05/12/09:
- 23:21 DigitalObjectRegistry edited by
- (diff)
- 23:16 DigitalObjectRegistry edited by
- (diff)
- 23:06 Milestone DigitalObjectRegistry: Plan to meet registry needs of at least one control framework. completed
- Analyze the five control framework clusters being funded for GENI …
- 23:06 Ticket #61 (Develop, write up and post to wiki plan for developing a registry that ...) closed by
- fixed
- 16:02 Milestone MeasurementSys: S1.d Basic instrumentation and measurement test suites - completed
- Develop basic instrumentation and measurement test suites for …
- 16:01 Milestone MeasurementSys: S1.c Repository system design specification - completed
- Develop repository system design specification and distribute via …
- 16:01 Milestone MeasurementSys: S1.b Measurement system design specification - completed
- Develop measurement system design specification and distribute via …
- 15:55 Milestone MeasurementSys: S1.a System interface design specification - completed
- Develop system interface design specification and distribute via …
- 14:29 WikiStart edited by
- Update wiki information text (diff)
- 14:03 Internet Scale Overlay Hosting edited by
- fix typo in milestone (diff)
- 09:07 041409NYCOptInWGAgenda edited by
- (diff)
- 09:03 GeniOptIn edited by
- (diff)
- 08:57 GeniControl edited by
- (diff)
05/11/09:
- 18:04 Ticket #43 (Million Node GENI demo at GEC 4) closed by
- fixed: Demo completed on 3/31/09.
- 18:03 Ticket #50 (ProtoGENI demo at GEC#4) closed by
- fixed: Demo completed 3/31/09.
- 18:01 Ticket #46 (Kansei DEMO) closed by
- fixed: Demo completed 3/31/09
- 16:42 DOMEControllerModule edited by
- (diff)
- 16:41 DOMEControllerModule edited by
- (diff)
- 16:40 DOMEControllerModule edited by
- (diff)
- 16:39 DOMEControllerModule edited by
- (diff)
- 16:38 DOMEControllerModule edited by
- (diff)
- 16:35 DOMEControllerModule created by
- 16:34 DOME edited by
- (diff)
- 16:30 DOME edited by
- (diff)
- 09:28 Ticket #30 (Request feedback on strawman operational dataset from ORCA control ...) closed by
- fixed: Jeff spoke to the GMOC folks, as discussed in the GMOC quarterly …
- 09:22 Ticket #63 (CMU Demo at GEC4) closed by
- fixed: Demo held 3/31/09.
- 09:22 Ticket #60 (PlanetLab Demo for GEC4) closed by
- fixed: Demo held 3/31/09.
- 09:21 Ticket #59 (MANFRED GEC4 demo: initial integration of dynamic circuits into the ...) closed by
- fixed: Demo held 3/31/09.
- 09:21 Ticket #57 (WiMAX GEC4 Demo) closed by
- fixed: Demo held 3/31/09.
- 09:20 Ticket #56 (ORBIT GEC4 Demo) closed by
- fixed: Demo held 3/31/09.
- 09:20 Ticket #55 (DTunnels Demo) closed by
- fixed: Demo held 3/31/09.
- 09:19 Ticket #54 (Gush demo) closed by
- fixed: Demo held 3/31/09.
- 09:18 Ticket #52 (GpENI demo at GEC4) closed by
- fixed: Demo held 3/31/09.
- 09:18 Ticket #51 (UMLPEN Demo at GEC4) closed by
- fixed: Demo held 3/31/09.
- 09:17 Ticket #48 (DOME demo) closed by
- fixed: Demo held 3/31/09.
- 09:16 Ticket #49 (ViSE GEC4 Demonstration) closed by
- fixed: Demo held 3/31/09.
- 09:16 Ticket #47 (ORCA-BEN vlan demo) closed by
- fixed: Demo held 3/31/09.
- 09:15 Ticket #45 (GEC4 Demonstration Plans for Washington University SPP Node) closed by
- fixed: Demo Held 3/31/09.
- 09:14 Ticket #42 (Raven demo at GEC4) closed by
- fixed: Demo held 3/31/09.
- 08:10 Ticket #36 (Plan for GEC4 demonstrations.) closed by
- fixed
- 06:35 GeniSubstrate edited by
- (diff)
05/08/09:
- 15:44 GpoDoc edited by
- (diff)
- 15:44 ExperimentLifecycleDocument edited by
- (diff)
- 14:58 Mid-Atlantic Crossroads edited by
- (diff)
- 13:56 NetworkRSpecMiniWorkshop edited by
- (diff)
- 11:13 ViSE edited by
- (diff)
- 11:12 ViSE edited by
- (diff)
05/07/09:
- 22:05 MeasurementSystem edited by
- (diff)
- 22:04 MeasurementSystem edited by
- (diff)
- 21:56 AprilQSR created by
- 21:54 MeasurementSystem edited by
- (diff)
05/06/09:
- 14:07 KanseiSensorNet edited by
- (diff)
- 13:10 KanseiSensorNet edited by
- (diff)
- 11:47 Ticket #96 (milestone 1a completion) closed by
- fixed
- 11:26 KanseiSensorNet edited by
- (diff)
- 11:24 KanseiSensorNet edited by
- (diff)
- 11:23 KanseiSensorNet edited by
- (diff)
05/05/09:
- 17:45 ViSE edited by
- (diff)
- 17:45 Ticket #106 (milestone 1f completion) created by
- Per 1Q09 QSR: As shown by our demonstration at GEC4, we have made …
- 17:40 ViSE edited by
- (diff)
- 17:40 Ticket #105 (milestone 1e completion) created by
- Per 1Q09 QSR: The second milestone requires us to import an updated …
- 17:30 ViSE edited by
- (diff)
- 17:29 ViSE edited by
- (diff)
- 17:27 ViSE edited by
- (diff)
- 17:27 Ticket #104 (milestone 1d completion) created by
- Per 1Q09 QSR: Milestone 4. [M4] Operational web portal and testbed, …
- 17:23 ViSE edited by
- (diff)
- 17:18 ViSE edited by
- (diff)
- 17:14 ViSE edited by
- (diff)
- 17:14 ViSE edited by
- (diff)
- 17:03 ViSE edited by
- (diff)
- 16:53 ViSE edited by
- (diff)
- 16:49 ViSE edited by
- (diff)
- 16:44 ViSE edited by
- (diff)
- 16:39 ViSE edited by
- (diff)
- 16:22 ViSE edited by
- (diff)
- 16:22 ViSE edited by
- (diff)
- 16:20 ViSE edited by
- (diff)
- 16:11 ViSE edited by
- (diff)
- 16:09 ViSE edited by
- (diff)
- 16:05 ViSE edited by
- (diff)
- 15:31 ViSE edited by
- (diff)
- 15:25 ViSE edited by
- (diff)
- 15:19 ViSE edited by
- (diff)
- 15:19 ViSE edited by
- (diff)
- 15:17 ViSE edited by
- (diff)
- 15:16 ViSE edited by
- (diff)
- 15:15 ViSE edited by
- (diff)
- 14:52 ViSE edited by
- (diff)
- 14:51 ViSE edited by
- (diff)
- 14:47 ViSE edited by
- (diff)
- 14:44 ViSE edited by
- (diff)
- 14:42 ViSE edited by
- (diff)
- 13:56 DOME edited by
- (diff)
- 13:54 NetworkRSpecMiniWorkshop edited by
- (diff)
- 13:54 DOME edited by
- (diff)
- 13:53 NetworkRSpecMiniWorkshop edited by
- (diff)
- 13:53 Ticket #103 (milestone 1d completion) created by
- Per 1Q09 QSR, work started on milestone 1d: The emphasis of our work …
- 13:52 Ticket #102 (milestone 1c completion) created by
- Per 1Q09 QSR, work started on milestone 1c: The emphasis of our work …
- 13:39 DOME edited by
- (diff)
- 13:35 DOME edited by
- (diff)
- 13:32 NetworkRSpecMiniWorkshop edited by
- (diff)
- 13:30 DOME edited by
- (diff)
- 13:24 DOME edited by
- (diff)
- 13:06 DOME edited by
- (diff)
- 06:45 WikiStart edited by
- (diff)
05/04/09:
- 22:52 Milestone ProvisioningService: Release v1.0 completed
- Release v1.0, including documentation, and make available for download …
- 22:51 Milestone ProvisioningService: Support for GENI slice management completed
- Add support for GENI slice management. Stork now supports slice …
- 22:49 Milestone ProvisioningService: Port Stork to GENI environment completed
- Port Stork to GENI environment. The Stork repository now supports …
- 17:52 NetworkRSpecMiniWorkshop created by
- 15:04 ORCABEN edited by
- (diff)
- 15:03 ORCABEN edited by
- (diff)
- 15:01 ORCABEN edited by
- (diff)
- 15:00 Ticket #101 (milestone 1f completion) created by
- Per 1Q09 QSR: GPO Architectural discussions Held a number of …
- 14:57 Ticket #96 (milestone 1a completion) reopened by
- 14:57 ORCABEN edited by
- (diff)
- 14:56 Ticket #100 (milestone 1e completion) created by
- Per 1Q09 QSR: BEN Deployed equipment into NCSU and UNC‐CH BEN PoPs? …
- 14:48 ORCABEN edited by
- (diff)
- 14:47 Ticket #99 (milestone 1d completion) created by
- Per 1Q09 QSR: Extend ORCA as a GENI Control Framework Deployed ORCA …
- 14:40 ORCABEN edited by
- (diff)
- 14:40 Ticket #98 (milestone 1c completion) created by
- Per 1Q09 QSR: NDL Completed NDL schema design as well as BEN …
- 14:36 Ticket #97 (milestone 1b completion) closed by
- fixed
- 14:35 ORCABEN edited by
- (diff)
- 14:34 Ticket #97 (milestone 1b completion) created by
- Per 1Q09 QSR: Code release Released a buildable version of ORCA code …
- 14:30 ORCABEN edited by
- (diff)
- 14:29 Ticket #96 (milestone 1a completion) closed by
- fixed
- 14:29 Ticket #96 (milestone 1a completion) created by
- Per 1Q09 QSR, completed 3/31/09: Extend ORCA as a GENI Control …
- 14:26 ORCABEN edited by
- (diff)
- 14:20 ORCABEN edited by
- (diff)
- 14:18 ORCABEN edited by
- (diff)
- 14:18 ORCABEN edited by
- (diff)
- 13:57 ORCABEN edited by
- (diff)
- 13:57 ORCABEN edited by
- (diff)
- 13:55 ORCABEN edited by
- (diff)
- 11:51 Milestone MillionNodeGeni: Reference implementation of a trivial experiment manager completed
- Reference implementation of a trivial experiment manager (a test …
- 11:50 Milestone MillionNodeGeni: Reference implementation of end-host Node Manager completed
- Reference implementation of end-host component for managing …
05/02/09:
- 14:24 Milestone ERM: Develop a software architecture completed
- Develop a software architecture based on GENI real-time measurement …
05/01/09:
- 17:28 Milestone ViSE: S1.c2 Complete initial Shirako/ORCA integration- completed
- 1c2 [M3] Complete Shirako/ORCA integration. Install Xen and Shirako …
- 13:26 WiMAX edited by
- (diff)
- 13:26 Ticket #95 (milestone 1e completion) created by
- From 1Q09 QSR: Deliverables made: D1. Demonstration of WiMAX base …
- 13:23 WiMAX edited by
- (diff)
- 13:22 Ticket #94 (milestone 1c completion) closed by
- fixed
- 13:22 Ticket #94 (milestone 1c completion) created by
- From 1Q09 QSR: Task 4. System-level integration with OMF/GENI control …
- 13:14 WiMAX edited by
- (diff)
- 13:13 WiMAX edited by
- (diff)
- 13:12 Ticket #93 (milestone 1b completion) closed by
- fixed
- 13:12 Ticket #93 (milestone 1b completion) created by
- From 1Q09 QSR: Task 3. Base Station API software 3.1 Initial open API …
- 13:02 WiMAX edited by
- (diff)
- 13:01 WiMAX edited by
- (diff)
- 12:59 WiMAX edited by
- (diff)
- 12:52 ORBIT edited by
- (diff)
- 12:51 ORBIT edited by
- (diff)
- 12:50 ORBIT edited by
- (diff)
- 12:15 ORBIT edited by
- (diff)
- 12:14 Ticket #92 (milestone 1f completion) created by
- From 1Q09 QSR: - Released an external website dedicated to OMF, its …
- 12:12 ORBIT edited by
- (diff)
- 12:11 Ticket #91 (milestone 1d completion) created by
- Layer 2 connectivity WINLAB will connect layer 2 to MAGPI East in …
- 12:08 ORBIT edited by
- (diff)
- 12:06 Ticket #90 (milestone 1c completion) created by
- From 1Q09 QSR: Integrating OMF with WIMAX Basestation The GEC …
- 12:00 ORBIT edited by
- (diff)
- 11:59 Ticket #89 (milestone 1e completion) closed by
- fixed
- 11:59 Ticket #89 (milestone 1e completion) created by
- Per 1Q09 QSR, completed 3/31/09: We have achieved the following …
- 11:57 ORBIT edited by
- (diff)
- 11:56 Ticket #88 (milesrone 1b completion) closed by
- fixed
- 11:56 Ticket #88 (milesrone 1b completion) created by
- Per 1Q09 QSR, completed 3/31/09: We have achieved the following …
- 11:53 ORBIT edited by
- (diff)
- 11:52 Ticket #87 (milestone 1a completion) closed by
- fixed
- 11:52 Ticket #87 (milestone 1a completion) created by
- Per 1Q09 QSR, completed 3/31/09: We have achieved the following …
- 11:33 ORBIT edited by
- (diff)
- 11:29 ORBIT edited by
- (diff)
- 11:23 ORBIT edited by
- (diff)
- 11:15 WiMAX edited by
- (diff)
- 10:23 WiMAX edited by
- (diff)
- 10:21 WiMAX edited by
- (diff)
- 10:21 WiMAX edited by
- (diff)
- 10:17 WiMAX edited by
- (diff)
- 09:53 ORBIT edited by
- (diff)
- 09:51 ORBIT edited by
- (diff)
- 09:50 ORBIT edited by
- (diff)
- 09:50 ORBIT edited by
- (diff)
04/30/09:
- 21:18 Milestone KANSEI: 1a Import a GENI-compliant control framework based on ORCA completed
- a) Import and setup a GENI-compliant control framework based on ORCA, …
- 17:21 ORBIT edited by
- (diff)
- 17:20 ORBIT edited by
- (diff)
- 17:19 ORBIT edited by
- (diff)
- 17:19 ORBIT edited by
- (diff)
- 17:19 ORBIT edited by
- (diff)
- 17:18 ORBIT edited by
- (diff)
- 17:15 ORBIT edited by
- (diff)
- 17:15 ORBIT edited by
- (diff)
- 17:12 ORBIT edited by
- (diff)
- 17:11 ORBIT edited by
- (diff)
- 16:43 GeniOmisUseIntro edited by
- (diff)
- 16:39 ORBIT edited by
- (diff)
- 16:38 ORBIT edited by
- (diff)
- 16:36 ORBIT edited by
- (diff)
- 16:33 ORBIT edited by
- (diff)
- 16:32 ORBIT edited by
- (diff)
- 16:31 ORBIT edited by
- (diff)
- 16:30 ORBIT edited by
- (diff)
- 16:28 ORBIT edited by
- (diff)
- 16:27 ORBIT edited by
- (diff)
- 16:20 ORBIT edited by
- (diff)
- 16:17 ORBIT edited by
- (diff)
- 16:16 WiMAX edited by
- minor url cleanup (diff)
- 16:15 ORBIT edited by
- (diff)
- 14:23 OldGPGDesignDocuments edited by
- (diff)
- 14:21 OldGPGDesignDocuments edited by
- (diff)
- 14:16 GMCSpec edited by
- (diff)
- 14:14 GMCSpec edited by
- (diff)
- 14:12 GMCSpec edited by
- (diff)
- 14:12 GMCSpec edited by
- (diff)
- 14:11 GMCSpec edited by
- (diff)
- 14:09 GMCSpec created by
- 14:06 OldGPGDesignDocuments edited by
- (diff)
- 13:50 OldGENIPlanningGroup edited by
- (diff)
- 13:44 OldGPGDesignDocuments edited by
- add link to Old GENI Plannign Group info (diff)
- 12:57 WikiStart edited by
- (diff)
- 12:56 OldGENIPlanningGroup created by
- 12:38 Gec4Agenda edited by
- add pointer to current information (diff)
- 12:32 OldGPGDesignDocuments created by
- 12:32 OldGPGTimeline created by
- 12:32 OldGPGResearchChallenges created by
- 12:31 presentations edited by
- (diff)
- 12:30 OldGPGResearchQuestions created by
- 12:30 presentations edited by
- add pointer to updated information (diff)
- 12:30 OldGPGResearchSuccess created by
- 12:29 OldGPGGoals created by
- 12:29 OldGPGRequirements created by
- 12:29 WikiStart edited by
- (diff)
- 12:29 OldGPGSnapshot created by
- 12:28 OldGPGCommunityDiscussion created by
- 12:28 GEC2 edited by
- (diff)
- 12:27 OldGPGCommunityMeetings created by
- 12:27 OldGPGCommunityGroups created by
- 12:27 OldGPGCommunityParticipation created by
- 12:26 OldGPGReferencesSchedule created by
- 12:26 GEC1 edited by
- Add pointer to up-to-date info (diff)
- 12:26 OldGPGReferencesDevelopment created by
- 12:25 OldGPGReferencesLinks created by
- 12:00 GENITechCoordMeeting created by
- 11:27 OtherMeetings edited by
- (diff)
- 11:11 OtherMeetings created by
- 11:11 GENITransitionFacilityArch created by
- 11:10 GENITransitionProjectManagement created by
- 11:10 GENITransitionDistributed created by
- 11:10 GENITransitionMobile created by
- 11:09 GENITransitionBackbone created by
- 11:08 GENIOpticalWorkshop created by
- 11:04 WikiStart edited by
- (diff)
- 10:48 GEC1 created by
- 10:48 GEC2 created by
- 10:41 WikiStart edited by
- move link to old GENI design documents from geni.net to geni wiki (diff)
- 10:34 WikiStart edited by
- change GEC1 archives to point to wiki pages (diff)
- 09:10 GeniOptIn edited by
- (diff)
04/29/09:
- 18:43 Gec4presentations edited by
- (diff)
- 18:40 presentations edited by
- (diff)
- 18:39 presentations edited by
- (diff)
- 18:38 presentations edited by
- add content note on presentations (diff)
- 16:35 MillionNodeGENI edited by
- (diff)
- 16:24 April09QSR created by
- 16:23 ProvisioningService edited by
- (diff)
- 13:49 WikiStart edited by
- (diff)
- 13:48 WikiStart edited by
- (diff)
- 13:43 WikiStart edited by
- (diff)
- 13:42 WikiStart edited by
- (diff)
- 13:41 SpiralOne edited by
- (diff)
- 13:40 GpoDoc edited by
- (diff)
- 13:40 SpiralOne edited by
- (diff)
- 13:36 GeniWorkingGroups edited by
- (diff)
- 13:34 GeniWorkingGroups edited by
- (diff)
- 13:33 GpoDoc edited by
- (diff)
- 13:25 GpoDoc edited by
- (diff)
- 13:22 GeniWorkingGroupDoc edited by
- (diff)
- 13:22 GeniWorkingGroupDoc edited by
- (diff)
- 13:21 GeniWorkingGroupDoc created by
- 13:18 WikiStart edited by
- (diff)
- 13:08 GeniSysOvrvw edited by
- (diff)
- 13:06 GeniSysOvrvw created by
- 12:25 GushProto edited by
- (diff)
- 12:24 GushProto edited by
- (diff)
- 12:17 DigitalObjectRegistry edited by
- (diff)
- 12:11 DigitalObjectRegistry edited by
- (diff)
04/28/09:
- 16:29 GeniOmisGEC1Notes created by
- OMIS WG first meeting notes
- 16:28 GeniOmis edited by
- Add link to GEC1 OMIS meeting notes (diff)
04/27/09:
04/24/09:
- 16:22 CmuLab edited by
- Add link to homenet overview (diff)
- 15:42 CmuLab edited by
- (diff)
- 15:33 Milestone CMU Lab: IP-in-IP encap from CMU-Control to Homenet nodes completed
- Task 4: Data plane integration with ProtoGENI. Be able to run …
- 15:33 Ticket #82 (Update CMU Milestone #1) closed by
- fixed: The discusion above has been placed into the project wiki page.
- 15:26 CmuLab edited by
- (diff)
- 15:22 Ticket #58 (Need additional configuration documentation) closed by
- fixed: Config notes have been posted on project wiki page.
- 15:21 CmuLab edited by
- (diff)
- 15:17 Milestone CMU Lab: Tunneling packets from Utah to CMU completed
- Task 4: Data plane integration with ProtoGENI. Be able to run …
- 15:16 Ticket #3 (Bring up OpenVPN tunnels between CMU Lab and ProtoGENI) closed by
- fixed
- 15:15 CmuLab edited by
- (diff)
- 09:37 CmuLab edited by
- (diff)
- 00:00 Milestone CMU Lab: desired node config & boot mgmt functionality completed
- Task 1: Node configuration and boot management. Configure software …
04/23/09:
- 15:52 CmuLab-1Q09-status created by
- 15:48 CmuLab edited by
- (diff)
- 15:40 CmuLab edited by
- (diff)
- 15:35 Milestone CMU Lab: Deploy and commence operations of 5 residential HomeNet nodes completed
- This is done. We have 3 intel lab systems, one in the Andersen home, …
- 15:34 Ticket #62 (Complete bringing 5 HomeNet nodes up) closed by
- fixed
- 14:57 Ticket #86 (Status update for task 6: Emulator user interface integration) created by
- This milestone is three weeks late. Todo: * Update with current …
- 14:44 CmuLab edited by
- (diff)
- 14:44 CmuLab edited by
- (diff)
- 14:19 Ticket #85 (modify milestone to add an extra protoGENI node to I2 in Spiral 1) closed by
- fixed
- 14:14 Ticket #85 (modify milestone to add an extra protoGENI node to I2 in Spiral 1) created by
- ProtoGENI will install and support an additional ProtoGENI node in I2 …
04/22/09:
- 15:16 ViSE edited by
- Fix broken .tiff picture (diff)
- 14:03 ViSE edited by
- (diff)
- 13:05 Ticket #84 (Duplicate task?) closed by
- invalid
- 13:00 CmuLab edited by
- (diff)
- 12:54 Ticket #81 (Update CMU Milestone #1) closed by
- invalid
- 12:43 Ticket #83 (Status of ticket) closed by
- invalid
- 10:15 ViSE edited by
- (diff)
- 09:56 GENIMetaOps edited by
- (diff)
04/21/09:
- 17:25 ProtoGENI-1Q09-status edited by
- (diff)
- 17:24 ProtoGENI-1Q09-status edited by
- (diff)
- 17:20 ProtoGENI-1Q09-status edited by
- (diff)
- 17:16 ProtoGENI-1Q09-status created by
- 16:52 ProtoGENI edited by
- (diff)
- 16:48 GeniWikiGettingStarted edited by
- Add text on milestones and tickets (diff)
- 16:40 SpiralOne edited by
- (diff)
- 16:37 MilestonesAndTickets edited by
- (diff)
- 16:33 ProtoGENI edited by
- (diff)
- 16:03 MilestonesAndTickets edited by
- (diff)
- 16:01 MilestonesAndTickets created by
- 15:19 Ticket #78 (Temporary tunnels in use for CMU lab) closed by
- invalid
- 14:08 PlanetLab-1Q09-status edited by
- (diff)
- 14:05 PlanetLab-1Q09-status created by
- 14:00 PlanetLab edited by
- (diff)
- 11:32 ProgrammableEdgeNode edited by
- (diff)
- 11:31 ProgrammableEdgeNode edited by
- (diff)
- 11:20 ProgrammableEdgeNode edited by
- (diff)
- 11:20 ProgrammableEdgeNode edited by
- (diff)
- 11:19 ProgrammableEdgeNode edited by
- (diff)
- 11:17 ProgrammableEdgeNode edited by
- (diff)
- 11:15 ProgrammableEdgeNode edited by
- (diff)
- 11:10 ProgrammableEdgeNode edited by
- (diff)
- 11:09 ProgrammableEdgeNode edited by
- (diff)
- 11:08 ProgrammableEdgeNode edited by
- (diff)
- 11:07 ProgrammableEdgeNode edited by
- (diff)
- 00:00 Milestone ProtoGENI: Implementation of clearinghouse and aggregate manager completed
- Establish a clearinghouse and an Aggregate Component Manager built …
04/20/09:
- 16:04 CmuLab edited by
- (diff)
- 15:39 CmuLab edited by
- (diff)
- 15:39 CmuLab edited by
- (diff)
- 14:19 ProtoGENI edited by
- (diff)
- 14:17 ProtoGENI edited by
- (diff)
- 14:14 PlanetLab edited by
- (diff)
- 13:33 DigitalObjectRegistry edited by
- Added the Exprimental Control Tool proposal reference (diff)
- 13:03 DTunnels edited by
- (diff)
- 12:00 DTunnels edited by
- (diff)
- 11:57 DTunnels edited by
- (diff)
- 11:38 Gec5Agenda edited by
- (diff)
04/17/09:
- 15:14 Mid-Atlantic Crossroads edited by
- (diff)
- 15:12 Mid-Atlantic Crossroads edited by
- (diff)
- 15:12 Mid-Atlantic Crossroads edited by
- (diff)
- 13:18 Data Plane Measurements edited by
- (diff)
- 13:14 Data Plane Measurements edited by
- (diff)
- 12:43 ProgrammableEdgeNode edited by
- (diff)
- 12:39 ProgrammableEdgeNode edited by
- (diff)
- 12:38 ProgrammableEdgeNode edited by
- (diff)
- 10:01 GeniServices edited by
- (diff)
- 08:59 Embedded Real-Time Measurements edited by
- (diff)
- 08:58 Embedded Real-Time Measurements edited by
- (diff)
- 08:54 Embedded Real-Time Measurements edited by
- (diff)
04/16/09:
- 11:47 GushDemoDesc created by
- 11:43 GushProto edited by
- (diff)
- 10:40 GpENI edited by
- (diff)
- 10:39 GpENI edited by
- (diff)
- 10:36 GpENI edited by
- (diff)
04/15/09:
- 19:06 DTunnels edited by
- (diff)
- 19:06 DTunnels edited by
- (diff)
- 19:05 DTunnels edited by
- (diff)
- 15:06 GeniControlBr edited by
- (diff)
- 15:05 GeniControl edited by
- (diff)
- 15:01 GeniControlBr edited by
- fix typos, place documents in historical context (diff)
- 14:39 WikiStart edited by
- (diff)
- 14:35 GeniOmisGEC4 edited by
- (diff)
- 14:34 GeniControlBr edited by
- (diff)
- 14:33 GeniServices/Tendrils/Fcf.html edited by
- (diff)
- 14:32 GWEB1 edited by
- (diff)
- 14:31 SubstrateRisks edited by
- (diff)
- 14:30 GeniServicesBg edited by
- (diff)
- 14:29 GeniFourYearColleges edited by
- (diff)
- 14:28 PlanetLab edited by
- (diff)
- 14:26 SubstrateOverlap edited by
- (diff)
- 14:25 GeniServices/mar08/index.html edited by
- (diff)
- 14:24 GeniOmisUseAssumptions edited by
- (diff)
- 14:23 GeniNewcomers edited by
- (diff)
- 14:21 GENISecurity edited by
- (diff)
- 14:20 OmisOverlap edited by
- (diff)
- 14:20 GpoDoc edited by
- (diff)
- 14:19 Data Plane Measurements edited by
- (diff)
- 14:18 MillionNodeGENI edited by
- (diff)
- 14:17 GeniSubstrate edited by
- (diff)
- 14:13 GeniOmis edited by
- (diff)
- 14:07 GeniOptIn edited by
- (diff)
- 14:06 GeniOptIn edited by
- (diff)
- 14:04 GeniServices edited by
- (diff)
- 14:00 GeniControl edited by
- (diff)
- 13:58 GeniControl edited by
- (diff)
- 13:08 MillionNodeGENI edited by
- (diff)
- 12:56 MillionNodeGENI edited by
- (diff)
- 11:29 GeniControl edited by
- (diff)
- 10:14 GushProto edited by
- (diff)
- 10:06 GushProto edited by
- (diff)
04/14/09:
- 14:27 Ticket #84 (Duplicate task?) created by
- This task seems to be duplicate to other existing tickets assigned to …
- 14:10 Ticket #83 (Status of ticket) created by
- Regarding: "Data plane integration with ProtoGENI. Be able to run …
- 14:03 Ticket #82 (Update CMU Milestone #1) created by
- Regarding: "Task 4: Data plane integration with ProtoGENI. Be able to …
- 13:58 Ticket #81 (Update CMU Milestone #1) created by
- Regarding: Task 1: Node configuration and boot management. Configure …
- 13:30 DTunnels edited by
- (diff)
- 13:03 DTunnels edited by
- (diff)
- 11:36 Ticket #80 (Propose date for 2nd draft of measurement system design document) created by
- Paul Barford to provide a date when his team will have a 2nd draft of …
- 11:29 Ticket #31 (Possible change to milestone date) closed by
- fixed: 4/14/09: Changed milestone due date to 4/27. Paul Barford will post …
- 11:24 Ticket #32 (Possible change to milestone date.) closed by
- fixed: 4/14/09: Changed milestone due date to 4/27. Paul Barford will post …
- 11:22 Ticket #11 (Adjust due date for design specification if necessary.) closed by
- fixed: 4/14/09: Changed milestone due date to 4/27. Paul Barford will post …
- 11:15 Ticket #79 (Post updated draft of Measurement Document) created by
- Paul Barford to post updated Measurement System document and solicit …
Note: See TracTimeline