id,summary,reporter,owner,description,status,priority,milestone,component,version,resolution,keywords,cc,dependencies 1339,SDX Poster,nriga@bbn.com,peter.stickney@bbn.com," Demo description paragraph (three sentence minimum): A poster describing a prototype SDX deployment. List of equipment that will need AC connections (e.g. laptop, switch, monitor): 1 Just put in the number of connections needed if your demo description already lists equipment. 0 Total number of wired network connections (sum standard IP and VLAN connections): 1 Number of wired layer 2 VLANs (if any): 0 Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. Number of wireless network connections (include required bandwidth if significant): 0 Number of static addresses needed (if any): 0 Monitor (y/n, specify VGA or DVI): Specify resolution only if your software has resolution restrictions. Number of posters (max size poster boards are 30"" x 40""): 1 Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.) Please locate this poster next to Brecht's international slice demo. ",closed,major,,GPO,SPIRAL7,fixed,GEC21,brecht.vermeulen@UGent.be mbrinn@bbn.com tlehman@maxgigapop.net,