Timeline
12/31/08:
- 17:59 DTunnels edited by
- (diff)
- 00:00 Milestone UB_OANets: White paper on optical network completed
- A white paper (also serving as a quarterly/final report) on how a …
12/30/08:
- 16:53 Milestone ViSE: S1.b Field deployment of three sensor nodes completed
- 1b [M2] Field deployment of three sensor nodes; native …
12/29/08:
12/23/08:
12/19/08:
- 18:16 Milestone GushProto: User Documentation and Web Site completed
- Requested additional documentation on the web site -- Vic.
- 16:36 Milestone GushProto: v0.1 Implementation completed
- See ticket #9.
- 12:35 ProvisioningService edited by
- (diff)
- 12:28 ProvisioningService edited by
- (diff)
- 12:26 ProvisioningService edited by
- (diff)
- 09:36 GushProto edited by
- (diff)
12/17/08:
- 12:59 ORCABEN edited by
- (diff)
- 12:59 ORCABEN edited by
- (diff)
- 12:56 ORCABEN edited by
- (diff)
- 12:52 ORCABEN edited by
- (diff)
- 12:19 Ticket #18 (milestone 1a completion) closed by
- fixed: Completed 12/5/08: They are deployed on the CS Building, UMass MA2 …
- 12:18 Ticket #18 (milestone 1a completion) created by
- Per 4Q08 QSR: [1a] Assembly of three x86 sensor nodes. (2mo) Note: No …
- 12:13 Ticket #17 (milestone 1a completion) closed by
- fixed
- 12:11 Ticket #17 (milestone 1a completion) created by
- Submit document to show completion of milestone.
12/16/08:
- 10:27 WikiStart edited by
- added links to GEC1 and GEC2 archives (diff)
- 10:21 WikiStart edited by
- moved GEC3 out of announcements, added link to solicitation 2 (diff)
- 06:33 KanseiSensorNet edited by
- (diff)
12/15/08:
- 18:55 GENIMetaOps edited by
- (diff)
- 18:51 GENIMetaOps edited by
- (diff)
- 12:51 ORBIT edited by
- (diff)
- 09:38 Data Plane Measurements edited by
- (diff)
- 08:56 TIED created by
- new page name
- 08:55 SpiralOne edited by
- Change DETER to TIED (diff)
12/14/08:
- 10:46 Milestone MillionNodeGeni: VM Techniques completed
- Design document for end-host VM techniques.
- 10:46 Milestone MillionNodeGeni: End-host VM API completed
- Design document for end-host VM API.
12/13/08:
- 20:42 Ticket #16 (linked GENI ORCA/BEN wiki site has invalid certificate) closed by
- wontfix: GENI ORCA website certificate is signed by the RENCI Root CA. You can …
12/12/08:
- 18:31 WiMAX edited by
- remove extra spaces from milestone names (diff)
- 18:27 ViSE edited by
- remove spaces from milestone names (diff)
- 18:22 KanseiSensorNet edited by
- remove spaces from milestone names (diff)
- 18:20 DOME edited by
- remove spaces from milestone names (diff)
- 18:17 Ticket #16 (linked GENI ORCA/BEN wiki site has invalid certificate) created by
- Browsers complain (or in some cases block). Are there any plans to …
- 18:11 ORCABEN edited by
- remove spaces from mielstone names (diff)
- 18:08 InstrumentationTools edited by
- remove space from milestone name (diff)
- 18:06 EnterpriseGeni edited by
- removed space in milestone name (diff)
- 17:36 RegionalOptIn created by
- 17:36 GENISecurity created by
- 17:36 GENIMetaOps created by
- 10:38 WikiStart edited by
- change GEC4 and GEC5 dates (diff)
12/11/08:
- 11:31 ORBIT edited by
- fix broken milestone links (diff)
- 10:00 Ticket #15 (Add opt-in (not just user opt-in) to GENI glossary) created by
- Matt Mathis requests that the GENI glossary include the term "opt-in" …
12/10/08:
- 10:24 GeniOmisGEC3Notes edited by
- add some links to presentations and audio note (diff)
12/09/08:
- 22:59 GeniOmisGEC3Notes edited by
- Clean up in title (draft, link WG) (diff)
- 22:52 GeniOmisGEC3Notes created by
- 22:50 GeniOmis edited by
- Added GEC3 meeting notes page (diff)
- 16:34 KanseiSensorNet edited by
- (diff)
- 14:01 Ticket #14 (unable to associate milestone with ticket) closed by
- invalid: I believe this ticket should be in the syseng project. I moved it to …
- 13:44 Ticket #14 (unable to associate milestone with ticket) created by
- I opened ticket 13 to document a task on a milestone for the …
- 13:26 Ticket #13 (Install new equipment in UKU Emulab) created by
- 10/08 PI has ordered equipment and is preparing to integrate. …
- 11:22 InstrumentationTools edited by
- add milestone links (diff)
- 11:11 InstrumentationTools edited by
- (diff)
- 10:47 InstrumentationTools edited by
- (diff)
- 09:30 InstrumentationTools created by
12/08/08:
- 19:35 Ticket #12 (Understand DOR better and discuss its use with the various control ...) created by
- Work with CNRI to better understand the Digital Object Architecture …
- 19:29 DigitalObjectRegistry edited by
- (diff)
- 19:29 DigitalObjectRegistry edited by
- add a.k.a. names (diff)
- 19:22 Ticket #11 (Adjust due date for design specification if necessary.) created by
- PI indicated that he might need to adjust delivery date for this …
- 19:08 MeasurementSystem edited by
- add wiki page name in a.k.a titles (diff)
- 18:36 Ticket #10 (Develop and document an approach to integration with one or more ...) created by
- Work with U. Washington on developing an approach to integrating with …
- 17:30 GushProto edited by
- (diff)
- 17:26 Ticket #9 (Milestone date change.) created by
- Change milestone date from 11/14/2008 to 12/17/2008. Delay will allow …
- 15:21 MillionNodeGENI edited by
- fix typo (diff)
- 14:13 MillionNodeGENI created by
- 14:13 DigitalObjectRegistry created by
- 14:13 ProvisioningService created by
- 14:13 MeasurementSystem created by
- 09:54 GpENI edited by
- remove link to security milestone -- on going work (diff)
- 09:46 GpENI edited by
- (diff)
12/07/08:
12/05/08:
- 16:27 Ticket #8 (need README, LICENSE files) created by
- Waiting for necessary READMEs and LICENSE files, as described below. …
- 15:23 Milestone PlanetLab: component and clearinghouse release v0.1 completed
- Release component and clearinghouse packages v0.1, based on PlanetLab, …
- 15:15 Ticket #7 (PlanetLab: component and clearinghouse release v0.1) closed by
- fixed: Deliverable produced per 12/4/08 email from Larry Peterson. Software …
- 15:11 Ticket #7 (PlanetLab: component and clearinghouse release v0.1) created by
- milestone.
- 14:50 DOME edited by
- (diff)
- 14:18 Data Plane Measurements edited by
- (diff)
- 12:19 Milestone ViSE: S1.a Assembly of three x86 sensor nodes completed
- 1a [M1] Assembly of three x86 sensor nodes. (2mo) Note: No budget …
- 11:21 OverlayHostingNodes edited by
- expand Spiral 1 information, fix typo (diff)
- 09:40 SpiralOne edited by
- (diff)
- 09:12 DOME edited by
- (diff)
- 09:10 DOME edited by
- (diff)
12/04/08:
- 16:49 OverlayHostingNodes edited by
- fix links (diff)
- 16:45 Ticket #6 (Document I2 network engineering plan) created by
- Discuss requirements and plan for SPP deployment in Internet2 and document.
- 16:41 OverlayHostingNodes created by
- 12:14 Milestone DOME: 1a Implement, integrate and document the required DieselNet hardware updates completed
- 1a Implement, integrate and document the required DieselNet hardware …
- 11:32 GushProto edited by
- add more connectivity info (diff)
- 11:11 Ticket #5 (Deliver user study) closed by
- fixed
- 11:11 GushProto edited by
- (diff)
- 11:01 Ticket #5 (Deliver user study) created by
- Vic Thomas received user study on October 26, 2008. It is posted at …
- 10:43 GushProto created by
12/03/08:
- 16:58 Mid-Atlantic Crossroads created by
- change page name
- 16:56 SpiralOne edited by
- correct page name (diff)
- 16:36 CmuLab edited by
- (diff)
- 16:33 CmuLab created by
- 16:25 Ticket #4 (CMU Lab: integrate emulator nodes) closed by
- fixed
- 16:24 Ticket #4 (CMU Lab: integrate emulator nodes) created by
- Completed per email from Dave Andersen on 12/01/08. "The laptops in …
- 16:18 Ticket #3 (Bring up OpenVPN tunnels between CMU Lab and ProtoGENI) created by
- Dave Andersen to provide revised date for when GRE tunnels will be …
- 16:15 Ticket #2 (investigate VLAN connectivity to CMU) created by
- Look into how best to establish VLAN connectivity from CMU Lab …
- 16:07 Ticket #1 (CMU Lab: bare bones node configuration complete) closed by
- fixed
- 16:06 Ticket #1 (CMU Lab: bare bones node configuration complete) created by
- milestone:"CMU Lab: bare bones node configuration" completed per …
- 15:33 DTunnels edited by
- Add links to information from Nick Feamster and to VINI (diff)
- 14:50 DTunnels created by
- 14:39 presentations edited by
- minor edit - fixed typo (diff)
- 14:26 ProgrammableEdgeNode edited by
- (diff)
- 13:33 ProgrammableEdgeNode edited by
- (diff)
- 12:48 ORCABEN edited by
- (diff)
- 11:28 KanseiSensorNet edited by
- (diff)
- 11:28 KanseiSensorNet edited by
- (diff)
- 11:20 KanseiSensorNet edited by
- (diff)
- 10:41 KanseiSensorNet edited by
- (diff)
12/02/08:
- 16:24 PlanetLab created by
- 16:10 KanseiSensorNet edited by
- formatting (diff)
- 16:07 KanseiSensorNet created by
- 15:44 Data Plane Measurements edited by
- fix typo (diff)
- 15:06 Data Plane Measurements edited by
- Add alternate short name from ticket menu (diff)
- 15:00 GeniFourYearColleges edited by
- Add alternate short names (diff)
- 14:50 Embedded Real-Time Measurements edited by
- (diff)
- 14:50 Embedded Real-Time Measurements edited by
- (diff)
- 14:32 ProgrammableEdgeNode edited by
- Add more connectivity information (diff)
- 13:39 ORCABEN edited by
- (diff)
- 11:23 GpENI edited by
- revise milestone links to match title updates (diff)
Note: See TracTimeline
for information about the timeline view.