id summary reporter owner description status priority milestone component version resolution keywords cc dependencies 280 SPP Hardware down in SLC and DC Josh Karlin Josh Karlin "According to John !DeHart SPP has had hardware failures in the SPP chassis at SLC and WASH. One blade in each chassis will need to be replaced (slot 3 in SLC and slot 4 in WASH). Will be prepped for shipping soon and hopes to install them the next time somebody heads to the PoPs for other work. Assigned to the demo as I'm not sure what else to assign it to." closed major SPP: S2.d demo6 GPO SPIRAL1 duplicate jdd@arl.wustl.edu chsmall@grnoc.iu.edu hdempsey@bbn.com