10/06/09:
- 13:14 Milestone CMU Lab: Emulator user interface integration completed
- Task 6: Emulator user interface integration. Current state: …
- 13:14 Ticket #86 (Status update for task 6: Emulator user interface integration) closed by
- wontfix: Closing this ticket as 'wontfix' in Spiral 1. Justification can be …
- 13:06 Milestone CMU Lab: Get CMU ProtoGENI node on I2 VLAN completed
- Task 4: Data plane integration with ProtoGENI. Be able to run …
- 11:16 Ticket #215 (Document integrated experimentation) closed by
- fixed
- 11:14 Ticket #128 (Ticket for Miletone: student testbed use) closed by
- fixed: Documented in #204.
- 11:14 Ticket #204 (need documentation of milestone completion) closed by
- fixed
10/05/09:
10/02/09:
- 19:00 Milestone DigitalObjectRegistry: Adapt digital object architecture to meet clearinghouse registry needs. completed
- Developed a clearinghouse that federates with the ProtoGENI …
- 14:17 Ticket #215 (Document integrated experimentation) created by
- Both the Emulator and the Homenet nodes can now be used in conjunction …
- 00:00 Milestone CMU Lab: student testbed use completed
- Task 10: Plan for student use of CMU testbed Completed. Documented …
- 00:00 Milestone CMU Lab: Integrated experimentation between CMU testbeds completed
- Task 7: Integrated experimentation between CMU testbeds. Depends on …
10/01/09:
- 22:18 ProgrammableEdgeNode edited by
- (diff)
- 22:16 ProgrammableEdgeNode edited by
- (diff)
- 17:39 Milestone KANSEI: 1b Establish Kansei testbed clearinghouse completed
- b) Establish Kansei testbed clearinghouse, based upon early version of …
- 17:12 Milestone KANSEI: 1e Implement, integrate and document v1.0 software completed
- e) Implement, integrate and document a first release (v1.0, including …
- 17:08 Milestone KANSEI: 1g Open Kansei testbed to GENI users completed
- g) Open your Kansei testbed to GENI users (outside of associated …
- 17:08 Milestone KANSEI: 1f Demo basic virtualization and experiment control functions completed
- f) Demo basic virtualization and experiment control functions in your …
- 17:07 Milestone KANSEI: 1d2 Integrate Kansei component and aggregate managers- completed
- d) Refactor Kansei component and aggregate managers, and integrate …
- 17:07 Milestone KANSEI: 1c2 Integrate Kansei researcher portal- completed
- c2) Refactor Kansei researcher portal, and integrate with ORCA …
- 16:27 InstrumentationTools edited by
- fix typo (diff)
- 16:08 InstrumentationTools edited by
- Add presentation (diff)
- 16:07 Milestone ViSE: S2.m Available to GENI users completed
- Make your (federated) testbed available to GENI users (outside of …
- 16:01 InstrumentationTools edited by
- add new quarterly reports (diff)
- 15:49 Embedded Real-Time Measurements edited by
- (diff)
- 15:44 Ticket #214 (Provide pointer to AM and tools software and information on how GENI ...) created by
- UKY has continued to develop and revise AM and integrate with …
- 15:25 Ticket #213 (Integration and Documentation proceeding) created by
- UKY staff have been writing and integrating instrumentation tools and …
- 13:15 Milestone MAX: Delivery of preliminary design doc completed
- Delivery of preliminary (aggregate manager) design documentation to GPO
- 13:15 Ticket #212 (Milestone MAX: Delivery of preliminary design doc) closed by
- fixed: Milestone complete. -------- Original Message -------- Subject: Re: …
- 13:14 Ticket #212 (Milestone MAX: Delivery of preliminary design doc) created by
- 12:56 GENIMetaOps edited by
- (diff)
- 12:37 Milestone UMLPEN: Architecture and Design Documents completed
- Deliver initial architecture and design documents for PEN, supporting …
- 12:37 Milestone UMLPEN: Deployable PEN available completed
- Have a deployable PEN available for integration into a spiral-1 …
- 11:12 GENIMetaOps edited by
- Moved link of Emergency stop to pdf not postscript version (diff)
- 10:51 GENIMetaOps edited by
- Added Concept of Operations Link (diff)
- 10:36 GENIMetaOps edited by
- Ops sumitted the PS version of the con-ops not the pdf version. (diff)
- 10:36 Milestone ViSE: S1.i Testbed available for public use within our cluster completed
- 1i [M5] Testbed available for public use within our cluster, …
- 00:00 Milestone ENTGENI: S1.e Collaborate with O&M and Security teams completed
- Collaborate with GENI O&M and Security teams on enterprise network …
09/30/09:
- 23:25 Ticket #211 (Competion of task: Draft GENI Concept of Operations) created by
- The draft document has been uploaded to the wiki here: …
- 16:28 Milestone TIED: S1.h Provide direct VLAN interface to TIED resources completed
- Provide direct external ethernet-level (VLAN) access interface to TIED …
- 15:46 Ticket #210 (Completion of Milestone Emergency Stop and Notifications.) created by
- As agreed with GPO the deliverable for this milestone is a design …
- 15:44 GENIMetaOps edited by
- (diff)
- 15:27 Milestone UMLPEN: GENI Outreach completed
- Identify contribution to GENI outreach
- 15:02 Milestone ORCABEN: 1f All ORCA assigned prototypes integrated into ORCA clearinghouse completed
- 1f All ORCA assigned prototypes integrated into ORCA clearinghouse
- 13:47 Ticket #209 (Milestone completion: Complete initial implementation of prototype GMOC) created by
- An initial prototype GMOC implementaiton has been developed. It is …
- 13:40 Ticket #208 (Competion of milestone initial GMOC Data Exchanger Implementation) created by
- GMOC has created both a format and tools to translate to/from this …
- 13:36 Ticket #203 (KANS SPP having problems) closed by
- fixed: The ATCA card was replaced and John DeHart reports that it's function …
- 11:37 Ticket #165 (Get feedback on GMOC internal data format from GENI projects) closed by
- fixed: No more comment have been received. Working on the assumption that …
- 11:33 Ticket #207 (Completion of initial GMOC Dataset Translater Implementation) created by
- Two translaters have been built: to import Planetlab comon data and to …
- 11:18 Ticket #205 (Completion of initial GMOC framework demostration.) closed by
- duplicate: Ops duplicate submission
- 11:17 Ticket #206 (Completion of initial GMOC framework demostration milestone.) created by
- A GMOC framework demo was done at GEC5. The demo site is located at …
- 11:14 Ticket #205 (Completion of initial GMOC framework demostration.) created by
- A GMOC framework demo was done at GEC5. The demo site is located at …
- 11:09 Ticket #164 (Get feedback on specialized operational dataset definitions) closed by
- fixed: The data exchanger can accomodate this data, closing this requirement …
- 11:02 Ticket #130 (Requirements for GMOC demo at GEC5) closed by
- fixed
09/29/09:
- 18:04 Embedded Real-Time Measurements edited by
- (diff)
- 15:31 Ticket #204 (need documentation of milestone completion) created by
- I believe Peter reported verbally during the GPO visit to CMU that …
- 15:09 Milestone ProtoGENI: control plane integration of cluster-mates completed
- Work with other groups and projects to work towards integration of the …
- 15:08 Ticket #200 (Verify cluster mates have needed CF support) closed by
- fixed: From Rob: > I've been in contact with the georgia tech and UML folks …
- 13:23 DOME edited by
- (diff)
- 13:21 DOME edited by
- (diff)
- 13:19 DOME edited by
- (diff)
09/28/09:
- 16:05 Milestone DOME: 1e Implement, integrate and document a first release (v1.0) of the software completed
- 1e Implement, integrate and document a first release (v1.0) of the …
- 10:22 Milestone ViSE: S1.g Contingent upon available budget, provide a VLAN connection from your testbed to the Internet2 completed
- 1g Contingent upon available budget, provide a VLAN connection from …
09/25/09:
- 13:39 Gec5Agenda edited by
- (diff)
- 13:38 Gec5Agenda edited by
- (diff)
- 13:37 Gec5Agenda edited by
- (diff)
- 13:10 Gec5Agenda edited by
- (diff)
- 13:06 Gec5Agenda edited by
- (diff)
- 13:06 Gec5Agenda edited by
- (diff)
09/24/09:
- 16:33 Milestone DOME: 1g provide a VLAN connection from your testbed's server to the Internet2 backbone network completed
- 1g Contingent upon available budget, provide a VLAN connection from …
09/23/09:
- 17:06 Ticket #179 (Provide plan for making Aggregate Manager externally accessible in ...) closed by
- fixed: The E-GENI Aggregate Manager is accessible by configuring the …
- 16:45 Ticket #177 (complete timeline and plan for intgration between EntGENI and GENI ...) closed by
- fixed
- 15:54 Milestone ProtoGENI: Control Plane integration of backbone nodes completed
- Integrate ProtoGENI (Emulab) control software into backbone network …
- 14:26 Ticket #198 (Complete control plane integration of three Spiral 1 backbone nodes) closed by
-
fixed: The attached RSpec can be used with
createsliver.py
from the … - 13:24 I2PoPSALT edited by
- (diff)
- 13:22 I2PoPKANS edited by
- (diff)
- 13:18 I2PoPWASH edited by
- (diff)
- 00:00 Milestone ENTGENI: S1.a Deploy Phase 0 Enterprise GENI network at Stanford completed
- Deploy Phase 0 of Enterprise GENI comprising an OpenFlow network of …
- 00:00 Milestone ENTGENI: S1.b Start integrating interfaces from ENTGENI AM to Clearinghouse completed
- Start integrating interfaces to a GENI control framework clearinghouse …
09/22/09:
- 16:58 Gec5Agenda edited by
- (diff)
- 16:55 Gec5Agenda edited by
- (diff)
- 16:54 Gec5Agenda edited by
- (diff)
- 16:11 Gec5Agenda edited by
- (diff)
- 16:06 Gec5Agenda edited by
- (diff)
- 16:02 Gec5Agenda edited by
- (diff)
- 16:01 Gec5Agenda edited by
- (diff)
- 15:42 Gec5Agenda edited by
- (diff)
- 15:40 Gec5Agenda edited by
- (diff)
- 15:40 Gec5Agenda edited by
- (diff)
- 15:40 Gec5Agenda edited by
- (diff)
- 15:39 Gec5Agenda edited by
- (diff)
- 15:39 Gec5Agenda edited by
- (diff)
- 15:38 Gec5Agenda edited by
- (diff)
- 15:38 Gec5Agenda edited by
- (diff)
- 15:38 Gec5Agenda edited by
- (diff)
- 15:38 Gec5Agenda edited by
- (diff)
- 15:37 Gec5Agenda edited by
- (diff)
- 15:37 Gec5Agenda edited by
- (diff)
- 15:33 Gec5Agenda edited by
- (diff)
- 15:29 Gec5Agenda edited by
- (diff)
- 15:29 Gec5Agenda edited by
- (diff)
- 15:28 Gec5Agenda edited by
- (diff)
09/21/09:
09/17/09:
- 11:23 presentations edited by
- (diff)
- 11:13 presentations edited by
- (diff)
- 11:11 presentations edited by
- (diff)
- 11:00 presentations edited by
- (diff)
- 10:47 presentations edited by
- (diff)
- 10:44 presentations edited by
- (diff)
- 10:23 presentations edited by
- (diff)
- 10:21 presentations edited by
- (diff)
09/16/09:
- 17:25 presentations edited by
- (diff)
- 17:24 presentations edited by
- (diff)
- 17:12 presentations edited by
- (diff)
- 17:06 presentations edited by
- (diff)
- 17:02 DTunnels edited by
- (diff)
- 16:26 presentations edited by
- (diff)
- 16:08 presentations edited by
- (diff)
- 12:18 Milestone BGPMux: Define RSpec - completed
- Define RSpec. This should be an RSPec that defines the resources for …
- 11:39 Ticket #181 (Define ProtoGENI RSpec for BGP Mux and tunnels) closed by
- fixed: Rob and Nick agree the RSpecs work.
09/15/09:
- 16:40 Integration edited by
- (diff)
- 16:36 Integration edited by
- (diff)
- 15:49 Ticket #203 (KANS SPP having problems) created by
- John DeHart mentioned that the KANS SPP node might need a power cycle. …
- 13:45 Integration edited by
- (diff)
- 13:41 Integration edited by
- (diff)
- 13:36 I2PoPKANS edited by
- (diff)
- 13:33 I2PoPWASH edited by
- (diff)
- 13:10 Integration edited by
- (diff)
- 13:09 Integration edited by
- (diff)
- 13:05 SpiralOne edited by
- (diff)
- 11:12 DTunnels-3Q09-status edited by
- (diff)
- 11:11 DTunnels-3Q09-status edited by
- (diff)
- 08:42 Milestone ProtoGENI: L2 control in backbone nodes completed
- Establish L2 connections within the ProtoGENI backbone network, using …
- 08:38 Ticket #202 (No carrier on ProtoGENI HP switch port A19 at I2 SALT) created by
- The A19 port of ProtoGENI's ProCurve switch at SALT does not get …
09/14/09:
- 18:38 Ticket #199 (Complete L2 control of I2 nodes.) closed by
- fixed
- 14:04 Ticket #201 (Extend BGP-Mux software release to include ProtoGENI compatible ...) created by
- Nick has been maintaining a BGP-Mux repository. When the BGP-Mux …
- 10:58 Ticket #188 (Third SPP node shipped) closed by
- fixed: Install is completed. John DeHart says all is well. The KANS SPP …
09/11/09:
- 16:42 Ticket #173 (Second SPP node preparing to ship) closed by
- fixed: No furhter issues
- 16:42 Ticket #162 (First SPP node shipped) closed by
- fixed: No further issues.
- 16:19 Ticket #158 (Set installation dates for first 3 nodes.) closed by
- fixed: All nodes installed.
- 14:14 Ticket #157 (schedule node installations) closed by
- fixed: The installs were all completed on schedule.
- 14:13 Ticket #195 (SALT install) closed by
- fixed: This install was completed on September 4th.
- 14:12 Ticket #197 (KANS I2 install) closed by
- fixed: All links are now functional, and the install is complete.
- 14:11 Ticket #189 (WASH I2 node install) closed by
- fixed: This installation was completed on August 19. Some additional work to …
- 11:25 Ticket #200 (Verify cluster mates have needed CF support) created by
- Rob is sending out an email asking cluster mates to confirm they have …
- 11:24 Ticket #199 (Complete L2 control of I2 nodes.) created by
- Need to integrate ProtoGENI control of nodes with ProtoGENI front end.
- 11:23 Ticket #198 (Complete control plane integration of three Spiral 1 backbone nodes) created by
- Rob says the control plane software works in the lab. Once the third …
- 11:12 Milestone ProtoGENI: Support experiments on ProtoGENI cluster completed
- Keep the evolving ProtoGENI testbed available to GENI users, starting …
- 09:39 DTunnels-3Q09-status edited by
- removed uncompleted milestone (diff)
- 00:00 Milestone ProtoGENI: Integrate, install 3 nodes in I2 - completed
- Acquire HW for 3 programmable backbone network nodes, complete basic …
09/10/09:
- 20:11 DTunnels-2Q09-status edited by
- (diff)
- 20:11 DTunnels-2Q09-status created by
- 20:10 DTunnels edited by
- (diff)
- 20:09 DTunnels-3Q09-status edited by
- (diff)
- 14:36 Ticket #197 (KANS I2 install) created by
- ProtoGENI install at KANS is ongoing. Machines are powered up. …
- 13:07 DTunnels-3Q09-status edited by
- (diff)
- 11:14 DTunnels-3Q09-status edited by
- (diff)
- 11:13 DTunnels-3Q09-status edited by
- (diff)
- 11:13 DTunnels-3Q09-status edited by
- (diff)
- 11:11 DTunnels-3Q09-status edited by
- (diff)
- 11:11 DTunnels-3Q09-status edited by
- (diff)
- 11:08 DTunnels-3Q09-status created by
- 10:07 Milestone BGPMux: Virtual Network with BGPMux How-To -- completed
- Outreach Milestone: Produce a thorough how-to for use of the BGPMux & …
- 10:07 Ticket #184 (initial how-to draft available) closed by
- fixed: Updated draft available at …
09/09/09:
- 15:20 Integration edited by
- (diff)
- 14:45 Milestone MAX: Specific contribution to GENI outreach completed
- Specific contribution to GENI outreach plan for Spiral 1. …
- 14:44 Ticket #196 (MAX outreach) closed by
- fixed: Task completed. -------- Original Message -------- Subject: Re: Open …
- 14:43 Ticket #196 (MAX outreach) created by
- 8. Specific contribution to GENI outreach plan for Spiral 1. (1-12mo) …
- 13:26 DTunnels edited by
- (diff)
- 13:26 DTunnels edited by
- (diff)
09/08/09:
- 14:09 I2PoPKANS edited by
- (diff)
- 10:31 I2PoPKANS edited by
- (diff)
- 10:29 I2PoPKANS edited by
- (diff)
- 10:13 I2PoPKANS created by
- 10:03 I2PoPSALT edited by
- (diff)
- 10:01 I2PoPSALT edited by
- (diff)
- 09:02 Integration edited by
- (diff)
- 07:52 Integration edited by
- (diff)
09/07/09:
- 15:53 Integration edited by
- (diff)
- 14:26 Integration edited by
- (diff)
- 14:23 Integration edited by
- (diff)
- 12:52 PlanetLabBackbone edited by
- (diff)
- 12:50 PlanetLabBackbone edited by
- (diff)
- 12:50 PlanetLabBackbone edited by
- (diff)
Note: See TracTimeline
for information about the timeline view.