Timeline



01/05/10:

16:12 instools-design-doc.pdf attached to InstrumentationTools by griff@netlab.uky.edu
Architectural Design and Specification of the INSTOOLS Measurement System
12:17 Embedded Real-Time Measurements edited by caroline@ee.columbia.edu
(diff)
12:15 GENI_QR_ERM_Jan10.pdf attached to Embedded Real-Time Measurements by caroline@ee.columbia.edu
ERM Quarterly Report (Jan 1, 2010)
12:07 ProvisioningService edited by Vic Thomas
(diff)
11:49 S3Monitor-QSR-Dec09 created by Vic Thomas
11:42 ScalableMonitoring edited by Vic Thomas
(diff)

01/04/10:

17:18 Milestone KANSEI: S2.c Extend researcher portal to support workflow management completed
Extend KanseiGenie Researcher Portal to Support Experiment Workflow …
14:25 GEC6CFWGAgenda edited by Aaron Falk
(diff)
13:17 Milestone MILNGENI: S2.b End hosts with intermitted connectivity completed
Operation with end-hosts that have intermittent connectivity and/or …

01/01/10:

16:35 Milestone BGPMux: S2.e BGP Mux in GaTech syllabus completed
- Release “integration of BGP Mux as a tool for learning about BGP” …
15:53 Milestone ViSE: S2.e Installation of x86 sensor node completed
Best-effort installation of Pelham tower x86 sensor node (note: funded …
00:00 Milestone OFNOX: S2.b Release NOX supporting OpenFlow 1.0 completed
Release software that supports OpenFlow 1.0. In GENI environments. …

12/31/09:

20:48 Milestone NETKARMA: S2.c identify tools completed
Establish connections with relevant experimental tools projects …
18:36 OnTimeMeasure edited by Prasad Calyam
(diff)
18:35 OnTimeMeasure edited by Prasad Calyam
(diff)
18:35 OnTimeMeasure edited by Prasad Calyam
(diff)
17:55 Milestone GpENI: S2.f MAX completed
Investigate options for interconnecting MAX with GpENI; document in a …
17:44 Milestone RAVEN: S2.a continuous completed
a) Support continuous operation of GENI. Raven/Stork repository must …
17:28 Milestone SPP: S2.m code completed
Provide sample applications using SPP fast paths and provide complete, …
17:16 ExptsSecurityAnalysis edited by Vic Thomas
(diff)
17:16 Milestone RAVEN: S2.c two cluster plan completed
c) Plan for using Raven as a provisioning service for one other …
17:11 PGAugmentation edited by Vic Thomas
(diff)
17:06 PGAugmentation edited by Vic Thomas
(diff)
17:01 ProtoGENI edited by Vic Thomas
(diff)
16:47 OnTimeMeasure edited by Vic Thomas
(diff)
16:44 Ticket #289 (NetKarma Dec 2009 Milestones) created by chsmall@grnoc.iu.edu
We have added the NetKarma 2009 Q4 quarterly report to the wiki at: …
16:38 Milestone OnTime: S2.a: OnTimeMeasure for ProtoGENI design v 1.0 completed
High-level design of OnTimeMeasure Version 1.0 customizations for …
16:36 netKarma edited by chsmall@grnoc.iu.edu
Added link to NetKarma 2009 Q4 report (diff)
16:34 NetKarma_2009Q4 Qtrly Report.pdf attached to netKarma by chsmall@grnoc.iu.edu
NetKarma 2009 Q4 report
16:18 Milestone MAX: S2.a NetFPGA Integration into DRAGON completed
Complete the placement and configuration of the NetFPGA systems into …
16:06 Milestone MAX: S2.f DRAGON Aggregate Manager Documentation completed
Update the design and installation documents for the DRAGON Aggregate …
16:05 Milestone MAX: S2.e User Support completed
Work with and support interested users on use of the DRAGON GENI …
16:02 Milestone MAX: S2.d Common Control Framework Design completed
Work with GENI community to develop an approach for a common control …
12:53 Milestone SPP: Limited research available completed
Make initial SPP deployment available for limited external research
11:26 Milestone GpENI: S2.e VINI completed
Collaborate with Princeton on the programmable router feature using …
10:46 IGENI edited by hmussman@bbn.com
(diff)
10:46 iGENI_Quarterly_Report_Q1_2009-Dec2 8_PDF.pdf attached to IGENI by hmussman@bbn.com
10:33 DICLOUD edited by hmussman@bbn.com
(diff)
10:32 2009-12-31 GENI DiCloud q1 report final.pdf attached to DICLOUD by hmussman@bbn.com
09:52 Milestone MAX: S2.c DRAGON Aggregate Manager Enhancement Design completed
Complete design for the enhancements to the DRAGON Aggregate Manager. …
09:52 Milestone NETKARMA: S2.b webpage completed
Set up project web page Status: Web page at …
09:41 Milestone RAVEN: S2.b GUSH integration completed
b) Integration with GUSH. Integrate provisioning into the GUSH set of …
00:00 Milestone OFIU: S2.a1 Select vendors completed
Select vendors for on-campus hardware evaluations.
00:00 Milestone OFSTAN: S2.a Release OpenFlow 1.0 completed
Release OpenFlow 1.0.

12/30/09:

21:11 Ticket #213 (Integration and Documentation proceeding) closed by griff@netlab.uky.edu
fixed: A complete document describing the INSTOOL instrumentation and …
17:13 Milestone PrimoGENI: S2.a: Integration of PRIME into ProtoGENI completed
Initial draft of the design document that describes how to integrate …
16:26 MillionNodeGENI edited by Vic Thomas
(diff)
16:25 MillionNodeGENI edited by Vic Thomas
(diff)
16:24 qsr-june09.2.pdf attached to MillionNodeGENI by Vic Thomas
December 2009 Quarterly Status Report.
16:20 MillionNodeGENI edited by Vic Thomas
(diff)
16:19 MillionNodeGENI edited by Vic Thomas
(diff)
16:18 Milestone SECUREUPDATES: S2.c repo lib design completed
Deliver a design document for the repository library protection …
16:17 Milestone SECUREUPDATES: S2.b client lib design completed
Deliver a design document for client library protection against replay …
14:39 Milestone GUSH: S2.b Course development completed
Course materials are available from Jeannie Albrecht upon request and …
08:46 PrimoGENI edited by liux@cis.fiu.edu
(diff)
01:40 PrimoGENI edited by liux@cis.fiu.edu
(diff)
01:38 primogeni-cra.jpg attached to PrimoGENIDesignDocument by liux@cis.fiu.edu
01:33 primogeni-aggr.jpg attached to PrimoGENIDesignDocument by liux@cis.fiu.edu
01:29 PrimoGENIDesignDocument edited by liux@cis.fiu.edu
(diff)
01:21 PrimoGENIDesignDocument edited by liux@cis.fiu.edu
(diff)
01:16 PrimoGENIDesignDocument created by liux@cis.fiu.edu
00:54 PrimoGENI edited by liux@cis.fiu.edu
(diff)

12/29/09:

17:17 MillionNodeGENI edited by Vic Thomas
(diff)
16:41 Milestone OnTime: S2.b: PoC for response and escalation group completed
Identify point-of-contact (POC) for GENI Prototype Response and …
11:24 OFIU edited by chsmall@grnoc.iu.edu
(diff)
11:02 OFIU edited by chsmall@grnoc.iu.edu
(diff)
11:02 OFIU-2009Q4-status.pdf attached to OFIU by chsmall@grnoc.iu.edu
IU Campus Trial 2009 Q4 Quarterly Report

12/28/09:

22:52 InstrumentationTools edited by griff@netlab.uky.edu
(diff)
20:30 Ticket #288 (Spiral 2: Prototyping plans milestone completed) created by cviecco@grnoc.iu.edu
The file has been added to: …
19:52 Gmoc_spiral2_prototying_plans.doc attached to GENIMetaOps by cviecco@grnoc.iu.edu
17:59 Ticket #287 (Milestone S2.a completion) closed by hmussman@bbn.com
fixed
17:57 Ticket #287 (Milestone S2.a completion) created by hmussman@bbn.com
Two presentations at GEC 6 meetings on iGENI
17:48 Ticket #286 (Milestone S2.g completion) closed by hmussman@bbn.com
fixed
17:46 Ticket #286 (Milestone S2.g completion) created by hmussman@bbn.com
Per 11/20/09 email: Ilia and all, Attached is an updated set of …
17:36 MPRADIO edited by hmussman@bbn.com
(diff)
17:35 1740-Clemson-Programmable-Radio-Report-09Q4.pdf attached to MPRADIO by hmussman@bbn.com
17:30 Ticket #285 (Milestone S2.b completion) closed by hmussman@bbn.com
fixed
17:30 Ticket #284 (Milestone S2.b completion) closed by hmussman@bbn.com
fixed
17:28 Ticket #285 (Milestone S2.b completion) created by hmussman@bbn.com
Per 12/22/09 email; Please find attached to this email Deliverable …
17:26 Ticket #284 (Milestone S2.b completion) created by hmussman@bbn.com
Per 12/22/09 email; Please find attached to this email Deliverable …
17:06 Ticket #283 (Milestone S2.1 completion) closed by hmussman@bbn.com
fixed
17:06 Ticket #283 (Milestone S2.1 completion) created by hmussman@bbn.com
Per 12/21 email: Hi Camilo, Wenjie will be expert from our team to …
17:04 Ticket #282 (Milestone S2.j completion) closed by hmussman@bbn.com
fixed
17:04 Ticket #282 (Milestone S2.j completion) created by hmussman@bbn.com
Per 12/21/09 email: Hi Camilo, Wenjie will be expert from our team …
16:15 WiMAXInteg/CampusInstallation edited by hmussman@bbn.com
(diff)
16:09 WiMAXInteg/CampusInstallation edited by hmussman@bbn.com
(diff)
10:59 GRNOC_security_informatics.pdf attached to OFIU by chsmall@grnoc.iu.edu
Presentation to IU School of Informatics Security group
10:29 IU_Openflow_GEC6_OMIS.pdf attached to OFIU by chsmall@grnoc.iu.edu
IU Campus Trial lightning talk given to OMIS WG at GEC6
00:00 Milestone GMOC: S2.a Spiral 2 prototyping plans completed
Complete Spiral 2 Prototyping Plans. Document plans for gathering and …

12/23/09:

14:41 netKarma edited by chsmall@grnoc.iu.edu
(diff)
14:39 netKarma edited by chsmall@grnoc.iu.edu
(diff)

12/22/09:

17:30 Milestone DICLOUD: S2.b Plan to connect to cloud completed
Report on the options and cost implications for network connectivity …
17:10 Ticket #95 (milestone 1e completion) closed by Ivan Seskar
fixed: Demonstrated at GEC6
15:46 Ticket #276 (Providing CM for VLAN creation on backbone switches to other projects) closed by Leigh Stoller
fixed: The appropriate modifications have been made to the ProtoGeni …
14:27 Milestone MeasurementSys: S1.e Prototype with basic measurement functionality. completed
Develop a prototype with basic measurement functionality, including …

12/21/09:

20:05 Ticket #281 (RSpec extension spec) closed by duerig@bas.flux.utah.edu
fixed: A new version of ProtoGENI RSpecs has been developed which includes a …
20:04 Ticket #281 (RSpec extension spec) created by duerig@bas.flux.utah.edu
Release RSpec extension specification, describing how other projects …
17:20 Milestone KANSEI: S2.k POC to GENI security team completed
Provide POC to Security team and provide input for security review in …
17:06 Milestone KANSEI: S2.j POC to GENI response team completed
Provide POC to GENI Prototype Response and Escalation team. (11/1/09)
17:06 Milestone KANSEI: S2.i Collaborate with GMOC completed
Collaborate with GMOC operations group on providing access to Kansei …

12/19/09:

14:57 KanseiSensorNet edited by hzhang@cs.wayne.edu
(diff)

12/18/09:

17:08 Milestone PGINTEGRN: S2.b RSpec extension spec completed
Release RSpec extension specification, describing how other projects …
15:54 clusterdvlan edited by hmussman@bbn.com
(diff)
11:43 OFIU edited by chsmall@grnoc.iu.edu
(diff)
10:34 WiMAXInteg edited by hmussman@bbn.com
(diff)
10:34 WiMAXInteg edited by hmussman@bbn.com
(diff)
10:32 WiMAX Concepts and RF Measuremnts by HP WiMAX-details.pdf attached to WiMAXInteg by hmussman@bbn.com

12/17/09:

17:30 Milestone DIGOBREG: S2.b DOR services to the Million Node GENI project completed
Provide Digital Object Registry services to the Million Node GENI …
15:43 Ticket #277 (SNMP counters on ProtoGENI switches to other projects) closed by ricci@cs.utah.edu
fixed: SNMP access to our switches has also been provided to the LAMP …

12/16/09:

18:46 gec6-fahmy.pdf attached to Gec6ClusterCMondaySlides by fahmy@cs.purdue.edu
Sonia Fahmy's slides on scalable and extensible network monitoring
18:23 WiMAXInteg/CampusInstallation edited by hmussman@bbn.com
(diff)
12:41 OFRG edited by Josh Smift
Alphabetized the campus after Stanford (diff)
12:40 OFGT edited by Josh Smift
Alphabetized the campus after Stanford (diff)
12:40 OFCLEM edited by Josh Smift
Alphabetized the campus after Stanford (diff)
12:39 OFIU edited by Josh Smift
Alphabetized the campus after Stanford (diff)
12:20 OFUWA edited by Josh Smift
Removed reference to E-GENI (diff)
12:20 OFUWI edited by Josh Smift
Removed reference to E-GENI (diff)
12:19 OFRG edited by Josh Smift
Removed reference to E-GENI (diff)
12:19 OFIU edited by Josh Smift
Removed reference to E-GENI (diff)
12:18 OFGT edited by Josh Smift
Removed reference to E-GENI (diff)
12:18 OFCLEM edited by Josh Smift
Removed reference to E-GENI (diff)

12/15/09:

17:28 Milestone ProtoGENI.S2.b: Integration Release 2 completed
GENI Software Integration Release 1.

12/14/09:

15:01 WiMAXInteg edited by hmussman@bbn.com
(diff)
13:05 OFUWA edited by Josh Smift
Added more contacts (diff)
12:52 OFUWI edited by Josh Smift
Added more contacts (diff)
12:51 OFRG edited by Josh Smift
Added more contacts (diff)
12:50 OFIU edited by Josh Smift
Added more contacts (diff)
12:49 OFGT edited by Josh Smift
(diff)
12:47 OFCLEM edited by Josh Smift
Added more contacts (diff)
12:06 Milestone SCAFFOLD: S2.a demo switch completed
Demonstrate OpenFlow-based SCAFFOLD switch and minimal L2 network …
09:59 Gec6Agenda edited by Aaron Falk
(diff)
09:57 Gec6Agenda edited by Aaron Falk
copied and linked ProtoGENI cluster meeting agenda to wiki from pathable (diff)
09:56 Gec6Agenda edited by Aaron Falk
(diff)
09:56 Gec6ProtoGeniClusterMeetingAgenda created by Aaron Falk
09:54 Gec6Agenda edited by Aaron Falk
added link to OMIS wg agenda (diff)
09:53 Gec6Agenda edited by Aaron Falk
(diff)
09:27 Ticket #280 (SPP Hardware down in SLC and DC) closed by chaos@bbn.com
duplicate: This is covered by tickets #250 and #274.
09:24 clusterdvlan edited by hmussman@bbn.com
(diff)
09:23 clusterdvlan edited by hmussman@bbn.com
(diff)
09:22 Ticket #280 (SPP Hardware down in SLC and DC) created by Josh Karlin
According to John DeHart SPP has had hardware failures in the SPP …
09:09 clusterdvlan edited by hmussman@bbn.com
(diff)

12/13/09:

12:46 Gec6Agenda edited by chaos@bbn.com
(diff)
12:40 GEC6_MesoScale-Dempsey.ppt attached to Gec6Agenda by chaos@bbn.com
12:40 GEC6_experiments_NASA-DTN-Birrane.pptx attached to Gec6Agenda by chaos@bbn.com
12:39 GEC6_experiments_FCT-Shenoy.pptx attached to Gec6Agenda by chaos@bbn.com
12:39 GEC6_experiments_DavisSocialLinks.ppt attached to Gec6Agenda by chaos@bbn.com
12:39 GEC6_day3_GPO-Wrapup-Chip.ppt attached to Gec6Agenda by chaos@bbn.com
12:39 GEC6_day2_Welcome-Chip.ppt attached to Gec6Agenda by chaos@bbn.com
12:38 GEC6_day2_GENI-Spiral2-Chip.ppt attached to Gec6Agenda by chaos@bbn.com

12/11/09:

16:40 clusterdvlan edited by hmussman@bbn.com
(diff)
16:11 clusterdvlan edited by hmussman@bbn.com
(diff)
15:50 clusterdvlan edited by hmussman@bbn.com
(diff)
15:46 clusterdvlan edited by hmussman@bbn.com
(diff)
15:44 clusterdvlan edited by hmussman@bbn.com
(diff)
12:10 EnterpriseGeni edited by Vic Thomas
(diff)

12/10/09:

20:01 Embedded Real-Time Measurements edited by hmussman@bbn.com
(diff)
20:00 Ticket #279 (milestone S2.a completion) closed by hmussman@bbn.com
fixed
19:59 Ticket #279 (milestone S2.a completion) created by hmussman@bbn.com
Completed per attached pdf.
18:45 Ticket #278 (Gather ViSE release v1.x software) created by hmussman@bbn.com
Gather ViSE release v1.x software
15:54 Ticket #277 (SNMP counters on ProtoGENI switches to other projects) created by ricci@cs.utah.edu
Part of this milestone is to export operational data, such as switch …
15:49 Ticket #276 (Providing CM for VLAN creation on backbone switches to other projects) created by ricci@cs.utah.edu
As of right now the VLANs that have been created for the SPP nodes on …

12/09/09:

16:56 BGPMux edited by Aaron Falk
(diff)
16:54 Ticket #275 (Due date change for milestone BGP-Mux: S2.c ops transition) closed by Aaron Falk
fixed
16:54 Ticket #275 (Due date change for milestone BGP-Mux: S2.c ops transition) created by Aaron Falk
DTunnels/BGP-Mux can't reasonably support operations until a) it has a …

12/08/09:

16:24 Ticket #274 (SPP GPE Board failure at Washington DC Pop) created by jdd@arl.wustl.edu
One of the two GPEs in the SPP Chassis at the Washington DC Pop has …
14:29 clusterdvlan edited by hmussman@bbn.com
(diff)
14:29 GeniInstMeas edited by hmussman@bbn.com
(diff)
14:27 clusterdvlan edited by hmussman@bbn.com
(diff)
14:24 clusterdvlan edited by hmussman@bbn.com
(diff)
14:23 Screen created by Josh Smift
12:07 GeniInstMeas edited by hmussman@bbn.com
(diff)
12:04 GeniInstMeas edited by hmussman@bbn.com
(diff)
11:57 GeniInstMeas edited by hmussman@bbn.com
(diff)
11:52 GeniInstMeas edited by hmussman@bbn.com
(diff)
11:49 GeniInstMeas edited by hmussman@bbn.com
(diff)
11:47 GeniInstMeas edited by hmussman@bbn.com
(diff)
09:28 Ticket #273 (ProtoGENI Component/Aggregate Manager API V2 Document) closed by ricci@cs.utah.edu
fixed
09:28 Ticket #273 (ProtoGENI Component/Aggregate Manager API V2 Document) created by ricci@cs.utah.edu
This document was released in time for GEC6, and was presented and …
09:21 Ticket #272 (ProtoGENI security POC identified) closed by ricci@cs.utah.edu
fixed
09:20 Ticket #272 (ProtoGENI security POC identified) created by ricci@cs.utah.edu
The ProtoGENI security POC was identified several months ago as being …

12/07/09:

15:05 clusterdvlan edited by hmussman@bbn.com
(diff)
14:43 clusterdvlan edited by hmussman@bbn.com
(diff)
14:42 clusterdvlan edited by hmussman@bbn.com
(diff)
14:39 Visio-120409_ClusterD_Connectivity_Page_10.jpg attached to clusterdvlan by hmussman@bbn.com
14:39 Visio-120409_ClusterD_Connectivity_Page_09.jpg attached to clusterdvlan by hmussman@bbn.com
14:39 Visio-120409_ClusterD_Connectivity_Page_08.jpg attached to clusterdvlan by hmussman@bbn.com
14:39 Visio-120409_ClusterD_Connectivity_Page_07.jpg attached to clusterdvlan by hmussman@bbn.com
14:38 Visio-120409_ClusterD_Connectivity_Page_06.jpg attached to clusterdvlan by hmussman@bbn.com
14:38 Visio-120409_ClusterD_Connectivity_Page_05.jpg attached to clusterdvlan by hmussman@bbn.com
14:38 Visio-120409_ClusterD_Connectivity_Page_04.jpg attached to clusterdvlan by hmussman@bbn.com
14:38 Visio-120409_ClusterD_Connectivity_Page_03.jpg attached to clusterdvlan by hmussman@bbn.com
14:38 Visio-120409_ClusterD_Connectivity_Page_02.jpg attached to clusterdvlan by hmussman@bbn.com
14:37 Visio-120409_ClusterD_Connectivity_Page_01.jpg attached to clusterdvlan by hmussman@bbn.com
14:32 ClusterD edited by hmussman@bbn.com
(diff)
14:30 ClusterD edited by hmussman@bbn.com
(diff)
14:27 Visio-111609_ClusterD_Connectivity_Page_3.jpg attached to ClusterD by hmussman@bbn.com
12:59 clusterdvlan edited by hmussman@bbn.com
(diff)
12:41 clusterdvlan edited by hmussman@bbn.com
(diff)
12:03 clusterdvlan edited by hmussman@bbn.com
(diff)
11:49 clusterdvlan edited by hmussman@bbn.com
(diff)
11:27 clusterdvlan edited by hmussman@bbn.com
(diff)
Note: See TracTimeline for information about the timeline view.