Opened 14 years ago
Closed 13 years ago
#575 closed (wontfix)
OnTimeMeasure GEC9 Demo Request
Reported by: | Prasad Calyam | Owned by: | hdempsey@bbn.com |
---|---|---|---|
Priority: | major | Milestone: | |
Component: | ONTIME | Version: | SPIRAL3 |
Keywords: | GEC9 | Cc: | |
Dependencies: |
Description
- Brief demo description
We will demonstrate how GENI experimenters can setup and use the OnTimeMeasure software for centralized and distributed measurements within their own ProtoGENI and *PlanetLab (New!)* slices. The demo will feature: researcher web-portal, user slice registration, distributed on-demand measurement, centralized on-going measurement, handling monitoring objectives, and user customizable dashboard. We will also demonstrate a *command-line control capability (New!)* of our OnTimeMeasure software that enables it to be integrated with experiment workflow tools.
- List of equipment that will need AC connections (e.g. laptop, switch hardware prototype,
monitor). (Just put in the number of connections needed if your demo description already lists
the equipment) 3 laptops, 1 network switch, 1 projector, 1 wide-screen monitor.
- Number of wired network connections (include required bandwidth if significant)
3 wired network connections.
- Number of wireless network connections (include required bandwidth if significant)
No wireless network connections
- Projector (y/n) Monitor (y/n, specify VGA or DVI. Specify resolution only if your software has
resolution restrictions) Bring your own projectors if feasible. Need 1 Projector, and 1 wide-screen monitor (VGA).
- Number of posters (poster boards are 20" x 30")
Will bring 1 Poster
- Number of static addresses needed (if any)
None
- Description of any special requests (There will be no layer 2 I2 or NLR VLANS to the GEC9 demo
floor--only production Internet service) None
Change History (3)
comment:1 Changed 14 years ago by
Owner: | changed from somebody to hdempsey@bbn.com |
---|
comment:2 Changed 14 years ago by
Component: | GPO → ONTIME |
---|---|
Status: | new → assigned |
comment:3 Changed 13 years ago by
Resolution: | → wontfix |
---|---|
Status: | assigned → closed |
Unable to confirm, due to lack of space. Owner notified previously, ticket update now.
Thank you for your demo request. We will update this ticket when the resources are confirmed.