Opened 15 years ago

Closed 15 years ago

Last modified 15 years ago

#20 closed (fixed)

milestone 1b completion

Reported by: hmussman@bbn.com Owned by: hmussman@bbn.com
Priority: major Milestone: ViSE: S1.b Field deployment of three sensor nodes
Component: VISE Version: SPIRAL1
Keywords: Cc:
Dependencies:

Description

1b

[M2] Field deployment of three sensor nodes; native non-virtualized drivers; software testing. (January 1st). Completed. Received 123008:

We have field deployed the nodes constructed in milestone 1b, and installed a base image that includes the 3.2 version of Xen as well as the appropriate drivers for each sensing device and wireless/wired card. Since the driver for the PCI9812 Adlink Data Acquisition Card did not run under recent versions of XenLinux (2.6.18) we modified the source of the driver to support these; additionally, we obtained the most recent driver from Adlink under a new NDA and are currently testing its compatibility with Xen in the lab. Additionally, since the development of the base image is a tedious process we heavily documented it on the ViSE Trac Web Site (http://vise.cs.umass.edu). The documentation should prove useful to both the project, by preventing unnecessary work in replicating configurations/images, and users, by providing a detailed description of the node's foundational software layer (similar, in principle, to the Substrate Catalog for documenting GENI hardware). Additionally, we also set up an initial Trac web site and SVN repository for ViSE related software. The initial import into the SVN repository includes the drivers and firmware for the radar and a framework for developing Xen-compatible device drivers for each sensing device. In addition to installing the base image we have codified and documented appropriate settings for the wireless network card to communicate over long distances via 802.11b.

Change History (6)

comment:1 Changed 15 years ago by hmussman@bbn.com

Resolution: fixed
Status: newclosed

comment:2 Changed 15 years ago by hmussman@bbn.com

Component: GPOVISE

comment:3 Changed 15 years ago by hmussman@bbn.com

Resolution: fixed
Status: closedreopened

comment:4 Changed 15 years ago by hmussman@bbn.com

Owner: changed from somebody to hmussman@bbn.com
Status: reopenednew

comment:5 Changed 15 years ago by hmussman@bbn.com

Resolution: fixed
Status: newclosed

comment:6 Changed 15 years ago by hmussman@bbn.com

Summary: Completion of Milestone 1bmilestone 1b completion
Note: See TracTickets for help on using tickets.