Opened 15 years ago

Last modified 14 years ago

#224 closed

milestone 1f completion — at Version 1

Reported by: hmussman@bbn.com Owned by: Ivan Seskar
Priority: major Milestone: WiMAX: 1f VLAN connections to the GENI backbone network
Component: WIMAX Version: SPIRAL1
Keywords: Cc: hmussman@bbn.com
Dependencies:

Description (last modified by hmussman@bbn.com)

From OMF Year 1 report, and email on 3/4/10:

Support for wide‐area (L2) connectivity Early in the year, we worked with the NJEdge regional consortium to connect us to regional center MAGPI East (Philadelphia). As part of this process, we acquired dedicated fiber along the Route 1 corridor jointly with NJEdge. In the first half of the year the section of missing fiber link between the Rutgers Food Science building and the Route 1 fiber corridor (~1 mile) was installed and optical lambda service from NJEdge was provisioned. This created 1Gbps optical link between our current location (Rt. 1 Technology Center, North Brunswick NJ) and carrier hotel (MagPI East) at 401 Broad Street in Philly on the 9th floor. The ION connection was not provisioned due to missing cross connect between I2 and MagPI. To avoid delays for other dependant deliverables, we used L2 tunneling protocol (L2TP) over the excess capacity of 400Mbps on Rutgers University's existing commodity feed to emulate expected L2 connectivity and implement wide area networking. This link was used for a variety of testing scenarios, including a single experiment with a mixture of individual resources on both ends of the tunnel (with experiment coordination from both ends of the tunnel over multicast traffic), running an aggregate manager for the resource on the opposite end of the tunnel and measurement collection across endpoints. We have successfully conducted a GEC demo that utilised L2 wide area network link from the New Jersey based ORBIT testbed to testbed facilities at NICTA in Sydney, Australia.

Change History (2)

comment:1 Changed 14 years ago by hmussman@bbn.com

Description: modified (diff)

Changed 14 years ago by hmussman@bbn.com

Attachment: ORBIT-NICTA GENI v2.pdf added
Note: See TracTickets for help on using tickets.