03/01/09:
- 17:35 Data Plane Measurements edited by
- (diff)
- 17:31 Data Plane Measurements edited by
- (diff)
- 14:56 Milestone ERM: Perform discrete-event network simulations completed
- Perform discrete-event network simulations to quantitatively evaluate …
- 14:55 Milestone ERM: Develop specifications and networking protocols completed
- Develop (draft due 1 month earlier) final set of specifications and …
- 14:55 Milestone ERM: GENI requirements for real-time measurements completed
- Assess and evaluate GENI requirements for real-time user access to …
- 14:03 Milestone D Meas: Document embedded measurement capabilities completed
- Document embedded measurement capabilities of all substrate …
- 14:01 Milestone D Meas: Review all substrate technologies in spiral-1 completed
- Review all (optical, wireless, edge compute, etc.) substrate …
- 10:52 Ticket #55 (DTunnels Demo) created by
- This project includes following two main software components 1. TCS …
- 10:43 Ticket #54 (Gush demo) created by
- I plan to show a demo of the functionality of Gush on PlanetLab.
- 06:53 Milestone MAX: Purchase virtualization servers and connections completed
- Purchase virtualization servers and complete end-to-end VLAN …
- 06:52 Milestone MAX: Extend DRAGON/GRMS completed
- Extend DRAGON/GRMS as an aggregate manager to include optical and edge …
- 02:32 TIED edited by
- spelling typo. (diff)
- 01:27 Ticket #53 (GEC4 demo facilities for TIED) created by
- We'll bring a demo of a federated experiment across 2-3 testbed …
02/28/09:
- 13:13 Milestone WiMAX: 1b Validate open API capabilities of the WiMAX base station completed
- b) Validate, document and demo the open API capabilities of the WiMAX …
- 10:36 Ticket #52 (GpENI demo at GEC4) created by
- This will be an extraordinarily simple and rather boring demo that …
02/27/09:
- 17:35 Ticket #51 (UMLPEN Demo at GEC4) created by
- We plan to demo the initial integration of Programmable Edge Node with …
- 15:17 Ticket #50 (ProtoGENI demo at GEC#4) created by
- We plan to demo some new features of the ProtoGENI control framework …
- 14:23 Gec4Agenda edited by
- (diff)
- 14:01 Ticket #49 (ViSE GEC4 Demonstration) created by
- The ViSE project will demonstrate sensor control using the Orca …
- 13:57 Ticket #48 (DOME demo) created by
- We'll show a brick and the capabilities that we have implemented. …
- 12:38 Ticket #47 (ORCA-BEN vlan demo) created by
- We will present a brief demo of ORCA provisioning VLANs across BEN w/ …
- 11:30 Ticket #46 (Kansei DEMO) created by
- The KanseiGenie team led by Prof. Arora at Ohio State University is …
- 10:12 Embedded Real-Time Measurements edited by
- (diff)
- 10:09 Embedded Real-Time Measurements edited by
- (diff)
- 10:02 Embedded Real-Time Measurements edited by
- MS1, MS2, and MS3 submitted (diff)
02/26/09:
02/25/09:
- 18:05 Milestone SECARCH: S1.a Draft Security Design Report completed
- Develop and incrementally revise and extend a series of pragmatic …
- 18:05 Ticket #44 (Deliver final draft of Security document.) closed by
- fixed: Document is posted on wiki at …
- 18:02 Ticket #29 (Request feedback on strawman operational dataset from ORBIT control ...) closed by
- fixed: Held conf call with GPO and ORBIT. Marco sent info to GMOC, …
- 17:21 ExperimentLifecycleDocument edited by
- (diff)
- 17:13 Gec4Agenda edited by
- (diff)
- 17:12 Gec4Agenda edited by
- added working group sessions (diff)
- 17:08 Ticket #45 (GEC4 Demonstration Plans for Washington University SPP Node) created by
- We will remotely demonstrate an SPP Node. We will use two laptops, one …
- 13:24 GENISecurity edited by
- (diff)
- 13:22 GENISecurity edited by
- (diff)
- 13:18 GeniOmisGEC3Notes edited by
- I promised to take "Draft" off the page title, so now I did… (diff)
- 11:11 Embedded Real-Time Measurements edited by
- (diff)
- 11:08 Embedded Real-Time Measurements edited by
- (diff)
- 11:04 Embedded Real-Time Measurements edited by
- (diff)
- 11:03 Embedded Real-Time Measurements edited by
- (diff)
- 11:03 Embedded Real-Time Measurements edited by
- (diff)
- 10:59 Embedded Real-Time Measurements edited by
- (diff)
02/24/09:
- 15:55 RegionalOptIn edited by
- (diff)
- 15:49 GeniOptIn edited by
- (diff)
- 15:32 RegionalOptIn edited by
- (diff)
- 15:29 OptInReqs edited by
- (diff)
- 15:28 OptInReqs edited by
- (diff)
- 15:26 OptInReqs edited by
- (diff)
- 15:17 OptInReqs created by
- 14:33 RegionalOptIn edited by
- (diff)
- 11:48 Ticket #13 (Install new equipment in UKU Emulab) closed by
- fixed: New equipment has been installed in the UK Emulab and the new …
- 00:00 Milestone REGOPT: S1.a Produce opt-in requirements document completed
- Produce an opt‐in requirements document for the GENI Spiral 1 …
02/23/09:
- 09:58 Ticket #44 (Deliver final draft of Security document.) created by
- Deliver final draft of Security document (followup to first draft …
- 09:56 Ticket #26 (Provide new completion date for report.) closed by
- fixed: Preliminary draft delivered 2/9/09. Not posted on wiki, as some …
02/22/09:
02/20/09:
- 15:44 Ticket #37 (Provide source code for Xen operating system and its virtualization ...) closed by
- fixed: On Feb 12, 2009 Here is the URL for the DOME source code: …
- 14:18 Ticket #43 (Million Node GENI demo at GEC 4) created by
- Need place to put a laptop (table or similar) and wireless or wired …
- 11:28 ClusterB edited by
- (diff)
- 11:27 ClusterB edited by
- (diff)
- 09:54 Milestone DOME: 1b Implement, integrate and document the Xen operating system and its virtualization features completed
- 1b Implement, integrate and document the Xen operating system and its …
02/19/09:
- 14:54 ClusterB edited by
- add audio file (diff)
- 14:31 SpiralOne edited by
- typo fix typo (diff)
- 14:30 SpiralOne edited by
- typo (diff)
02/17/09:
- 17:52 ClusterB edited by
- (diff)
- 17:49 ClusterB edited by
- (diff)
- 17:36 ClusterB edited by
- (diff)
- 17:35 ClusterB edited by
- (diff)
- 17:34 ClusterB edited by
- (diff)
- 17:30 ClusterB edited by
- (diff)
- 17:26 ClusterB edited by
- (diff)
- 17:24 ClusterB edited by
- (diff)
- 17:21 ClusterB edited by
- (diff)
- 17:17 ClusterB edited by
- (diff)
- 17:16 ClusterB edited by
- (diff)
- 17:11 ClusterB edited by
- (diff)
- 17:11 ClusterB edited by
- (diff)
- 17:10 ClusterB edited by
- (diff)
- 17:07 ClusterB edited by
- (diff)
- 17:02 ClusterB edited by
- (diff)
- 16:58 ClusterB edited by
- (diff)
- 16:57 ClusterB edited by
- (diff)
- 15:29 ClusterB edited by
- (diff)
- 15:27 RelatedProjects edited by
- fix broken link (diff)
- 15:24 ClusterB edited by
- (diff)
- 15:22 ClusterB edited by
- (diff)
- 15:14 MillionNodeGENI edited by
- (diff)
- 15:10 MillionNodeGENI edited by
- (diff)
- 15:07 ClusterB edited by
- (diff)
- 15:05 ClusterB created by
- 15:05 SpiralOne edited by
- (diff)
- 15:02 Cluster B integration documents edited by
- (diff)
- 14:55 Cluster B integration documents edited by
- (diff)
- 14:49 Cluster B integration documents created by
- 14:45 SpiralOne edited by
- (diff)
- 14:40 Ticket #10 (Develop and document an approach to integration with one or more ...) closed by
- fixed
- 12:22 ProvisioningService edited by
- (diff)
- 12:12 GushProto edited by
- (diff)
- 12:11 GushProto edited by
- (diff)
- 12:07 GushProto edited by
- (diff)
02/16/09:
- 12:26 RelatedProjects edited by
- (diff)
- 12:15 GeniNationalLambdaRail edited by
- (diff)
- 12:15 GeniNationalLambdaRail edited by
- (diff)
- 12:09 GeniInternet2 edited by
- (diff)
- 12:08 GeniNationalLambdaRail created by
- 12:02 GeniInternet2 created by
- 11:56 SpiralOne edited by
- (diff)
02/14/09:
- 17:28 GeniNewcomers edited by
- (diff)
- 17:09 GeniWikiGettingStarted edited by
- (diff)
- 17:09 GeniWikiGettingStarted edited by
- (diff)
- 17:06 SpiralOne edited by
- (diff)
- 17:01 GeniWikiGettingStarted edited by
- (diff)
- 16:59 GeniWikiGettingStarted edited by
- (diff)
- 16:58 GeniNewcomers edited by
- (diff)
- 16:56 GeniWorkingGroups edited by
- (diff)
- 16:55 GeniWikiGettingStarted edited by
- (diff)
- 16:53 GeniSubstrate edited by
- (diff)
- 16:51 GeniServices edited by
- (diff)
- 16:50 GeniOptIn edited by
- (diff)
- 16:49 GeniControl edited by
- (diff)
- 16:48 GeniWorkingGroups edited by
- (diff)
- 16:46 GeniWorkingGroups created by
- 16:36 GeniOmis edited by
- (diff)
- 16:33 GeniNewcomers edited by
- (diff)
- 16:32 SpiralOne edited by
- (diff)
- 16:27 GeniNewcomers edited by
- added much intro text, reshuffled for clarity of exposition (diff)
- 16:08 GeniGlossary edited by
- (diff)
- 16:05 GeniGlossary edited by
- replace 'facility' with 'infrastructure' to avoid MREFC coloration (diff)
- 15:58 RelatedProjects edited by
- (diff)
- 15:55 FIREGENI edited by
- (diff)
- 15:52 FIREGENI edited by
- (diff)
- 15:32 FIREGENI created by
- 15:18 RelatedProjects edited by
- (diff)
02/13/09:
- 12:43 Ticket #42 (Raven demo at GEC4) created by
- We will demo Raven at GEC4 including the use of GENI credentials to …
02/12/09:
- 11:01 SpiralOne edited by
- added overview info & link to Overview Doc, reformatted a bit for clarity (diff)
- 10:47 GeniOmis edited by
- (diff)
- 09:03 Ticket #41 (Attach documentation of release of simple-to-install ORCA instance, a ...) closed by
- fixed
- 09:01 Ticket #41 (Attach documentation of release of simple-to-install ORCA instance, a ...) created by
02/11/09:
- 23:19 Gec4Agenda edited by
- Add NAP tour info (diff)
- 20:52 Ticket #40 (Install ORCA node agent software on remaining ViSE nodes when snow ...) created by
- Using the default Orca web portal, users are able to login and request …
- 20:50 Ticket #39 (milestone 1c completion) closed by
- fixed
- 20:49 Ticket #39 (milestone 1c completion) created by
- Per 1Q09 QRS: Milestone 3. Initial Orca integration. Xen and Orca …
- 20:40 Ticket #38 (milestone 1b completion) closed by
- fixed
- 20:38 Ticket #38 (milestone 1b completion) created by
- Submit document to show completion of the milestone.
- 20:34 Ticket #37 (Provide source code for Xen operating system and its virtualization ...) created by
- Effort has been completed to implement, integrate and document the Xen …
- 17:39 Ticket #28 (Request feedback on strawman operational dataset from PlanetLab) closed by
- fixed: Meeting held 2/11/09. Distributed Operational Dataset Strawman …
- 11:18 Milestone BGPMux: EGRE tunnel & node instantiation v0.1 sw release completed
- Software release published in the DTunnel open SVN respository at …
02/10/09:
- 00:00 Milestone INSTOOLS: S1.a Upgrade UKY Emulab completed
- Upgrade the University of Kentucky existing EduLab facility to become …
02/08/09:
- 18:02 GushProto edited by
- (diff)
- 17:55 GushProto edited by
- (diff)
- 17:46 GushProto edited by
- (diff)
- 17:46 GushProto edited by
- (diff)
02/06/09:
- 11:34 Gec4Demos created by
- Add demo info text
- 10:23 Gec4presentations created by
- Add presentation information. Agenda will need updating.
- 10:09 WikiStart edited by
- Add links to demos and presentations (diff)
02/05/09:
- 10:01 Ticket #36 (Plan for GEC4 demonstrations.) created by
- Collect demonstration requirements from all GEC4 projects. Work with …
02/04/09:
- 14:04 Ticket #35 (Obtain publicly-announceable GENI IP addresses) created by
- DTUNNEL project will need public IP addresses for GENI. GPO is …
02/03/09:
- 16:24 CmuLab edited by
- adding bit about system status (diff)
- 16:11 CmuLab edited by
- changing capitalization of homenet so it doesn't show up as a wiki word (diff)
- 16:11 CmuLab edited by
- (diff)
- 16:01 CmuLab edited by
- (diff)
- 15:59 Ticket #25 (make initial two nodes 'operational') closed by
- fixed: These nodes are fully operational. They can be accessed via SSH by …
- 14:20 Ticket #34 (Initial CMULab code merged with ProtoGENI) created by
- Dave says (on 2/2): > update to -HEAD ProtoGENI code is complete and …
- 14:09 CmuLab edited by
- (diff)
- 14:08 CmuLab edited by
- (diff)
- 09:54 PlanetLab edited by
- (diff)
- 00:00 Milestone CMU Lab: deploy and operate 2 HomeNet nodes in CMU lab completed
- Status recorded on CmuLab page.
02/02/09:
- 17:45 Ticket #33 (Waiting for release) created by
- Initial implementation is complete. Necessary tasks include finishing …
- 15:51 Milestone ViSE: S1.c Initial Shirako/ORCA integration- completed
- 1c [M3] Initial Shirako/ORCA integration. Xen and Shirako software …
- 14:13 DTunnels edited by
- (diff)
- 14:13 DTunnels edited by
- (diff)
- 10:55 Ticket #32 (Possible change to milestone date.) created by
- PI indicated that he might need to adjust delivery date for this …
- 10:31 Ticket #31 (Possible change to milestone date) created by
- PI indicated that he might need to adjust delivery date for this …
01/30/09:
- 15:30 Ticket #30 (Request feedback on strawman operational dataset from ORCA control ...) created by
- Schedule this topic for an upcoming ORCA/GPO meeting, as lack of …
- 15:27 Ticket #29 (Request feedback on strawman operational dataset from ORBIT control ...) created by
- Schedule this topic for an upcoming ORBIT/GPO meeting, as lack of …
- 14:34 Ticket #28 (Request feedback on strawman operational dataset from PlanetLab) created by
- Schedule this topic for an upcoming PlanetLab/GPO meeting, as lack of …