Timeline



09/01/09:

15:39 MillionNodeGENI edited by Vic Thomas
(diff)
15:38 Rspec_format.pdf attached to MillionNodeGENI by Vic Thomas
Rspec design used by Million Node GENI
15:32 Embedded Real-Time Measurements edited by caroline@ee.columbia.edu
(diff)
15:13 GENI_MS6_ERM_Sept09_v1-0.pdf attached to Embedded Real-Time Measurements by caroline@ee.columbia.edu
ERM_2009 Milestone6
11:47 Milestone ERM: Support the GPO in developing an experimental use-case completed
Support the GPO in developing an experimental use-case based on a …

08/28/09:

16:21 GpoDoc edited by Vic Thomas
(diff)
16:16 GpoDoc edited by Vic Thomas
(diff)
08:24 Milestone ENTGENI: Host OpenFlow workshop at Stanford completed
Host an OpenFlow workshop at Stanford to educate university …
08:23 Ticket #194 (Complete OpenFlow workshop) closed by hdempsey@bbn.com
fixed
08:23 Ticket #194 (Complete OpenFlow workshop) created by hdempsey@bbn.com
Workshop was held on August 27, 28. It included public sessions and …
08:04 Ticket #175 (Schedule demo of EnterPrise GENI with PlanetLab.) closed by hdempsey@bbn.com
fixed

08/26/09:

14:41 CmuLab-2Q09-status created by Aaron Falk
14:36 CmuLab edited by Aaron Falk
(diff)
14:08 MAX2ProtoATWash.jpg attached to I2PoPWASH by Josh Karlin
MAX -- ProtoGENI connection at I2 WASH (thanks to Chris Tracy for diagram)
14:07 typical-dragon-node-diagram.png attached to I2PoPWASH by Josh Karlin
MAX Dragon node (from MAX GENI wiki)
14:07 typical-dragon-node-equipment.png attached to I2PoPWASH by Josh Karlin
MAX Dragon node (from MAX GENI wiki)
13:18 DTunnels edited by Aaron Falk
(diff)
12:37 SPP-Backbone-Node.jpg attached to I2PoPWASH by Josh Karlin
illustration thanks to SPP wiki
11:49 protogeni-backbone-node2.png attached to I2PoPWASH by Josh Karlin
Backbone ProtoGENI node (courtesy of ProtoGENI backbone node wiki)
11:49 protogeni-backbone-node.png attached to I2PoPWASH by Josh Karlin
Backbone ProtoGENI node (courtesy of ProtoGENI backbone node wiki)
10:37 ProtoGENI-Dells-back.jpg attached to I2PoPWASH by Josh Karlin
Back of ProtoGENI Dells (photo thanks to Chris Tracy)
10:37 ProtoGENI-Dells-front.jpg attached to I2PoPWASH by Josh Karlin
Front of ProtoGENI Dells (photo thanks to Chris Tracy)
10:37 ProtoGENI-ProCurve-front.jpg attached to I2PoPWASH by Josh Karlin
Front of ProtoGENI ProCurve switch (photo thanks to Chris Tracy)
10:22 spp-dell-front.jpg attached to I2PoPWASH by Josh Karlin
SPP Dell R200 Control Processor (thanks to Chris Tracy for the photo)
10:22 spp-netgear-front.jpg attached to I2PoPWASH by Josh Karlin
SPP Netgear switch (thanks to Chris Tracy)
10:21 spp-node-back.jpg attached to I2PoPWASH by Josh Karlin
SPP ATCA Back (Thanks to Chris Tracy)
10:21 spp-node-front.jpg attached to I2PoPWASH by Josh Karlin
Front of SPP ATCA (thanks to Chris Tracy)

08/24/09:

18:13 Milestone MillionNodeGeni: End-host resource advertisement and discovery function using RSpecs completed
End-host resource advertisement and discovery function using RSpecs …
17:22 I2WASHRACKS.jpg attached to I2PoPWASH by Josh Karlin
Centered view of the three I2 racks at WASH.
13:22 Milestone MAX: Integrate DRAGON/GENI control framework completed
Integrate DRAGON/GENI control framework with DRAGON testbed (completed …
13:22 Milestone MAX: Integrate DRAGON/GRMS completed
Integrate DRAGON/GRMS with candidate GENI control framework (completed …
13:22 Ticket #187 (Integrate DRAGON/GENI CF with DRAGON testbed) closed by Christopher Small
fixed: Work is completed, modulo bugs in the PlanetLab GENI code. Work-around …
13:20 Ticket #186 (Integrate DRAGON with a GENI CF) closed by Christopher Small
fixed: Work is completed, modulo bugs in the PlanetLab GENI code. Work-around …

08/21/09:

13:06 GENI-SEC-ARCH-0.55.pdf attached to GENISecurity by alefiya.hussain@sparta.com
Spiral One Security Architecture Report
13:01 Ticket #169 (Work in progress for this report) closed by alefiya.hussain@sparta.com
fixed
00:00 Milestone SECARCH: S1.c Revised Security Design Report completed
Develop and incrementally revise and extend a series of pragmatic …

08/20/09:

16:22 Milestone TIED: S1.e Provide user access to DETER via TIED. completed
Provide user access to DETER testbed using TIED building blocks (month …
14:12 Ticket #165 (Get feedback on GMOC internal data format from GENI projects) reopened by hdempsey@bbn.com
Reopening ticket to allow update from TIED.
13:46 Ticket #165 (Get feedback on GMOC internal data format from GENI projects) closed by hdempsey@bbn.com
fixed: Brief discussions took place with TIED at GEC5. TIED does not seem to …
13:09 TIEDClearinghouse edited by faber@isi.edu
(diff)
11:25 Ticket #193 (MAX connection over I2 to ProtoGENI) created by Josh Karlin
MAX and ProtoGENI are now connected. See wiring diagram attached to …
00:06 Ticket #192 (Demonstrate VLAN connectivity to/from TIED testbeds.) created by hdempsey@bbn.com
Multiple statically configured VLANs providing an aggregate 1 Gbps …

08/19/09:

23:58 Ticket #108 (Provide information on prototype clearinghouse and where/how it will ...) closed by hdempsey@bbn.com
fixed
23:08 Ticket #109 (Identify GENI TIED release v 0.1) closed by hdempsey@bbn.com
fixed: PI added documentation on how fedd provides GENI clearinghouse and …
22:26 Ticket #191 (Verify that users are able to access DETER resources to run TIED ...) created by hdempsey@bbn.com
Use the documentation provided on TIEDClearinghouse wiki page to …
17:17 Ticket #64 (Operational Dataset discussion strawman from GMOC) closed by hdempsey@bbn.com
fixed: Brief discussions with GMOC staff, John Wroclawski and Ted Faber took …
16:40 Ticket #110 (Explain how GENI users can access DETER via TIED) closed by hdempsey@bbn.com
fixed: Documentation provided on 7/2/09 at …
13:40 Ticket #190 (MAX outreach) created by Christopher Small
Coordinate with the University of Maryland’s Clark School of …
11:06 Ticket #189 (WASH I2 node install) created by Josh Karlin
ProtoGENI node is installed and reachable. Still testing wave …
10:49 Milestone ORBIT: 1c provide reference implementations of extended OMF software to WiMAX project completed
c) Work with WiMAX base station project, agree on extended OMF …
10:44 Ticket #188 (Third SPP node shipped) created by Josh Karlin
KANS SPP node has been received and should be ready for install. …
10:34 Ticket #187 (Integrate DRAGON/GENI CF with DRAGON testbed) created by Christopher Small
Deploy the DRAGON/GENI CF software in the DRAGON testbed
10:31 Ticket #186 (Integrate DRAGON with a GENI CF) created by Christopher Small
Design and implement code to integrate DRAGON with a GENI control …

08/17/09:

16:49 Mid-Atlantic Crossroads edited by Christopher Small
Co-PI Jarda Flidr has left the project (and MAX) (diff)
13:57 Milestone MAX: Make a working prototype completed
Make a working prototype (tested) GENI (substrate and control …
13:32 Ticket #185 (Make prototype available to GENI researchers) closed by Christopher Small
fixed: Chris Tracy posted the following offer to the GENI dev liston 8/14/09, …
13:32 Ticket #185 (Make prototype available to GENI researchers) created by Christopher Small
Make a working prototype (tested) GENI (substrate and control …
13:30 Ticket #132 (MANFRED/MAX GEC5 demo) closed by Christopher Small
fixed

08/14/09:

17:16 network-substrate-with-plab-and-netfpga.png attached to Mid-Atlantic Crossroads by chris@maxgigapop.net
Washington DC metro area footprint showing PlanetLab and NetFPGA nodes
17:15 Mid-Atlantic Crossroads edited by chris@maxgigapop.net
(diff)
17:15 Mid-Atlantic Crossroads edited by chris@maxgigapop.net
(diff)
17:15 Mid-Atlantic Crossroads edited by chris@maxgigapop.net
(diff)
17:15 Mid-Atlantic Crossroads edited by chris@maxgigapop.net
(diff)
17:14 Mid-Atlantic Crossroads edited by chris@maxgigapop.net
(diff)
17:14 typical_dragon_node_physical.png attached to Mid-Atlantic Crossroads by chris@maxgigapop.net
Typical DRAGON core node physical
17:12 Mid-Atlantic Crossroads edited by chris@maxgigapop.net
(diff)
17:12 typical_DRAGON_core_node_block_diagram.2.png attached to Mid-Atlantic Crossroads by chris@maxgigapop.net
Typical DRAGON core node block diagram
17:11 Mid-Atlantic Crossroads edited by chris@maxgigapop.net
(diff)
17:11 Mid-Atlantic Crossroads edited by chris@maxgigapop.net
(diff)
17:10 Mid-Atlantic Crossroads edited by chris@maxgigapop.net
(diff)
17:10 Mid-Atlantic Crossroads edited by chris@maxgigapop.net
(diff)

08/13/09:

09:50 GENISecurity edited by hdempsey@bbn.com
Add links for quarterly reports (diff)
09:32 SPARTA-GSAT-Jun2009.doc attached to GENISecurity by hdempsey@bbn.com
third quarterly report
09:31 SPARTA-GSAT-Mar2009.doc attached to GENISecurity by hdempsey@bbn.com
second quarterly report

08/12/09:

18:40 DigitalObjectRegistry edited by Vic Thomas
(diff)
18:38 DOA-for-ExperimenterTools.pdf attached to DigitalObjectRegistry by Vic Thomas
Milestone deliverable: Use of DOA by Experimenter Tools & Svcs
18:04 Milestone MillionNodeGeni: Tutorial describing how to use the programming environment completed
Tutorial is at https://seattle.cs.washington.edu/wiki/RepyTutorial
17:52 Milestone CMU Lab: Merge patches into ProtoGENI distribution completed
Task 8: Integrate ProtoGENI and Emulab patches back into main …
17:48 Ticket #34 (Initial CMULab code merged with ProtoGENI) closed by Aaron Falk
fixed
17:25 Milestone CMU Lab: integration of node-CMU and CMU-Utah tunnels completed
Task 4: Data plane integration with ProtoGENI. Be able to run …
17:24 Ticket #127 (Dataplane tunnelling 4c) closed by Aaron Falk
fixed
17:20 Milestone CMU Lab: integrate with ProtoGENI control plane completed
Task 5: ProtoGENI control plane integration (Limited federation): …
17:20 Ticket #124 (ProtoGENI control plane integration status) closed by Aaron Falk
fixed
17:16 Ticket #174 (confirm CMUlab control plane integration) closed by Aaron Falk
fixed
16:44 Proto-GENI-2Q09-status created by Aaron Falk
16:34 ProtoGENI edited by Aaron Falk
(diff)
10:47 Ticket #184 (initial how-to draft available) created by Aaron Falk
The "how to" is also nearly ready. I've checked an early version of …
10:42 DTunnels edited by Aaron Falk
(diff)
10:41 Ticket #183 (Milestone date change) closed by Aaron Falk
fixed
10:40 DTunnels edited by Aaron Falk
(diff)
10:37 Ticket #183 (Milestone date change) created by Aaron Falk
The completion date was changed on this milestone from 6/1/09 to …
10:31 DTunnels edited by Aaron Falk
(diff)
10:30 Ticket #182 (Milestone revision for clarity, due date change) closed by Aaron Falk
fixed
10:28 Ticket #182 (Milestone revision for clarity, due date change) created by Aaron Falk
This ticket documents a revision to the milestone language. The …
10:20 DTunnels edited by Aaron Falk
(diff)
10:19 Ticket #74 (Extend ProtoGENI clearinghouse to support topology creation) closed by Aaron Falk
fixed: Milestone has been revised to focus on RSpec definition. Work will …
10:18 Ticket #181 (Define ProtoGENI RSpec for BGP Mux and tunnels) created by Aaron Falk
Rob (ProtoGENI) and Nick have started discussions on an RSpec …
10:15 Ticket #180 (Milestone revision for clarity, due date change) closed by Aaron Falk
fixed
10:12 Ticket #180 (Milestone revision for clarity, due date change) created by Aaron Falk
This ticket documents a revision to the milestone language. The …

08/11/09:

14:17 Ticket #179 (Provide plan for making Aggregate Manager externally accessible in ...) created by hdempsey@bbn.com
Phase 0 deployment should include an Aggregate Manager that …
14:05 Ticket #178 (schedule workshop) closed by hdempsey@bbn.com
fixed
14:01 Ticket #178 (schedule workshop) created by hdempsey@bbn.com
Enterprise GENI Campus Trials Workshop has been scheduled for August …
13:51 Ticket #177 (complete timeline and plan for intgration between EntGENI and GENI ...) created by hdempsey@bbn.com
Please provide your plan for completing this ongoing integration task. …
13:39 Ticket #176 (Document plan for VLAN integration) created by hdempsey@bbn.com
Please document your plans for Ethernet VLAN integration on the GENI …
13:26 Ticket #175 (Schedule demo of EnterPrise GENI with PlanetLab.) created by hdempsey@bbn.com
A demonstration of Enterprise GENI OpenFlow switches with a GENI …

08/07/09:

10:49 GpENI edited by Christopher Small
(diff)

08/06/09:

15:26 Ticket #174 (confirm CMUlab control plane integration) created by Aaron Falk
Get someone from Utah to confirm this works
13:16 Mid-Atlantic Crossroads edited by Christopher Small
(diff)
13:13 GPO_QReport_June09.pdf attached to Mid-Atlantic Crossroads by Christopher Small

08/05/09:

17:35 sppReport-2Q09 edited by hdempsey@bbn.com
Add picture to report (diff)
15:07 SPPfolks1.jpg attached to sppReport-2Q09 by hdempsey@bbn.com
SPP Team photo from Jon Turner 7/1/2009

08/04/09:

18:11 ClusterD edited by hmussman@bbn.com
(diff)
18:09 DOME edited by hmussman@bbn.com
(diff)
18:08 DOME edited by hmussman@bbn.com
(diff)
10:39 Ticket #106 (milestone 1f completion) closed by hmussman@bbn.com
fixed
10:35 Ticket #105 (milestone 1e completion) closed by hmussman@bbn.com
fixed

08/03/09:

18:35 Milestone DigitalObjectRegistry: Plan to use Digital Object Architecture for experimenter tools and services. completed
Analyze the experiment control projects being funded for GENI Spiral …
16:20 Ticket #173 (Second SPP node preparing to ship) created by hdempsey@bbn.com
Second installation will be in Salt Lake City in early September. …
15:52 Ticket #6 (Document I2 network engineering plan) closed by hdempsey@bbn.com
fixed: SPP and ProtoGENI have updated their plans, as presented at GEC5 clusters.
12:13 Milestone ProvisioningService: Release v2.0 completed
Release 2.0 of Raven is available at …
11:15 Milestone ProvisioningService: Add monitoring support completed
The Raven tool suite now includes a prototype of "Owl", a service that …
11:08 Milestone ProvisioningService: Integrate resource discovery and selection completed
Raven now supports resource discovery and selection via CoMon …

08/02/09:

15:35 Milestone MillionNodeGeni: Specification for RSpecs for VM resources completed
Specification for RSpecs for VM resources.
Note: See TracTimeline for information about the timeline view.