Opened 9 years ago

Last modified 9 years ago

#1450 closed

FIWARE — at Initial Version

Reported by: hdempsey@bbn.com Owned by: peter.stickney@bbn.com
Priority: major Milestone:
Component: GPO Version: SPIRAL7
Keywords: GEC22 Cc: federico.alvarez@upm.es, maurizio.cecchi@telecomitalia.it, peter.fatelnig@ec.europa.eu
Dependencies:

Description

One-sentence layman's description:

Who should see this demo?

Demo description paragraph(s): “Elevator speech” description that identifies (a) what you are demonstrating and (b) why it is important. This description may be used for advance publicity and to help attendees identify the demonstrations they wish to see.

List of equipment that will need AC connections (e.g. laptop, switch, monitor):

2 (laptop, monitor)

Total number of wired network connections (sum standard IP and VLAN connections):

Number of wired layer 2 VLANs (if any): Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged.

Number of wireless network connections (include required bandwidth if significant):

1 standard IP. No significant bw.

Number of static addresses needed (if any):

Monitor (y/n, specify VGA or DVI):

1

Specify resolution only if your software has resolution restrictions.

Number of posters (max size poster boards are 30" x 40"):

1

Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.)

Estimated resource needs Joe Kochan entered by Dempsey as placeholder.

Change History (0)

Note: See TracTickets for help on using tickets.