Timeline
08/30/10:
- 17:32 Quilt edited by
- (diff)
- 17:28 Ticket #529 (open registration and accept travel requests) closed by
- fixed
- 17:28 Ticket #529 (open registration and accept travel requests) created by
- All forms were prepared in advance and workshop was announced June 3, …
- 17:10 Ticket #527 (Close travel request submission.) closed by
- fixed
- 17:06 Ticket #528 (Close Quilt workshop registration) closed by
- fixed
- 17:06 Ticket #528 (Close Quilt workshop registration) created by
- The workshop was announced and registration opened via the URL below: …
- 17:03 Ticket #527 (Close travel request submission.) created by
- Travel requests closed June 25, 2010 as documented at this URL: …
- 16:58 Ticket #526 (Publish and review agenda) closed by
- fixed
- 16:57 Ticket #526 (Publish and review agenda) created by
- Draft Agenda version 1.4 was reviewed at 4/15 program committee …
- 16:46 Ticket #525 (OFGT: S2.f Upgrade small deployments to use OF 1.0) created by
- Upgrade small deployments to use OpenFlow 1.0 implementations and GENI …
- 16:42 Ticket #524 (Campus small deployment completed on-time) created by
- The campus small deployment was completed during Q1 2010 with six …
- 16:38 Ticket #523 (Equipment selection completed on-time) created by
- The original equipment evaluation took place during Q4 2009 and Q1 …
- 16:37 GeniApi edited by
- (diff)
- 16:31 Ticket #522 (Create workshop committee and meet regularly to plan workshop.) closed by
- fixed
- 16:30 Ticket #522 (Create workshop committee and meet regularly to plan workshop.) created by
- Workshop Committe was formed in January 2010. First meeting was …
- 16:18 Quilt edited by
- (diff)
- 16:08 GEC8DemoSummary edited by
- Added link to UWisc OpenFlow demo poster (diff)
- 15:54 GeniAggregateManagerApiDoc edited by
- (diff)
- 15:47 GpoDoc edited by
- (diff)
- 15:32 OFGT edited by
- (diff)
- 15:11 Ticket #462 (Demo request for UMLPEN) closed by
- fixed
- 14:59 Ticket #461 (Expedient Demo (OFSTAN-EXP)) closed by
- fixed
- 14:54 Ticket #458 (U Wisc OpenFlow demo) closed by
- fixed
- 14:43 GEC8DemoSummary edited by
- Add demo summary from Gember (diff)
- 14:41 GpoDoc edited by
- (diff)
- 14:25 GEC8DemoSummary edited by
- Delete directions for making additions--pages should be done now. (diff)
- 14:22 Gec8Agenda edited by
- Add link to posters and descriptions (diff)
- 13:16 GeniAggregateManagerApiDoc edited by
- (diff)
- 13:12 GeniAggregateManagerApiDoc created by
- 12:54 TIED edited by
- Added S2 review slides (diff)
- 10:58 TIEDQ22010 created by
- 10:57 TIED edited by
- add link for Q2 2010 QSR (diff)
- 10:34 Ticket #521 (Design GENI Aggregate Manager software components for Shadownet.) created by
- The team has also discussed GENI's use of the Juniper SDK for …
- 10:16 Ticket #520 (Specify and purchase 4 Juniper routers.) created by
- The ShadowNet team has specified the Juniper hardware and software …
- 08:29 ConnectivityHome edited by
- added /24 to host IP's to help clarify that they are not /28 subnets (diff)
- 08:28 ConnectivityHome edited by
- aded links to site pages in IP range table (diff)
- 08:25 ConnectivityHome edited by
- adapting ranges to account for Wisconsins IP address with Stanford's … (diff)
08/29/10:
- 23:49 PrimoGENI edited by
- (diff)
- 23:48 PrimoGENI edited by
- (diff)
- 18:48 PrimoGENI edited by
- (diff)
- 18:47 PrimoGENI edited by
- (diff)
- 18:34 PrimoGENI edited by
- (diff)
- 13:30 PrimoGENIStatusReport2010Q2 edited by
- (diff)
- 13:21 PrimoGENIStatusReport2010Q2 created by
- 12:33 PrimoGENI edited by
- (diff)
08/28/10:
- 23:00 LEFA edited by
- (diff)
- 15:45 GENISecurity-4Q09-status edited by
- (diff)
- 15:45 GENISecurity-4Q09-status created by
- 15:01 GENISecurity-1Q10-status edited by
- (diff)
- 15:00 GENISecurity-1Q10-status edited by
- (diff)
- 14:59 GENISecurity-1Q10-status created by
- 14:55 GENISecurity-2Q10-status created by
- 14:49 GENISecurity edited by
- (diff)
- 14:27 ABAC-QSR-4Q2009 created by
- 14:24 ABAC edited by
- (diff)
08/27/10:
- 20:56 TIEDFedd30GIR12 edited by
- Add note about 3.01 (diff)
- 19:30 SiteNlr edited by
- removed duplicate VLAN 3712 (diff)
- 17:40 Milestone PGINTEGRN: S2.e Service implementer's guide completed
- Release a guide for projects implementing services in ProtoGENI …
- 16:56 Milestone ORBIT: S2.f Support integration of latest OMF code into cluster testbeds completed
- Support integration of latest OMF code into WiMAX and cognitive radio …
- 16:50 Milestone ORBIT: S2.d Federate cluster testbeds completed
- Work with WiMAX and cognitive radio projects, to integrate their …
- 16:04 TIED edited by
- (diff)
- 15:58 TIEDFedd30GIR12 created by
- 15:49 Ticket #512 (Software release completed (30 Jun 20910)) closed by
- fixed: Thanks for the additional information. Luisa will follow up if she …
- 15:19 SiteWashington edited by
- remoed OptionsIndex and conenctivity links (links are in footer) (diff)
- 15:14 SiteStanford edited by
- (diff)
- 15:13 SiteWisconsin edited by
- (diff)
- 15:11 SiteInternet2 edited by
- added site ION info from site pages (diff)
- 15:10 SiteRutgers edited by
- migrated ION connectivity information to SiteInternet2 (diff)
- 15:07 OFIU edited by
- (diff)
- 14:49 GENIMetaOps edited by
- (diff)
- 14:46 GENIMetaOps edited by
- Added link to q3 (diff)
- 14:42 SiteGeorgiaTech edited by
- removed extra IOn info and extranious Connectivity links (diff)
- 14:39 SiteClemson edited by
- removed extra ION info (diff)
- 14:37 SiteInternet2 edited by
- added ION vlans from BBN (diff)
- 14:35 SiteBbn edited by
- migrated ION info to[" SiteInternet2'] (diff)
- 14:12 IMF edited by
- (diff)
- 13:56 SiteIndiana edited by
- removed IOn VLANtables, cleaned up ION ordering, removed conenctivity … (diff)
- 13:48 SiteNlr edited by
- added wisconsin's PTH on VLAN 3713 (diff)
- 12:41 Shadow edited by
- Add Q2 2010 status report (diff)
- 12:25 SpiralTwo edited by
- (diff)
- 10:44 DavisSocialLinks(DSL) edited by
- (diff)
- 09:22 Milestone ORBIT: S2.b Extend OMF for experiments with multiple testbeds completed
- Extend OMF interfaces and software to support experiments which …
- 09:17 ExptsSecurityAnalysis edited by
- (diff)
- 09:14 ExptsSecurityAnalysis edited by
- (diff)
- 01:35 OpportunisticWirelessNets edited by
- (diff)
- 01:00 SiteNlr edited by
- removed extraneous X.5.46.0/24 subnet specifier (diff)
- 00:59 SiteNlr edited by
- added Clemson and Georgia tech VLANs (diff)
- 00:58 SiteWashington edited by
- minor tweaks to bring inline with SIteIntern2 and SiteNlr being main … (diff)
- 00:54 SiteGeorgiaTech edited by
- migrated NLR VLAN info to SiteNlr. Added VLAN to Clemson. (diff)
- 00:45 SiteNlr edited by
- udated info from Indiana's and Clemson's NLR pages (diff)
- 00:45 SiteClemson edited by
- migrated NLR VLAN info to SiteNlr (diff)
- 00:38 SiteIndiana edited by
- migrated NLR VLAN info to SiteNlr (diff)
- 00:36 SiteWisconsin edited by
- condensed VLAN table and migrated NLR info to SiteNlr (diff)
- 00:00 Milestone OppWireless: S2.b completed
- Report on experiences including ease of access of testbed, usability …
08/26/10:
- 23:52 SiteBbn edited by
- fixed broken link (diff)
- 23:51 SiteBbn edited by
- added local VLAN range table (diff)
- 23:41 SiteStanford edited by
- fixed broken link (diff)
- 23:38 SiteStanford edited by
- Mved NLR Vlans' details to SiteNlr page (diff)
- 21:48 SiteBbn edited by
- migrated host trachin for NLR to SiteNlr (diff)
- 21:47 SiteNlr edited by
- migrated SiteBbn NLR host info to SiteNlr (diff)
- 21:01 SiteNlr edited by
- added vlan3705 info and table headers for other multipoint VLANs (diff)
- 20:36 SiteNlr edited by
- cleaned up NLR FrameNet VLAN table, prepared links for VLAN details section (diff)
- 17:43 Milestone WIMXNYUPT: S2.a Complete Installation completed
- 17:33 SecureUpdates edited by
- (diff)
- 17:28 TIED edited by
- (diff)
- 17:27 TIED edited by
- (diff)
- 17:18 TIED edited by
- (diff)
- 17:15 TIED edited by
- Add QSR (diff)
- 16:32 TIED edited by
- Update and remove Spiral 1 milestones from page. Spiral 1 milestones … (diff)
- 16:28 Ticket #192 (Demonstrate VLAN connectivity to/from TIED testbeds.) closed by
- fixed: Further work not documented, but ISI/DETER VLANS were sufficient for …
- 16:24 Ticket #153 (Explain what GENI content will be incuded in the teacher education ...) closed by
- wontfix: No further information was ever recieved on this ticket.
- 16:22 Ticket #191 (Verify that users are able to access DETER resources to run TIED ...) closed by
- fixed: BBN staff were able to get access to TIED and use tools to set up …
- 15:55 Ticket #518 (Milestone review completed) closed by
- fixed
- 15:42 Ticket #513 (Design Document released (13 Aug 2010)) closed by
- fixed
- 14:21 PlanetLab edited by
- (diff)
- 14:20 Ticket #511 (Demo given) closed by
- fixed
- 14:18 ProtoGENI edited by
- (diff)
- 14:15 Ticket #510 (Completed design spec) closed by
- fixed
- 14:12 OpticalAccessNets edited by
- (diff)
- 13:58 Embedded Real-Time Measurements edited by
- (diff)
- 13:55 ORCABEN edited by
- (diff)
- 13:52 ORCABEN edited by
- (diff)
- 11:15 BGPMux edited by
- (diff)
- 11:07 BGPMux edited by
- (diff)
- 10:56 BGPMux edited by
- (diff)
- 10:54 BGPMux edited by
- (diff)
- 10:53 BGPMux edited by
- (diff)
- 10:53 BGPMux edited by
- (diff)
- 10:13 OFIU edited by
- Addes Spiral2 Review Slides (diff)
- 00:00 Milestone OFSTAN: S2.c Upgrade FlowVisor and Aggregate Manager completed
- Upgrade and maintain FlowVisor, Aggregate Manager and deployment tools.
08/25/10:
- 21:48 AttributionForGENI edited by
- (diff)
- 21:42 Ticket #519 (Milestone 1 completed) created by
- The outline for the report has been delivered to the GPO and posted to …
- 20:57 AttributionForGENI edited by
- (diff)
- 20:35 AttributionForGENI edited by
- (diff)
- 17:31 Milestone TIED: S2.e review S2.f milestone and revise if necessary completed
- Project Management milestone, review milestone [[MilestoneDate(TIED: …
- 17:31 Ticket #518 (Milestone review completed) created by
- Hi, TIED had a milestone S2E: Review S2.f milestone and revise if …
- 16:31 COGRADIO edited by
- (diff)
- 15:06 KanseiSensorNet edited by
- (diff)
- 14:42 SiteNlr edited by
- update Wisconsin's endpoint (diff)
- 14:32 SiteNlr edited by
- minor cosmetic updates (diff)
- 14:31 SiteNlr edited by
- updated VLAN table with current status (diff)
- 14:06 OFSTAN edited by
- (diff)
- 13:33 IGENI edited by
- (diff)
- 13:32 IGENI edited by
- (diff)
- 13:31 IGENI edited by
- (diff)
- 13:30 IGENI edited by
- (diff)
- 13:30 IGENI edited by
- (diff)
- 13:27 DOME edited by
- (diff)
- 11:04 COGRADIO edited by
- (diff)
- 10:55 CRON-2Q10-status edited by
- (diff)
- 10:53 CRON-2Q10-status edited by
- (diff)
- 10:45 CRON-2Q10-status edited by
- (diff)
- 10:45 CRON-2Q10-status edited by
- (diff)
- 10:45 CRON-2Q10-status edited by
- (diff)
- 10:44 CRON-2Q10-status edited by
- (diff)
- 10:41 CRON-2Q10-status edited by
- (diff)
- 10:40 CRON-2Q10-status edited by
- (diff)
- 10:40 CRON-2Q10-status edited by
- (diff)
- 10:39 ClusterD edited by
- (diff)
- 10:36 ORCABEN edited by
- removed old stuff complaining about RENCI CA (diff)
- 10:34 CRON-2Q10-status edited by
- (diff)
- 10:31 CRON-2Q10-status edited by
- (diff)
- 10:29 CRON-2Q10-status edited by
- (diff)
- 09:47 MPRADIO edited by
- (diff)
- 08:42 OnTime-Installv1 edited by
- (diff)
- 05:50 OnTimeMeasure edited by
- (diff)
- 00:00 Milestone OFNLR: S2.d Engineer and test regional network connections completed
- Engineer and test regional network connections to FrameNet for the …
08/24/10:
- 23:24 InfoSubstrate edited by
- (diff)
- 23:11 InfoSubstrate edited by
- (diff)
- 23:08 InfoSubstrate edited by
- (diff)
- 23:07 InfoSubstrate edited by
- (diff)
- 23:02 InfoSubstrate edited by
- (diff)
- 23:01 InfoSubstrate edited by
- (diff)
- 23:00 InfoSubstrate edited by
- (diff)
- 22:59 InfoSubstrate edited by
- (diff)
- 22:25 CRON-2Q10-status edited by
- (diff)
- 22:24 CRON-2Q10-status edited by
- (diff)
- 22:21 OFNLR-2010Q1-status created by
- 22:16 CRON edited by
- (diff)
- 22:11 CRON-2Q10-status edited by
- (diff)
- 22:09 CRON-2Q10-status edited by
- (diff)
- 22:04 CRON-2Q10-status edited by
- (diff)
- 21:04 Ticket #517 (Milestone IMF: S2.h completion) closed by
- fixed
- 21:03 Ticket #517 (Milestone IMF: S2.h completion) created by
- We have updated the IMF software to the point of the GEC8 demo, which …
- 20:59 Ticket #516 (Milestone S2.c completion) closed by
- fixed
- 20:59 Ticket #516 (Milestone S2.c completion) created by
- We have completed our architecture by finalizing some of the …
- 20:54 Ticket #515 (Milestone IMF: S2.g completion) closed by
- fixed
- 20:53 Ticket #515 (Milestone IMF: S2.g completion) created by
- We have finalized on XMPP as the protocol to allow measurement …
- 20:48 Ticket #514 (Milestone IMF S2.b completion) closed by
- fixed
- 20:45 Ticket #514 (Milestone IMF S2.b completion) created by
- Based on the overall direction and progress of the project, we have …
- 20:34 CRON-2Q10-status edited by
- (diff)
- 20:34 IMF edited by
- (diff)
- 20:31 CRON-2Q10-status edited by
- (diff)
- 20:26 CRON-2Q10-status edited by
- (diff)
- 20:23 CRON-2Q10-status edited by
- (diff)
- 20:23 IMF edited by
- (diff)
- 20:19 CRON-2Q10-status edited by
- (diff)
- 20:17 CRON-2Q10-status edited by
- (diff)
- 20:16 CRON-2Q10-status created by
- 19:54 CRON edited by
- (diff)
- 19:52 CRON edited by
- (diff)
- 19:45 CRON edited by
- (diff)
- 19:37 CRON edited by
- (diff)
- 19:34 CRON edited by
- (diff)
- 19:29 CRON edited by
- (diff)
- 19:24 CRON edited by
- (diff)
- 16:34 SiteNlr edited by
- (diff)
- 15:23 Milestone IMF: S2.h Update the IMF software completed
- Update the IMF software to v0.5, and integrate with both SILO and UMF …
- 15:22 Milestone IMF: S2.g Protocol between SILO and IMF completed
- Define and document the protocol to communicate …
- 12:35 SiteClemson edited by
- added Clemson's in-use VLANs (diff)
- 12:30 ProgrammableEdgeNode edited by
- (diff)
- 12:28 ProgrammableEdgeNode edited by
- (diff)
- 12:27 ProgrammableEdgeNode edited by
- (diff)
- 12:26 ProgrammableEdgeNode edited by
- add Spiral 2 review ppt (diff)
- 10:27 LEARN edited by
- (diff)
08/23/10:
- 15:39 GAPI_AM_API edited by
- (diff)
- 15:33 GAPI_AM_API edited by
- (diff)
- 14:35 Ticket #505 (iGENI POC to GENI security team) closed by
- fixed
- 14:34 Ticket #504 (iGENI POC to GENI response team) closed by
- fixed
- 14:33 Ticket #508 (Control of iGENI via ORCA to GENI users) closed by
- fixed
- 14:32 Ticket #507 (Demo VLAN connections including other research communities) closed by
- fixed
- 14:31 Ticket #506 (Demo VLAN connections between GENI aggregates) closed by
- fixed
- 14:30 Ticket #459 (IGENI Dynamic Provisioning) closed by
- fixed
- 09:51 GeniApiCredentials edited by
- (diff)
08/20/10:
- 22:26 InterMapTxt edited by
- added geni specific prefixes per gst 841. Also bolded that these … (diff)
- 21:49 SiteStanford edited by
- added Stanford's IP schema. (diff)
- 16:40 CompSec-QSR-2Q2010 created by
- 16:20 ComprehensiveSecurityPgm edited by
- (diff)
- 16:20 ComprehensiveSecurityPgm edited by
- (diff)
- 14:36 SiteWisconsin edited by
- (diff)
- 13:51 Milestone KANSEI: S2.g Import extended ORCA v2.1 completed
- Import updated ORCA GENI-compliant control framework software provided …
- 12:14 Ticket #513 (Design Document released (13 Aug 2010)) created by
- This …
- 12:09 Ticket #512 (Software release completed (30 Jun 20910)) created by
- The software is at …
- 12:06 Ticket #511 (Demo given) created by
- Full information on the demo is on the [wiki:GEC7DemoSummary#TIED GEC7 …
- 12:00 Ticket #510 (Completed design spec) created by
- design spec posted 3 Feb 2010. See attached e-mail.
08/19/10:
- 16:57 HiveMind edited by
- (diff)
- 16:48 HiveMind edited by
- (diff)
- 14:35 Milestone IGENI: S2.h POC to GENI security team completed
- Provide POC to Security team and provide input for security review in …
- 14:34 Milestone IGENI: S2.g POC to GENI response team completed
- Provide POC to GENI Prototype Response and Escalation team. (7/1/10)
- 12:32 Ticket #509 (Explore dynamic L1 connections) created by
- Explore dynamic L1 connections Completed in June
- 11:24 Ticket #508 (Control of iGENI via ORCA to GENI users) created by
- Completed Jun 2010 Demo at GEC 8
- 11:23 Ticket #507 (Demo VLAN connections including other research communities) created by
- Demo VLAN connections including other research communities Completed …
- 11:21 Ticket #506 (Demo VLAN connections between GENI aggregates) created by
- Demo VLAN connections between GENI aggregates Completed June 2010, …
- 11:19 Ticket #505 (iGENI POC to GENI security team) created by
- iGENI POC to GENI security team The POC is jim Chen …
- 11:16 Ticket #504 (iGENI POC to GENI response team) created by
- POC to GENI response team The POC is Jim Chen jim-chen@northwesten.edu
- 11:01 SiteWisconsin edited by
- fixes SiteBBN to be SiteBbn (diff)
- 11:01 SiteWisconsin edited by
- added 10.37.13.101 host on VLAN 913's MAC address (diff)
- 09:54 SiteWisconsin edited by
- added link to Wisconsin's GENI conenctions wiki page (diff)
08/18/10:
- 17:31 OTM-PlanetLabInstall edited by
- (diff)
- 17:25 OnTime-Installv1 edited by
- (diff)
- 16:56 OnTime-Installv1 edited by
- (diff)
- 15:02 Milestone InfoSubstrate: S2.a V1.0 Information plane system design issues completed
- Deliver a document that examines system design issues important for …
- 13:27 ConnectivityHome edited by
- added initial IP range table (diff)
- 10:41 SiteGeorgiaTech edited by
- (diff)
- 10:29 ConnectivityTesting edited by
- (diff)
08/17/10:
- 14:39 GeniApiCertificates edited by
- tied some links back up (diff)
- 13:23 SiteWisconsin edited by
- updateed VLAN info for Wisconsin (diff)
- 13:12 OnTime-Installv1 edited by
- (diff)
08/16/10:
- 17:12 GeniApi edited by
- (diff)
- 17:10 GeniApiCredentials created by
- 14:52 SiteBbn edited by
- updated VLAN table (diff)
- 14:35 SiteStanford edited by
- added VLAN 3705 status (diff)
08/15/10:
- 18:30 SCAFFOLD edited by
- (diff)
- 18:28 SCAFFOLD edited by
- (diff)
- 17:59 UMLPEN-QSR-2Q2010 edited by
- (diff)
- 17:29 ProgrammableEdgeNode edited by
- (diff)
- 16:22 UMLPEN-QSR-2Q2010 edited by
- (diff)
- 12:40 UMLPEN-QSR-2Q2010 edited by
- (diff)
- 12:39 UMLPEN-QSR-2Q2010 edited by
- (diff)
- 12:32 UMLPEN-QSR-2Q2010 edited by
- (diff)
- 12:31 UMLPEN-QSR-2Q2010 edited by
- (diff)
- 12:30 UMLPEN-QSR-2Q2010 edited by
- (diff)
- 12:26 UMLPEN-QSR-2Q2010 edited by
- (diff)
- 12:09 UMLPEN-QSR-2Q2010 edited by
- (diff)
- 12:02 UMLPEN-QSR-2Q2010 edited by
- (diff)
- 11:15 ProgrammableEdgeNode edited by
- (diff)
- 11:15 UMLPEN-QSR-2Q2010 created by
- 11:14 ProgrammableEdgeNode edited by
- (diff)
08/13/10:
- 19:16 GeniApi edited by
- (diff)
- 19:09 GeniApiCertificates created by
- 19:07 GeniApi edited by
- (diff)
- 19:06 GeniApiIdentifiers created by
- 18:57 GAPI_AM_API edited by
- (diff)
- 18:08 TIED edited by
- (diff)
- 17:14 OTM-PlanetLabInstall edited by
- (diff)
- 17:08 OnTime-Installv1 edited by
- (diff)
- 16:58 OnTimeMeasure edited by
- (diff)
- 16:55 OnTimeMeasure edited by
- (diff)
- 16:52 OnTimeMeasure edited by
- (diff)
- 16:51 ExperienceWithProtoGENI edited by
- (diff)
- 16:24 OTM-PlanetLabInstall edited by
- (diff)
- 16:24 OTM-PlanetLabInstall created by
- 16:23 ExperienceWithProtoGENI edited by
- (diff)
- 16:22 ExperienceWithProtoGENI edited by
- (diff)
- 16:21 ExperienceWithProtoGENI edited by
- (diff)
- 16:16 ExperienceWithProtoGENI created by
- 16:08 OnTimeMeasure edited by
- (diff)
- 16:08 OnTimeMeasure edited by
- (diff)
- 15:42 Milestone TIED: S2.d Preliminary design document for Unified/SFA (GENIAPI) plugin completed
- Preliminary design document for Unified/SFA (GENIAPI) plugin * …
- 14:31 OnTimeMeasure edited by
- (diff)
- 14:29 OnTimeMeasure edited by
- (diff)
- 14:24 OnTimeMeasure edited by
- (diff)
- 13:52 Milestone DICLOUD: S2.h Release initial proxy aggregate manager completed
- Finish and release an initial version of the proxy aggregate manager …
- 12:46 OnTime-Installv1 edited by
- (diff)
- 12:26 SCAFFOLD edited by
- (diff)
- 12:21 SCAFFOLD edited by
- (diff)
- 12:03 SCAFFOLD edited by
- (diff)
- 12:02 SCAFFOLD edited by
- (diff)
- 11:21 Milestone OnTime: S2.f: Report on experiences completed
- Report on experiences with implementing and using OnTimeMeasure on …
- 00:53 Ticket #503 (Milestone S2.h completion) closed by
- fixed: Files uploaded in this ticket and also on DICloud wiki
- 00:50 Ticket #503 (Milestone S2.h completion) created by
- Code of the current proxy aggregate manager used for the GEC 8 demo.
08/12/10:
- 11:45 OKGEMS edited by
- (diff)
- 11:44 OKGEMS edited by
- (diff)
- 11:42 OKGEMS edited by
- (diff)
- 11:39 OKGEMS edited by
- (diff)
08/11/10:
- 18:23 Ticket #502 (milestone S2.g completion) created by
- We've integrated the latest ORCA and extended it with fine-grained …
- 18:22 Ticket #501 (milestone S2.f completion) created by
- the connection is tested to the campus edge
- 18:18 KanseiSensorNet edited by
- (diff)
- 18:16 KanseiSensorNet edited by
- (diff)
- 17:04 OnTime-Installv1 edited by
- (diff)
- 16:24 CNRI-QSR-Q2-2010 created by
- 16:15 DigitalObjectRegistry edited by
- (diff)
- 06:36 Ticket #500 (ProtoGENI node documentation pages need updating to reflect switchover ...) created by
- There are several pages of detailed ProtoGENI node documentation …
08/10/10:
- 15:18 I2PoPSALT edited by
- (diff)
- 15:04 I2PoPKANS edited by
- (diff)
- 15:00 I2PoPWASH edited by
- (diff)
- 13:30 OnTime-Installv1 edited by
- (diff)
- 11:14 WIMXUCO edited by
- (diff)
- 10:16 Milestone ERM: S2.f Plan to integrate UMF within anpther infrastructures completed
- Work with other GENI clusters (outside of Cluster D) and/or other …
- 10:13 Milestone ERM: S2.e Design and demo XML data exchange software modules completed
- Design the XML data exchange software modules for the UMF to interact …
- 10:12 Milestone ERM: S2.d Integrate UMF with BEN completed
- Contribute to the Cluster D effort by integrating the UMF subsystem …
08/09/10:
- 22:01 VMI-FED edited by
- (diff)
- 15:57 OnTime-Installv1 edited by
- (diff)
- 14:08 OnTime-Installv1 edited by
- (diff)
- 10:54 GEC8DemoSummary edited by
- (diff)
- 08:23 Ticket #497 (Need mailing list for gush-users.) closed by
- invalid: Replaced by GST 1082
08/06/10:
- 17:07 ConnectivityOptions edited by
- WWisconsin has successfully connected to Stanford, NLR is now UP (diff)
- 16:49 SiteGeorgiaTech edited by
- (diff)
- 16:49 SiteGeorgiaTech edited by
- ping test host on VLAN 3712 is down for maintence see #1079 (diff)
- 16:04 SiteNlr edited by
- updated VLAN table for Wisconsin to stanford VLAN 3700 (diff)
- 15:45 SiteWisconsin edited by
- added link to VLAN 911 section (diff)
- 15:41 SiteWisconsin edited by
- added link to NLR vlan status for VLAN 3700 (diff)
- 15:40 SiteWisconsin edited by
- fixed VLAN 3700 subnet information, added anchor link from table to … (diff)
- 15:39 SiteStanford edited by
- Updated NLR link to VLAN 3700 status, added vlan host (diff)
- 15:37 SiteStanford edited by
- Stanford now has a connection to Wisconsin! (diff)
- 15:35 SiteWisconsin edited by
- WIsconsin has their connection with Stanford working over NLR (diff)
- 13:47 PersistentTestHostRequirments edited by
- fixed typo (diff)
- 13:46 PersistentTestHostRequirments created by
- initial cut of Persitant test host requirments.
- 13:44 ConnectivityTesting edited by
- added link to PTH requirments page (for sending to campuses) (diff)
- 12:25 SiteWisconsin edited by
- the new endpoint is also through the cic omnipop (diff)
- 12:24 SiteWisconsin edited by
- added another possible endpoint (diff)
- 10:14 DICLOUD edited by
- (diff)
- 10:14 DICLOUD edited by
- (diff)
- 10:12 ViSE edited by
- (diff)
- 10:07 Ticket #495 (S2.n POC to GENI response team) closed by
- fixed
- 00:00 Milestone OFSTAN: S2.b Support campuses completed
- Support Campus Instillation of OpenFlow 1.0
- 00:00 Milestone OFGT: S2.f Upgrade small deployments to use OF 1.0 completed
- Upgrade small deployments to use OpenFlow 1.0 implementations and GENI …
08/05/10:
- 18:25 PGTools edited by
- (diff)
- 18:24 PGAugmentation edited by
- (diff)
- 18:23 Proto-GENI-2Q10-status edited by
- (diff)
- 18:06 Proto-GENI-2Q10-status edited by
- (diff)
- 18:01 Proto-GENI-2Q10-status created by
- 17:56 ProtoGENI edited by
- (diff)
- 17:54 Milestone OKGEMS: S2.d Integrate field sensor nodes completed
- Integrate a set of field-deployed sensor nodes into GENI, connected …
- 17:28 Ticket #499 (Milestone S2.e Completion) created by
- We have completed a detailed plan for integrating robots into the ORCA …
- 17:22 Ticket #498 (Milestone S2.d Completion) created by
- We have completed the integration of a field sensor network of 10 …
- 15:53 GIMSDocumentation edited by
- (diff)
- 15:45 GIMSDocumentation created by
- 15:38 MeasurementSystem edited by
- (diff)
- 15:12 ABAC-QSR-2Q2010 created by
- 15:09 ABAC edited by
- (diff)
- 14:25 MeasSys-JulyQSR edited by
- (diff)
- 14:14 MeasSys-JulyQSR created by
- 12:50 MeasurementSystem edited by
- (diff)
- 12:44 GushProto edited by
- (diff)
- 12:38 Ticket #497 (Need mailing list for gush-users.) created by
- Jeannie Albrecht (PI of Gush project) has requested a mailing list for …
- 12:27 ABAC edited by
- (diff)
- 11:38 Mid-Atlantic Crossroads edited by
- (diff)
08/04/10:
- 18:07 Mid-Atlantic Crossroads-4Q10-status edited by
- (diff)
- 18:05 Mid-Atlantic Crossroads-4Q10-status created by
- 18:04 Mid-Atlantic Crossroads edited by
- (diff)
- 17:58 Mid-Atlantic Crossroads-2Q10-status created by
- 15:59 PLfed edited by
- (diff)
- 15:57 PlanetLab-2Q10-status created by
- 15:51 PlanetLab edited by
- (diff)
- 15:31 IGENI edited by
- (diff)
- 14:52 Ticket #496 (S2.o POC to GENI Security Team) created by
- David Irwin is the POC for ViSE to the GENI Security Team. The ViSE …
- 14:50 Ticket #495 (S2.n POC to GENI response team) created by
- 14:24 Gec8InstMeasWGAgenda edited by
- (diff)
- 14:24 Gec8InstMeasWGAgenda edited by
- (diff)
- 13:19 IGENI edited by
- (diff)
- 13:03 GAPI_AM_API edited by
- (diff)
- 10:47 GAPI_AM_API edited by
- (diff)
- 10:26 ConnectivityOptions edited by
- Wisconsin is discussing using NLR as well. (diff)
- 10:24 SiteWisconsin edited by
- (diff)
- 10:08 Milestone ViSE: S2.o POC to GENI security team completed
- Provide POC to Security team and provide input for security review in …
- 10:08 Milestone ViSE: S2.n POC to GENI response team completed
- Provide POC to GENI Prototype Response and Escalation team. (11/1/09)
- 09:31 netKarma edited by
- (diff)
- 09:30 GeniNewcomers edited by
- added links to connectivity and resource pages (diff)
- 09:28 ConnectivityOptions edited by
- added link to newly created what resources are in geni page. (diff)
- 09:19 netKarma edited by
- (diff)
- 08:17 netKarma edited by
- (diff)
08/03/10:
- 18:44 WhatResourcesAreInGENI edited by
- (diff)
- 18:41 Internet Scale Overlay Hosting edited by
- (diff)
- 16:50 sppReport-2Q10 created by
- 16:40 Internet Scale Overlay Hosting edited by
- (diff)
- 16:33 CmuLab-2Q10-status created by
- 16:25 CmuLab edited by
- (diff)
- 16:22 CmuLab-1Q10-status edited by
- (diff)
- 16:11 CmuLab-1Q10-status created by
- 16:05 CmuLab edited by
- (diff)
- 15:53 CmuLab-4Q09-status edited by
- (diff)
- 15:52 CmuLab-4Q09-status edited by
- (diff)
- 10:52 Ticket #494 (S2.k: Testbed Allocation Policy) closed by
- fixed
- 10:51 Ticket #493 (Milestone S2.j Completion) closed by
- fixed
- 10:50 Ticket #494 (S2.k: Testbed Allocation Policy) created by
- As of the demonstration at GEC8, we have modified the basic policy for …
- 10:48 Ticket #493 (Milestone S2.j Completion) created by
- If needed, update experiment control framework (ECF), based upon …
08/02/10:
- 20:09 GEC8DemoSummary edited by
- (diff)
- 15:17 Milestone MILNGENI: S2.f Clearinghouse API spec. for end-hosts completed
- Specification for Clearinghouse API for end-hosts: A description of …
- 14:55 Ticket #457 (OnTimeMeasure GEC8 Demo Request) closed by
- fixed: Demo complete. Posters and screenshots uploaded to GEC8 demo page. …
- 14:52 Ticket #456 (ORCA-BEN GEC8 ticket) closed by
- fixed: Demo complete and poster file uploaded to wiki. Thanks!
- 14:50 Ticket #454 (Mid-Atlantic Crossroads (MAX) Demo at GEC#8) closed by
- fixed: Due to space limitations, this demo was not conducted at GEC8.
- 14:48 Ticket #453 (S3Monitor Demo at GEC8) closed by
- fixed: Please add your demo materials to …
- 13:43 netKarma edited by
- (diff)
- 13:42 netKarma edited by
- (diff)
- 13:41 netKarma edited by
- (diff)
- 12:49 netKarma-2Q10-status edited by
- (diff)
- 12:48 netKarma-2Q10-status edited by
- (diff)
- 12:48 netKarma-2Q10-status edited by
- (diff)
- 12:47 netKarma-2Q10-status edited by
- (diff)
- 12:47 netKarma-2Q10-status edited by
- (diff)
- 12:45 netKarma-2Q10-status created by
- 12:43 netKarma edited by
- (diff)
- 11:20 Gec8InstMeasWGAgenda edited by
- (diff)
- 11:19 Gec8InstMeasWGAgenda edited by
- (diff)
- 11:18 Gec8InstMeasWGAgenda edited by
- (diff)
- 11:15 Gec8InstMeasWGAgenda edited by
- (diff)
- 11:14 Gec8InstMeasWGAgenda edited by
- (diff)
- 11:11 Gec8InstMeasWGAgenda edited by
- (diff)
- 11:05 Gec8ClusterDAgenda edited by
- (diff)
- 11:01 Gec8ClusterDAgenda edited by
- (diff)
- 11:00 netKarma edited by
- (diff)
- 11:00 Gec8ClusterDAgenda edited by
- (diff)
- 10:59 Gec8ClusterDAgenda edited by
- (diff)
- 10:58 Gec8ClusterDAgenda edited by
- (diff)
- 10:57 Gec8ClusterDAgenda edited by
- (diff)
- 10:56 Gec8ClusterDAgenda edited by
- (diff)
- 10:55 Gec8ClusterDAgenda edited by
- (diff)
- 10:54 Gec8ClusterDAgenda edited by
- (diff)
- 10:53 Gec8ClusterDAgenda edited by
- (diff)
- 10:52 Gec8ClusterDAgenda edited by
- (diff)
- 10:50 Gec8ClusterDAgenda edited by
- (diff)
- 10:14 NetKarma created by
- 10:13 netKarma edited by
- (diff)
- 10:08 netKarma edited by
- (diff)
- 09:58 netKarma edited by
- (diff)
- 09:56 2ndInstMeasWork edited by
- (diff)
- 09:47 netKarma edited by
- (diff)
- 09:41 netKarma edited by
- (diff)
08/01/10:
- 21:50 2ndInstMeasWork edited by
- (diff)
- 21:49 2ndInstMeasWork edited by
- (diff)
- 18:32 GEC8DemoSummary edited by
- (diff)
- 11:21 Milestone UMLPEN: S2.e Provide POC to Security team completed
- Provide POC to Security team and provide input for security review in …
07/31/10:
- 21:05 Milestone DIGOBREG: S2.g Collaborate with O&M team completed
- Collaborate with the O&M team on methods for Spiral 2 in relation to …
- 16:27 GEC8DemoSummary edited by
- (diff)
- 16:22 GEC8DemoSummary edited by
- (diff)
- 02:05 Gec8Workshops edited by
- (diff)
- 00:00 Milestone OFIU: S2.e Plan and engineer GEC 9 demo completed
- Plan and engineer demo for GEC 9 in November.
- 00:00 Milestone OFRG: S2.e Plan and engineer GEC 9 demo completed
- Plan and engineer demo for GEC 9 in November.
- 00:00 Milestone OFUWA: S2.e Plan and engineer GEC 9 demo completed
- Plan and engineer demo for GEC 9 in November.
- 00:00 Milestone OFGT: S2.e Plan and engineer GEC 9 demo completed
- Plan and engineer demo for GEC 9 in November.
- 00:00 Milestone OFNOX: S2.j Plan and engineer GEC 9 demo completed
- Plan and engineer demo for GEC 9 in November.
- 00:00 Milestone OFCLEM: S2.f Upgrade small deployments to use OF 1.0 completed
- Upgrade small deployments to use OpenFlow 1.0 implementations and GENI …
- 00:00 Milestone OFNOX: S2.k Support campuse upgrades to OF 1.0 and GENI API completed
- Campuses will be upgrading their small deployments to use OF 1.0 …
- 00:00 Milestone OFPR: S2.e Plan and engineer GEC 9 demo completed
- Plan and engineer demo for GEC 9 in November.
- 00:00 Milestone OFCLEM: S2.e Plan and engineer GEC 9 demo completed
- Plan and engineer demo for GEC 9 in November.
- 00:00 Milestone OFUWI: S2.f Upgrade small deployments to use OF 1.0 completed
- Upgrade small deployments to use OpenFlow 1.0 implementations and GENI …
- 00:00 Milestone OFUWA: S2.f Upgrade small deployments to use OF 1.0 completed
- Upgrade small deployments to use OpenFlow 1.0 implementations and GENI …
- 00:00 Milestone OFIU: S2.f Upgrade small deployments to use OF 1.0 completed
- Upgrade small deployments to use OpenFlow 1.0 implementations and GENI …
- 00:00 Milestone OFUWI: S2.e Plan and engineer GEC 9 demo completed
- Plan and engineer demo for GEC 9 in November.
- 00:00 Milestone OFRG: S2.f Upgrade small deployments to use OF 1.0 completed
- Upgrade small deployments to use OpenFlow 1.0 implementations and GENI …
Note: See TracTimeline
for information about the timeline view.