09/29/09:
- 18:04 Embedded Real-Time Measurements edited by
- (diff)
- 15:31 Ticket #204 (need documentation of milestone completion) created by
- I believe Peter reported verbally during the GPO visit to CMU that …
- 15:09 Milestone ProtoGENI: control plane integration of cluster-mates completed
- Work with other groups and projects to work towards integration of the …
- 15:08 Ticket #200 (Verify cluster mates have needed CF support) closed by
- fixed: From Rob: > I've been in contact with the georgia tech and UML folks …
- 13:23 DOME edited by
- (diff)
- 13:21 DOME edited by
- (diff)
- 13:19 DOME edited by
- (diff)
09/28/09:
- 16:05 Milestone DOME: 1e Implement, integrate and document a first release (v1.0) of the software completed
- 1e Implement, integrate and document a first release (v1.0) of the …
- 10:22 Milestone ViSE: S1.g Contingent upon available budget, provide a VLAN connection from your testbed to the Internet2 completed
- 1g Contingent upon available budget, provide a VLAN connection from …
09/25/09:
- 13:39 Gec5Agenda edited by
- (diff)
- 13:38 Gec5Agenda edited by
- (diff)
- 13:37 Gec5Agenda edited by
- (diff)
- 13:10 Gec5Agenda edited by
- (diff)
- 13:06 Gec5Agenda edited by
- (diff)
- 13:06 Gec5Agenda edited by
- (diff)
09/24/09:
- 16:33 Milestone DOME: 1g provide a VLAN connection from your testbed's server to the Internet2 backbone network completed
- 1g Contingent upon available budget, provide a VLAN connection from …
09/23/09:
- 17:06 Ticket #179 (Provide plan for making Aggregate Manager externally accessible in ...) closed by
- fixed: The E-GENI Aggregate Manager is accessible by configuring the …
- 16:45 Ticket #177 (complete timeline and plan for intgration between EntGENI and GENI ...) closed by
- fixed
- 15:54 Milestone ProtoGENI: Control Plane integration of backbone nodes completed
- Integrate ProtoGENI (Emulab) control software into backbone network …
- 14:26 Ticket #198 (Complete control plane integration of three Spiral 1 backbone nodes) closed by
-
fixed: The attached RSpec can be used with
createsliver.py
from the … - 13:24 I2PoPSALT edited by
- (diff)
- 13:22 I2PoPKANS edited by
- (diff)
- 13:18 I2PoPWASH edited by
- (diff)
- 00:00 Milestone ENTGENI: S1.a Deploy Phase 0 Enterprise GENI network at Stanford completed
- Deploy Phase 0 of Enterprise GENI comprising an OpenFlow network of …
- 00:00 Milestone ENTGENI: S1.b Start integrating interfaces from ENTGENI AM to Clearinghouse completed
- Start integrating interfaces to a GENI control framework clearinghouse …
09/22/09:
- 16:58 Gec5Agenda edited by
- (diff)
- 16:55 Gec5Agenda edited by
- (diff)
- 16:54 Gec5Agenda edited by
- (diff)
- 16:11 Gec5Agenda edited by
- (diff)
- 16:06 Gec5Agenda edited by
- (diff)
- 16:02 Gec5Agenda edited by
- (diff)
- 16:01 Gec5Agenda edited by
- (diff)
- 15:42 Gec5Agenda edited by
- (diff)
- 15:40 Gec5Agenda edited by
- (diff)
- 15:40 Gec5Agenda edited by
- (diff)
- 15:40 Gec5Agenda edited by
- (diff)
- 15:39 Gec5Agenda edited by
- (diff)
- 15:39 Gec5Agenda edited by
- (diff)
- 15:38 Gec5Agenda edited by
- (diff)
- 15:38 Gec5Agenda edited by
- (diff)
- 15:38 Gec5Agenda edited by
- (diff)
- 15:38 Gec5Agenda edited by
- (diff)
- 15:37 Gec5Agenda edited by
- (diff)
- 15:37 Gec5Agenda edited by
- (diff)
- 15:33 Gec5Agenda edited by
- (diff)
- 15:29 Gec5Agenda edited by
- (diff)
- 15:29 Gec5Agenda edited by
- (diff)
- 15:28 Gec5Agenda edited by
- (diff)
09/21/09:
09/17/09:
- 11:23 presentations edited by
- (diff)
- 11:13 presentations edited by
- (diff)
- 11:11 presentations edited by
- (diff)
- 11:00 presentations edited by
- (diff)
- 10:47 presentations edited by
- (diff)
- 10:44 presentations edited by
- (diff)
- 10:23 presentations edited by
- (diff)
- 10:21 presentations edited by
- (diff)
09/16/09:
- 17:25 presentations edited by
- (diff)
- 17:24 presentations edited by
- (diff)
- 17:12 presentations edited by
- (diff)
- 17:06 presentations edited by
- (diff)
- 17:02 DTunnels edited by
- (diff)
- 16:26 presentations edited by
- (diff)
- 16:08 presentations edited by
- (diff)
- 12:18 Milestone BGPMux: Define RSpec - completed
- Define RSpec. This should be an RSPec that defines the resources for …
- 11:39 Ticket #181 (Define ProtoGENI RSpec for BGP Mux and tunnels) closed by
- fixed: Rob and Nick agree the RSpecs work.
09/15/09:
- 16:40 Integration edited by
- (diff)
- 16:36 Integration edited by
- (diff)
- 15:49 Ticket #203 (KANS SPP having problems) created by
- John DeHart mentioned that the KANS SPP node might need a power cycle. …
- 13:45 Integration edited by
- (diff)
- 13:41 Integration edited by
- (diff)
- 13:36 I2PoPKANS edited by
- (diff)
- 13:33 I2PoPWASH edited by
- (diff)
- 13:10 Integration edited by
- (diff)
- 13:09 Integration edited by
- (diff)
- 13:05 SpiralOne edited by
- (diff)
- 11:12 DTunnels-3Q09-status edited by
- (diff)
- 11:11 DTunnels-3Q09-status edited by
- (diff)
- 08:42 Milestone ProtoGENI: L2 control in backbone nodes completed
- Establish L2 connections within the ProtoGENI backbone network, using …
- 08:38 Ticket #202 (No carrier on ProtoGENI HP switch port A19 at I2 SALT) created by
- The A19 port of ProtoGENI's ProCurve switch at SALT does not get …
09/14/09:
- 18:38 Ticket #199 (Complete L2 control of I2 nodes.) closed by
- fixed
- 14:04 Ticket #201 (Extend BGP-Mux software release to include ProtoGENI compatible ...) created by
- Nick has been maintaining a BGP-Mux repository. When the BGP-Mux …
- 10:58 Ticket #188 (Third SPP node shipped) closed by
- fixed: Install is completed. John DeHart says all is well. The KANS SPP …
09/11/09:
- 16:42 Ticket #173 (Second SPP node preparing to ship) closed by
- fixed: No furhter issues
- 16:42 Ticket #162 (First SPP node shipped) closed by
- fixed: No further issues.
- 16:19 Ticket #158 (Set installation dates for first 3 nodes.) closed by
- fixed: All nodes installed.
- 14:14 Ticket #157 (schedule node installations) closed by
- fixed: The installs were all completed on schedule.
- 14:13 Ticket #195 (SALT install) closed by
- fixed: This install was completed on September 4th.
- 14:12 Ticket #197 (KANS I2 install) closed by
- fixed: All links are now functional, and the install is complete.
- 14:11 Ticket #189 (WASH I2 node install) closed by
- fixed: This installation was completed on August 19. Some additional work to …
- 11:25 Ticket #200 (Verify cluster mates have needed CF support) created by
- Rob is sending out an email asking cluster mates to confirm they have …
- 11:24 Ticket #199 (Complete L2 control of I2 nodes.) created by
- Need to integrate ProtoGENI control of nodes with ProtoGENI front end.
- 11:23 Ticket #198 (Complete control plane integration of three Spiral 1 backbone nodes) created by
- Rob says the control plane software works in the lab. Once the third …
- 11:12 Milestone ProtoGENI: Support experiments on ProtoGENI cluster completed
- Keep the evolving ProtoGENI testbed available to GENI users, starting …
- 09:39 DTunnels-3Q09-status edited by
- removed uncompleted milestone (diff)
- 00:00 Milestone ProtoGENI: Integrate, install 3 nodes in I2 - completed
- Acquire HW for 3 programmable backbone network nodes, complete basic …
09/10/09:
- 20:11 DTunnels-2Q09-status edited by
- (diff)
- 20:11 DTunnels-2Q09-status created by
- 20:10 DTunnels edited by
- (diff)
- 20:09 DTunnels-3Q09-status edited by
- (diff)
- 14:36 Ticket #197 (KANS I2 install) created by
- ProtoGENI install at KANS is ongoing. Machines are powered up. …
- 13:07 DTunnels-3Q09-status edited by
- (diff)
- 11:14 DTunnels-3Q09-status edited by
- (diff)
- 11:13 DTunnels-3Q09-status edited by
- (diff)
- 11:13 DTunnels-3Q09-status edited by
- (diff)
- 11:11 DTunnels-3Q09-status edited by
- (diff)
- 11:11 DTunnels-3Q09-status edited by
- (diff)
- 11:08 DTunnels-3Q09-status created by
- 10:07 Milestone BGPMux: Virtual Network with BGPMux How-To -- completed
- Outreach Milestone: Produce a thorough how-to for use of the BGPMux & …
- 10:07 Ticket #184 (initial how-to draft available) closed by
- fixed: Updated draft available at …
09/09/09:
- 15:20 Integration edited by
- (diff)
- 14:45 Milestone MAX: Specific contribution to GENI outreach completed
- Specific contribution to GENI outreach plan for Spiral 1. …
- 14:44 Ticket #196 (MAX outreach) closed by
- fixed: Task completed. -------- Original Message -------- Subject: Re: Open …
- 14:43 Ticket #196 (MAX outreach) created by
- 8. Specific contribution to GENI outreach plan for Spiral 1. (1-12mo) …
- 13:26 DTunnels edited by
- (diff)
- 13:26 DTunnels edited by
- (diff)
09/08/09:
- 14:09 I2PoPKANS edited by
- (diff)
- 10:31 I2PoPKANS edited by
- (diff)
- 10:29 I2PoPKANS edited by
- (diff)
- 10:13 I2PoPKANS created by
- 10:03 I2PoPSALT edited by
- (diff)
- 10:01 I2PoPSALT edited by
- (diff)
- 09:02 Integration edited by
- (diff)
- 07:52 Integration edited by
- (diff)
09/07/09:
- 15:53 Integration edited by
- (diff)
- 14:26 Integration edited by
- (diff)
- 14:23 Integration edited by
- (diff)
- 12:52 PlanetLabBackbone edited by
- (diff)
- 12:50 PlanetLabBackbone edited by
- (diff)
- 12:50 PlanetLabBackbone edited by
- (diff)
09/04/09:
- 18:06 SpiralOne edited by
- add link to node Integration pages (diff)
- 17:54 PlanetLabBackbone edited by
- (diff)
- 17:54 ProtoGENIBackbone edited by
- (diff)
- 17:53 I2PoPSALT edited by
- (diff)
- 17:52 I2PoPWASH edited by
- (diff)
- 17:50 I2PoPWASH edited by
- (diff)
- 17:50 PlanetLabBackbone edited by
- (diff)
- 17:49 ProtoGENIBackbone edited by
- (diff)
- 17:49 Integration edited by
- (diff)
- 17:49 Integration edited by
- (diff)
- 17:47 I2PoPSALT edited by
- (diff)
- 17:42 I2PoPSALT created by
- 17:41 I2PoPWASH created by
- 17:40 ProtoGENIBackbone created by
- 17:39 PlanetLabBackbone created by
- 17:38 Integration created by
09/03/09:
- 16:09 DTunnels edited by
- (diff)
- 16:01 DTunnels edited by
- (diff)
- 08:54 ORCABEN edited by
- (diff)
- 08:52 ORCABEN edited by
- (diff)
09/02/09:
- 11:50 Ticket #195 (SALT install) created by
- The SALT installation began today (9/2/09) and is expected to finish …
09/01/09:
- 15:39 MillionNodeGENI edited by
- (diff)
- 15:32 Embedded Real-Time Measurements edited by
- (diff)
- 11:47 Milestone ERM: Support the GPO in developing an experimental use-case completed
- Support the GPO in developing an experimental use-case based on a …