Timeline
09/11/09:
- 16:42 Ticket #173 (Second SPP node preparing to ship) closed by
- fixed: No furhter issues
- 16:42 Ticket #162 (First SPP node shipped) closed by
- fixed: No further issues.
- 16:19 Ticket #158 (Set installation dates for first 3 nodes.) closed by
- fixed: All nodes installed.
- 14:14 Ticket #157 (schedule node installations) closed by
- fixed: The installs were all completed on schedule.
- 14:13 Ticket #195 (SALT install) closed by
- fixed: This install was completed on September 4th.
- 14:12 Ticket #197 (KANS I2 install) closed by
- fixed: All links are now functional, and the install is complete.
- 14:11 Ticket #189 (WASH I2 node install) closed by
- fixed: This installation was completed on August 19. Some additional work to …
- 11:25 Ticket #200 (Verify cluster mates have needed CF support) created by
- Rob is sending out an email asking cluster mates to confirm they have …
- 11:24 Ticket #199 (Complete L2 control of I2 nodes.) created by
- Need to integrate ProtoGENI control of nodes with ProtoGENI front end.
- 11:23 Ticket #198 (Complete control plane integration of three Spiral 1 backbone nodes) created by
- Rob says the control plane software works in the lab. Once the third …
- 11:12 Milestone ProtoGENI: Support experiments on ProtoGENI cluster completed
- Keep the evolving ProtoGENI testbed available to GENI users, starting …
- 09:39 DTunnels-3Q09-status edited by
- removed uncompleted milestone (diff)
- 00:00 Milestone ProtoGENI: Integrate, install 3 nodes in I2 - completed
- Acquire HW for 3 programmable backbone network nodes, complete basic …
09/10/09:
- 20:11 DTunnels-2Q09-status edited by
- (diff)
- 20:11 DTunnels-2Q09-status created by
- 20:10 DTunnels edited by
- (diff)
- 20:09 DTunnels-3Q09-status edited by
- (diff)
- 14:36 Ticket #197 (KANS I2 install) created by
- ProtoGENI install at KANS is ongoing. Machines are powered up. …
- 13:07 DTunnels-3Q09-status edited by
- (diff)
- 11:14 DTunnels-3Q09-status edited by
- (diff)
- 11:13 DTunnels-3Q09-status edited by
- (diff)
- 11:13 DTunnels-3Q09-status edited by
- (diff)
- 11:11 DTunnels-3Q09-status edited by
- (diff)
- 11:11 DTunnels-3Q09-status edited by
- (diff)
- 11:08 DTunnels-3Q09-status created by
- 10:07 Milestone BGPMux: Virtual Network with BGPMux How-To -- completed
- Outreach Milestone: Produce a thorough how-to for use of the BGPMux & …
- 10:07 Ticket #184 (initial how-to draft available) closed by
- fixed: Updated draft available at …
09/09/09:
- 15:20 Integration edited by
- (diff)
- 14:45 Milestone MAX: Specific contribution to GENI outreach completed
- Specific contribution to GENI outreach plan for Spiral 1. …
- 14:44 Ticket #196 (MAX outreach) closed by
- fixed: Task completed. -------- Original Message -------- Subject: Re: Open …
- 14:43 Ticket #196 (MAX outreach) created by
- 8. Specific contribution to GENI outreach plan for Spiral 1. (1-12mo) …
- 13:26 DTunnels edited by
- (diff)
- 13:26 DTunnels edited by
- (diff)
09/08/09:
- 14:09 I2PoPKANS edited by
- (diff)
- 10:31 I2PoPKANS edited by
- (diff)
- 10:29 I2PoPKANS edited by
- (diff)
- 10:13 I2PoPKANS created by
- 10:03 I2PoPSALT edited by
- (diff)
- 10:01 I2PoPSALT edited by
- (diff)
- 09:02 Integration edited by
- (diff)
- 07:52 Integration edited by
- (diff)
09/07/09:
- 15:53 Integration edited by
- (diff)
- 14:26 Integration edited by
- (diff)
- 14:23 Integration edited by
- (diff)
- 12:52 PlanetLabBackbone edited by
- (diff)
- 12:50 PlanetLabBackbone edited by
- (diff)
- 12:50 PlanetLabBackbone edited by
- (diff)
09/04/09:
- 18:06 SpiralOne edited by
- add link to node Integration pages (diff)
- 17:54 PlanetLabBackbone edited by
- (diff)
- 17:54 ProtoGENIBackbone edited by
- (diff)
- 17:53 I2PoPSALT edited by
- (diff)
- 17:52 I2PoPWASH edited by
- (diff)
- 17:50 I2PoPWASH edited by
- (diff)
- 17:50 PlanetLabBackbone edited by
- (diff)
- 17:49 ProtoGENIBackbone edited by
- (diff)
- 17:49 Integration edited by
- (diff)
- 17:49 Integration edited by
- (diff)
- 17:47 I2PoPSALT edited by
- (diff)
- 17:42 I2PoPSALT created by
- 17:41 I2PoPWASH created by
- 17:40 ProtoGENIBackbone created by
- 17:39 PlanetLabBackbone created by
- 17:38 Integration created by
09/03/09:
- 16:09 DTunnels edited by
- (diff)
- 16:01 DTunnels edited by
- (diff)
- 08:54 ORCABEN edited by
- (diff)
- 08:52 ORCABEN edited by
- (diff)
09/02/09:
- 11:50 Ticket #195 (SALT install) created by
- The SALT installation began today (9/2/09) and is expected to finish …
09/01/09:
- 15:39 MillionNodeGENI edited by
- (diff)
- 15:32 Embedded Real-Time Measurements edited by
- (diff)
- 11:47 Milestone ERM: Support the GPO in developing an experimental use-case completed
- Support the GPO in developing an experimental use-case based on a …
08/28/09:
- 16:21 GpoDoc edited by
- (diff)
- 16:16 GpoDoc edited by
- (diff)
- 08:24 Milestone ENTGENI: Host OpenFlow workshop at Stanford completed
- Host an OpenFlow workshop at Stanford to educate university …
- 08:23 Ticket #194 (Complete OpenFlow workshop) closed by
- fixed
- 08:23 Ticket #194 (Complete OpenFlow workshop) created by
- Workshop was held on August 27, 28. It included public sessions and …
- 08:04 Ticket #175 (Schedule demo of EnterPrise GENI with PlanetLab.) closed by
- fixed
08/26/09:
08/24/09:
- 18:13 Milestone MillionNodeGeni: End-host resource advertisement and discovery function using RSpecs completed
- End-host resource advertisement and discovery function using RSpecs …
- 13:22 Milestone MAX: Integrate DRAGON/GENI control framework completed
- Integrate DRAGON/GENI control framework with DRAGON testbed (completed …
- 13:22 Milestone MAX: Integrate DRAGON/GRMS completed
- Integrate DRAGON/GRMS with candidate GENI control framework (completed …
- 13:22 Ticket #187 (Integrate DRAGON/GENI CF with DRAGON testbed) closed by
- fixed: Work is completed, modulo bugs in the PlanetLab GENI code. Work-around …
- 13:20 Ticket #186 (Integrate DRAGON with a GENI CF) closed by
- fixed: Work is completed, modulo bugs in the PlanetLab GENI code. Work-around …
08/21/09:
- 13:01 Ticket #169 (Work in progress for this report) closed by
- fixed
- 00:00 Milestone SECARCH: S1.c Revised Security Design Report completed
- Develop and incrementally revise and extend a series of pragmatic …
08/20/09:
- 16:22 Milestone TIED: S1.e Provide user access to DETER via TIED. completed
- Provide user access to DETER testbed using TIED building blocks (month …
- 14:12 Ticket #165 (Get feedback on GMOC internal data format from GENI projects) reopened by
- Reopening ticket to allow update from TIED.
- 13:46 Ticket #165 (Get feedback on GMOC internal data format from GENI projects) closed by
- fixed: Brief discussions took place with TIED at GEC5. TIED does not seem to …
- 13:09 TIEDClearinghouse edited by
- (diff)
- 11:25 Ticket #193 (MAX connection over I2 to ProtoGENI) created by
- MAX and ProtoGENI are now connected. See wiring diagram attached to …
- 00:06 Ticket #192 (Demonstrate VLAN connectivity to/from TIED testbeds.) created by
- Multiple statically configured VLANs providing an aggregate 1 Gbps …
08/19/09:
- 23:58 Ticket #108 (Provide information on prototype clearinghouse and where/how it will ...) closed by
- fixed
- 23:08 Ticket #109 (Identify GENI TIED release v 0.1) closed by
- fixed: PI added documentation on how fedd provides GENI clearinghouse and …
- 22:26 Ticket #191 (Verify that users are able to access DETER resources to run TIED ...) created by
- Use the documentation provided on TIEDClearinghouse wiki page to …
- 17:17 Ticket #64 (Operational Dataset discussion strawman from GMOC) closed by
- fixed: Brief discussions with GMOC staff, John Wroclawski and Ted Faber took …
- 16:40 Ticket #110 (Explain how GENI users can access DETER via TIED) closed by
- fixed: Documentation provided on 7/2/09 at …
- 13:40 Ticket #190 (MAX outreach) created by
- Coordinate with the University of Maryland’s Clark School of …
- 11:06 Ticket #189 (WASH I2 node install) created by
- ProtoGENI node is installed and reachable. Still testing wave …
- 10:49 Milestone ORBIT: 1c provide reference implementations of extended OMF software to WiMAX project completed
- c) Work with WiMAX base station project, agree on extended OMF …
- 10:44 Ticket #188 (Third SPP node shipped) created by
- KANS SPP node has been received and should be ready for install. …
- 10:34 Ticket #187 (Integrate DRAGON/GENI CF with DRAGON testbed) created by
- Deploy the DRAGON/GENI CF software in the DRAGON testbed
- 10:31 Ticket #186 (Integrate DRAGON with a GENI CF) created by
- Design and implement code to integrate DRAGON with a GENI control …
08/17/09:
- 16:49 Mid-Atlantic Crossroads edited by
- Co-PI Jarda Flidr has left the project (and MAX) (diff)
- 13:57 Milestone MAX: Make a working prototype completed
- Make a working prototype (tested) GENI (substrate and control …
- 13:32 Ticket #185 (Make prototype available to GENI researchers) closed by
- fixed: Chris Tracy posted the following offer to the GENI dev liston 8/14/09, …
- 13:32 Ticket #185 (Make prototype available to GENI researchers) created by
- Make a working prototype (tested) GENI (substrate and control …
- 13:30 Ticket #132 (MANFRED/MAX GEC5 demo) closed by
- fixed
08/14/09:
- 17:15 Mid-Atlantic Crossroads edited by
- (diff)
- 17:15 Mid-Atlantic Crossroads edited by
- (diff)
- 17:15 Mid-Atlantic Crossroads edited by
- (diff)
- 17:15 Mid-Atlantic Crossroads edited by
- (diff)
- 17:14 Mid-Atlantic Crossroads edited by
- (diff)
- 17:12 Mid-Atlantic Crossroads edited by
- (diff)
- 17:11 Mid-Atlantic Crossroads edited by
- (diff)
- 17:11 Mid-Atlantic Crossroads edited by
- (diff)
- 17:10 Mid-Atlantic Crossroads edited by
- (diff)
- 17:10 Mid-Atlantic Crossroads edited by
- (diff)
08/13/09:
- 09:50 GENISecurity edited by
- Add links for quarterly reports (diff)
08/12/09:
- 18:40 DigitalObjectRegistry edited by
- (diff)
- 18:04 Milestone MillionNodeGeni: Tutorial describing how to use the programming environment completed
- Tutorial is at https://seattle.cs.washington.edu/wiki/RepyTutorial …
- 17:52 Milestone CMU Lab: Merge patches into ProtoGENI distribution completed
- Task 8: Integrate ProtoGENI and Emulab patches back into main …
- 17:48 Ticket #34 (Initial CMULab code merged with ProtoGENI) closed by
- fixed
- 17:25 Milestone CMU Lab: integration of node-CMU and CMU-Utah tunnels completed
- Task 4: Data plane integration with ProtoGENI. Be able to run …
- 17:24 Ticket #127 (Dataplane tunnelling 4c) closed by
- fixed
- 17:20 Milestone CMU Lab: integrate with ProtoGENI control plane completed
- Task 5: ProtoGENI control plane integration (Limited federation): …
- 17:20 Ticket #124 (ProtoGENI control plane integration status) closed by
- fixed
- 17:16 Ticket #174 (confirm CMUlab control plane integration) closed by
- fixed
- 16:44 Proto-GENI-2Q09-status created by
- 16:34 ProtoGENI edited by
- (diff)
- 10:47 Ticket #184 (initial how-to draft available) created by
- The "how to" is also nearly ready. I've checked an early version of …
- 10:42 DTunnels edited by
- (diff)
- 10:41 Ticket #183 (Milestone date change) closed by
- fixed
- 10:40 DTunnels edited by
- (diff)
- 10:37 Ticket #183 (Milestone date change) created by
- The completion date was changed on this milestone from 6/1/09 to …
- 10:31 DTunnels edited by
- (diff)
- 10:30 Ticket #182 (Milestone revision for clarity, due date change) closed by
- fixed
- 10:28 Ticket #182 (Milestone revision for clarity, due date change) created by
- This ticket documents a revision to the milestone language. The …
- 10:20 DTunnels edited by
- (diff)
- 10:19 Ticket #74 (Extend ProtoGENI clearinghouse to support topology creation) closed by
- fixed: Milestone has been revised to focus on RSpec definition. Work will …
- 10:18 Ticket #181 (Define ProtoGENI RSpec for BGP Mux and tunnels) created by
- Rob (ProtoGENI) and Nick have started discussions on an RSpec …
- 10:15 Ticket #180 (Milestone revision for clarity, due date change) closed by
- fixed
- 10:12 Ticket #180 (Milestone revision for clarity, due date change) created by
- This ticket documents a revision to the milestone language. The …