlr edited by
- added vlan3705 info and table headers for other multipoint VLANs (diff)
- 20:36 SiteNlr edited by
- cleaned up NLR FrameNet VLAN table, prepared links for VLAN details section (diff)
- 17:43 Milestone WIMXNYUPT: S2.a Complete Installation completed
- 17:33 SecureUpdates edited by
- (diff)
- 17:28 TIED edited by
- (diff)
- 17:27 TIED edited by
- (diff)
- 17:18 TIED edited by
- (diff)
- 17:15 TIED edited by
- Add QSR (diff)
- 16:32 TIED edited by
- Update and remove Spiral 1 milestones from page. Spiral 1 milestones … (diff)
- 16:28 Ticket #192 (Demonstrate VLAN connectivity to/from TIED testbeds.) closed by
- fixed: Further work not documented, but ISI/DETER VLANS were sufficient for …
- 16:24 Ticket #153 (Explain what GENI content will be incuded in the teacher education ...) closed by
- wontfix: No further information was ever recieved on this ticket.
- 16:22 Ticket #191 (Verify that users are able to access DETER resources to run TIED ...) closed by
- fixed: BBN staff were able to get access to TIED and use tools to set up …
- 15:55 Ticket #518 (Milestone review completed) closed by
- fixed
- 15:42 Ticket #513 (Design Document released (13 Aug 2010)) closed by
- fixed
- 14:21 PlanetLab edited by
- (diff)
- 14:20 Ticket #511 (Demo given) closed by
- fixed
- 14:18 ProtoGENI edited by
- (diff)
- 14:15 Ticket #510 (Completed design spec) closed by
- fixed
- 14:12 OpticalAccessNets edited by
- (diff)
- 13:58 Embedded Real-Time Measurements edited by
- (diff)
- 13:55 ORCABEN edited by
- (diff)
- 13:52 ORCABEN edited by
- (diff)
- 11:15 BGPMux edited by
- (diff)
- 11:07 BGPMux edited by
- (diff)
- 10:56 BGPMux edited by
- (diff)
- 10:54 BGPMux edited by
- (diff)
- 10:53 BGPMux edited by
- (diff)
- 10:53 BGPMux edited by
- (diff)
- 10:13 OFIU edited by
- Addes Spiral2 Review Slides (diff)
- 00:00 Milestone OFSTAN: S2.c Upgrade FlowVisor and Aggregate Manager completed
- Upgrade and maintain FlowVisor, Aggregate Manager and deployment tools.
08/25/10:
- 21:48 AttributionForGENI edited by
- (diff)
- 21:42 Ticket #519 (Milestone 1 completed) created by
- The outline for the report has been delivered to the GPO and posted to …
- 20:57 AttributionForGENI edited by
- (diff)
- 20:35 AttributionForGENI edited by
- (diff)
- 17:31 Milestone TIED: S2.e review S2.f milestone and revise if necessary completed
- Project Management milestone, review milestone [[MilestoneDate(TIED: …
- 17:31 Ticket #518 (Milestone review completed) created by
- Hi, TIED had a milestone S2E: Review S2.f milestone and revise if …
- 16:31 COGRADIO edited by
- (diff)
- 15:06 KanseiSensorNet edited by
- (diff)
- 14:42 SiteNlr edited by
- update Wisconsin's endpoint (diff)
- 14:32 SiteNlr edited by
- minor cosmetic updates (diff)
- 14:31 SiteNlr edited by
- updated VLAN table with current status (diff)
- 14:06 OFSTAN edited by
- (diff)
- 13:33 IGENI edited by
- (diff)
- 13:32 IGENI edited by
- (diff)
- 13:31 IGENI edited by
- (diff)
- 13:30 IGENI edited by
- (diff)
- 13:30 IGENI edited by
- (diff)
- 13:27 DOME edited by
- (diff)
- 11:04 COGRADIO edited by
- (diff)
- 10:55 CRON-2Q10-status edited by
- (diff)
- 10:53 CRON-2Q10-status edited by
- (diff)
- 10:45 CRON-2Q10-status edited by
- (diff)
- 10:45 CRON-2Q10-status edited by
- (diff)
- 10:45 CRON-2Q10-status edited by
- (diff)
- 10:44 CRON-2Q10-status edited by
- (diff)
- 10:41 CRON-2Q10-status edited by
- (diff)
- 10:40 CRON-2Q10-status edited by
- (diff)
- 10:40 CRON-2Q10-status edited by
- (diff)
- 10:39 ClusterD edited by
- (diff)
- 10:36 ORCABEN edited by
- removed old stuff complaining about RENCI CA (diff)
- 10:34 CRON-2Q10-status edited by
- (diff)
- 10:31 CRON-2Q10-status edited by
- (diff)
- 10:29 CRON-2Q10-status edited by
- (diff)
- 09:47 MPRADIO edited by
- (diff)
- 08:42 OnTime-Installv1 edited by
- (diff)
- 05:50 OnTimeMeasure edited by
- (diff)
- 00:00 Milestone OFNLR: S2.d Engineer and test regional network connections completed
- Engineer and test regional network connections to FrameNet for the …
08/24/10:
- 23:24 InfoSubstrate edited by
- (diff)
- 23:11 InfoSubstrate edited by
- (diff)
- 23:08 InfoSubstrate edited by
- (diff)
- 23:07 InfoSubstrate edited by
- (diff)
- 23:02 InfoSubstrate edited by
- (diff)
- 23:01 InfoSubstrate edited by
- (diff)
- 23:00 InfoSubstrate edited by
- (diff)
- 22:59 InfoSubstrate edited by
- (diff)
- 22:25 CRON-2Q10-status edited by
- (diff)
- 22:24 CRON-2Q10-status edited by
- (diff)
- 22:21 OFNLR-2010Q1-status created by
- 22:16 CRON edited by
- (diff)
- 22:11 CRON-2Q10-status edited by
- (diff)
- 22:09 CRON-2Q10-status edited by
- (diff)
- 22:04 CRON-2Q10-status edited by
- (diff)
- 21:04 Ticket #517 (Milestone IMF: S2.h completion) closed by
- fixed
- 21:03 Ticket #517 (Milestone IMF: S2.h completion) created by
- We have updated the IMF software to the point of the GEC8 demo, which …
- 20:59 Ticket #516 (Milestone S2.c completion) closed by
- fixed
- 20:59 Ticket #516 (Milestone S2.c completion) created by
- We have completed our architecture by finalizing some of the …
- 20:54 Ticket #515 (Milestone IMF: S2.g completion) closed by
- fixed
- 20:53 Ticket #515 (Milestone IMF: S2.g completion) created by
- We have finalized on XMPP as the protocol to allow measurement …
- 20:48 Ticket #514 (Milestone IMF S2.b completion) closed by
- fixed
- 20:45 Ticket #514 (Milestone IMF S2.b completion) created by
- Based on the overall direction and progress of the project, we have …
- 20:34 CRON-2Q10-status edited by
- (diff)
- 20:34 IMF edited by
- (diff)
- 20:31 CRON-2Q10-status edited by
- (diff)
- 20:26 CRON-2Q10-status edited by
- (diff)
- 20:23 CRON-2Q10-status edited by
- (diff)
- 20:23 IMF edited by
- (diff)
- 20:19 CRON-2Q10-status edited by
- (diff)
- 20:17 CRON-2Q10-status edited by
- (diff)
- 20:16 CRON-2Q10-status created by
- 19:54 CRON edited by
- (diff)
- 19:52 CRON edited by
- (diff)
- 19:45 CRON edited by
- (diff)
- 19:37 CRON edited by
- (diff)
- 19:34 CRON edited by
- (diff)
- 19:29 CRON edited by
- (diff)
- 19:24 CRON edited by
- (diff)
- 16:34 SiteNlr edited by
- (diff)
- 15:23 Milestone IMF: S2.h Update the IMF software completed
- Update the IMF software to v0.5, and integrate with both SILO and UMF …
- 15:22 Milestone IMF: S2.g Protocol between SILO and IMF completed
- Define and document the protocol to communicate …
- 12:35 SiteClemson edited by
- added Clemson's in-use VLANs (diff)
- 12:30 ProgrammableEdgeNode edited by
- (diff)
- 12:28 ProgrammableEdgeNode edited by
- (diff)
- 12:27 ProgrammableEdgeNode edited by
- (diff)
- 12:26 ProgrammableEdgeNode edited by
- add Spiral 2 review ppt (diff)
- 10:27 LEARN edited by
- (diff)
08/23/10:
- 15:39 GAPI_AM_API edited by
- (diff)
- 15:33 GAPI_AM_API edited by
- (diff)
- 14:35 Ticket #505 (iGENI POC to GENI security team) closed by
- fixed
- 14:34 Ticket #504 (iGENI POC to GENI response team) closed by
- fixed
- 14:33 Ticket #508 (Control of iGENI via ORCA to GENI users) closed by
- fixed
- 14:32 Ticket #507 (Demo VLAN connections including other research communities) closed by
- fixed
- 14:31 Ticket #506 (Demo VLAN connections between GENI aggregates) closed by
- fixed
- 14:30 Ticket #459 (IGENI Dynamic Provisioning) closed by
- fixed
- 09:51 GeniApiCredentials edited by
- (diff)
08/20/10:
- 22:26 InterMapTxt edited by
- added geni specific prefixes per gst 841. Also bolded that these … (diff)
- 21:49 SiteStanford edited by
- added Stanford's IP schema. (diff)
- 16:40 CompSec-QSR-2Q2010 created by
- 16:20 ComprehensiveSecurityPgm edited by
- (diff)
- 16:20 ComprehensiveSecurityPgm edited by
- (diff)
- 14:36 SiteWisconsin edited by
- (diff)
- 13:51 Milestone KANSEI: S2.g Import extended ORCA v2.1 completed
- Import updated ORCA GENI-compliant control framework software provided …
- 12:14 Ticket #513 (Design Document released (13 Aug 2010)) created by
- This …
- 12:09 Ticket #512 (Software release completed (30 Jun 20910)) created by
- The software is at …
- 12:06 Ticket #511 (Demo given) created by
- Full information on the demo is on the [wiki:GEC7DemoSummary#TIED GEC7 …
- 12:00 Ticket #510 (Completed design spec) created by
- design spec posted 3 Feb 2010. See attached e-mail.
08/19/10:
- 16:57 HiveMind edited by
- (diff)
- 16:48 HiveMind edited by
- (diff)
- 14:35 Milestone IGENI: S2.h POC to GENI security team completed
- Provide POC to Security team and provide input for security review in …
- 14:34 Milestone IGENI: S2.g POC to GENI response team completed
- Provide POC to GENI Prototype Response and Escalation team. (7/1/10)
- 12:32 Ticket #509 (Explore dynamic L1 connections) created by
- Explore dynamic L1 connections Completed in June
- 11:24 Ticket #508 (Control of iGENI via ORCA to GENI users) created by
- Completed Jun 2010 Demo at GEC 8
- 11:23 Ticket #507 (Demo VLAN connections including other research communities) created by
- Demo VLAN connections including other research communities Completed …
- 11:21 Ticket #506 (Demo VLAN connections between GENI aggregates) created by
- Demo VLAN connections between GENI aggregates Completed June 2010, …
- 11:19 Ticket #505 (iGENI POC to GENI security team) created by
- iGENI POC to GENI security team The POC is jim Chen …
- 11:16 Ticket #504 (iGENI POC to GENI response team) created by
- POC to GENI response team The POC is Jim Chen jim-chen@northwesten.edu
- 11:01 SiteWisconsin edited by
- fixes SiteBBN to be SiteBbn (diff)
- 11:01 SiteWisconsin edited by
- added 10.37.13.101 host on VLAN 913's MAC address (diff)
- 09:54 SiteWisconsin edited by
- added link to Wisconsin's GENI conenctions wiki page (diff)
08/18/10:
- 17:31 OTM-PlanetLabInstall edited by
- (diff)
- 17:25 OnTime-Installv1 edited by
- (diff)
- 16:56 OnTime-Installv1 edited by
- (diff)
- 15:02 Milestone InfoSubstrate: S2.a V1.0 Information plane system design issues completed
- Deliver a document that examines system design issues important for …
- 13:27 ConnectivityHome edited by
- added initial IP range table (diff)
- 10:41 SiteGeorgiaTech edited by
- (diff)
- 10:29 ConnectivityTesting edited by
- (diff)
Note: See TracTimeline
for information about the timeline view.